Revised Stormwater Mangement Plan

Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                            PROJECT NOTES:
65-67 ELANDA STREET, SUNSHINE BEACH QLD     FRAMING                                                                 BRICK PIERS/COLUMNS/POSTS
                                            • ALL STRUCTURAL TIMBER FRAMING SIZES TO BE IN ACCORDANCE WITH A.S.     • PROVIDE BALCONY/ PORTICO &/OR ROOF SUPPORT WITH ENCASED


         PROPOSED DEVELOPMENT                 1684 NATIONAL TIMBER FRAMING CODE & OR ENGINEERS STRUCTURAL
                                              COMPUTATIONS.
                                            • FLOOR TO BE PREFABRICATED TO MANUFACTURERS SPEC. & ALLOW 360MM
                                              MIN' DEPTH TO ALLOW FOR SERVICES
                                                                                                                      SLIP JOINT SHS POSTS (FULL LENGTH U.N.O.) CHEM-SET TO CONCRETE
                                                                                                                      FOOTING TO ENGINEERS DETAIL
                                                                                                                    • HEADER COURSE TO TOP OF ALL BRICK PIERS LOWER THAN SOFFIT
                                                                                                                      LINE.
                                            • SPACED & FIXED TO PROVIDE SUPPORT @ 450MM CRS OR TO                   • USE 330MM BELOW FFL FOR DATUM OF PIER BRICK COURSES
                                              ENGINEERS/FLOOR MANUFACTURERS DETAILS.
                                                                                                                    TERMITE PROTECTION
                                            ROOF FRAMING                                                            • PROVIDE TERMITE MANAGEMENT SYSTEM DEEMED TO SATISFY A.S.
                                            • ROOF TRUSSES TO MANUFACTURERS SPECIFICATIONS. PITCH AS SHOWN            3660.1
                                              ON ELEVATIONS / ROOF PLAN.
                                            • SPACED & FIXED AT 600MM MAX. CRS.                                     STEPS/STAIRS & BALUSTRADES
                                            • SKILLION ROOF SPACED & FIXED AT 900MM MAX.; CRS.                      • ALL STEPS MUST COMPLY WITH B.C.A. 3.9.1.
                                            • GIRDER TRUSSES TO BE PLACED DIRECTLY OVER EXTERNAL WALL STUDS         • BARRIERS & HANDRAILS MUST COMPLY WITH B.C.A. 3.9.2.
                                              OR APPROVED LINTEL.
                                                                                                                    WET AREAS
                                            WALL FRAMING                                                            • WATERPROOFING OF WET AREAS TO COMPLY WITH A.S. 3870 &/OR
                                            • EXTERNAL STUD WALLS 90MM TH, U.N.O. @ 600 MAX. CRS                      B.C.A. 3.8.1.
                                            • INTERNAL STUD WALLS 90MM TH U.N.O. @ 600 MAX. CRS                     • WALL LINING TO WET AREAS TO BE 6MM VILLABOARD U.N.O..
                                            • ALL WINDOWS HEADS TO FINISH FLUSH WITH SOFFIT LINING U.N.O.           • CEILING 'DIRECT FIX' 10MM UNISPAN (OR EQUIVALENT)
                                            • LINTEL SIZES TO ENGINEERS DESIGN                                        PLASTERBOARD.
                                            • WALL BRACING, FIXING, TIE DOWNS, DURABILITY NOTES & ANY ADDITIONAL    • ALL WALL TILING HEIGHTS ARE NOMINAL, AND TO BE ADJUSTED ON
                                              ENGINEERING REQ. TO BE AS PER ENGINEERS DETAIL                          SITE TO SUIT. SHOWER TILING TO EXTEND MIN. 20MM ABOVE SCREEN.

                                            GARAGE DOOR                                                             GLAZING
                                            • 2130MM GARAGE DOOR OPENING, FRAMING AT 2105MM AFFL                    • WINDOW HEAD HEIGHT DIMENSION GENERALLY TAKEN TO THE
                                            • 2325MM GARAGE DOOR OPENING, FRAMING AT 2400MM AFFL                      NEAREST CORRESPONDING BRICK COURSE (WHERE BRICKS ARE IN
                                            • GARAGE DOOR OPENING > 2130MM, FRAMING 25MM BELOW OPENING                USE).
                                              DIMENSION                                                             • WIN. SUPPLIER TO SUPPLY COVER BOARDS TO ALL CORNER WIN.
                                                                                                                      U.N.O.
                                            CLADDING                                                                • ALUMIN. WIN. & DOORS TO SIDE & REAR ELEVATIONS U.N.O.
                                            ROOF CLADDING/PLUMBING                                                  • ALL GLAZING TO COMPLY WITH A.S. 1288 GLASS IN BUILDINGS, & WITH
                                            • CLADDING AS SPECIFIED ON ELEVATIONS                                     A.S. 4055 FOR WIND LOADING
                                            • SELECT COLORBOND FASCIA & GUTTER                                      • ALL WINDOWS WITH A SILL HEIGHT OF 2M OR MORE ABOVE GROUND
                                            • SELECT COLORBOND (RAINHEADS WHERE NOTED)/ DOWNPIPES TO BE               LEVEL SHALL BE RESTRICTED TO BE UNOPENABLE BEYOND 125MM, TO
                                              CONNECTED TO U/G DRAINAGE                                               COMPLY WITH BCA 3.9.2.5 REQUIREMENTS (U.N.O.)
                                            • BOX GUTTERS AS PER HYDRAULIC ENGINEERS DETAILS.                       • FLASHINGS MUST BE PROVIDED TO ALL SIDES OF OPENINGS, EXCEPT
                                                                                                                      AS PERMITTED, ANDTHE FLASHING EXTENDS NOT LESS THAN 110 MM
                                            INTERNAL CEILING/WALL - GENERAL.                                          BEYOND THE REVEALS. REFER NCC 3.5.4.6;
                                            • CEILING 'DIRECT FIX' 10MM UNISPAN PLASTERBOARD (OR APPROVED
                                              EQUIVALENT) U.N.O.                                                    ENERGY EFFICIENCY NOTES
                                            • WALLS TO BE 10MM PLASTERBOARD U.N.O (EXLC. FIRE RATED WALLS).         • PROVIDE BULK CEILING INSULATION AS PER STD SPECIFICATIONS
                                                                                                                      (U.N.O.).
                                            EXTERNAL CEILING/WALL - GENERAL.                                        • PROVIDE EXTERNAL WALL INSULATION AS PER STD SPECIFICATIONS
                                            • CEILINGS 'DIRECT FIX' 10MM UNISPAN (OR APPROVED EQUIVALENT)             (U.N.O.)
                                              PLASTERBOARD U.N.O.                                                   • PROVIDE WEATHER STRIPPING TO ENTRY & LAUNDRY DOORS.
                                            • BRICK COURSING TO BE SET OUT TO ACHIEVE 2120 ABOVE F.F.L. FOR ALL
                                              WINDOW HEADS U.N.O.                                                   MISCELLANEOUS
                                            • PROVIDE FC. SHEET INFILL ABOVE SIDE & REAR ELEVATION WINDOWS &        • FLUES FOR ALL HEATERS (WHERE APPLICABLE) ARE TO BE INSTALLED
                                              DOORS WHERE INDICATED BY HATCHING, TO WALLS WITH SELECTED FACE          TO MANUFACTURERS SPECIFICATIONS
                                              BRICK. USE BLUEBOARD INFILL WHEN SELECTED RENDERED FINISH             • ALL WATER CLOSET DOORS TO BE REMOVABLE IN ACCORDANCE WITH
                                            • USE F.F.L. FOR DATUM OF WALL BRICK COURSES                              B.C.A. 3.8.3.
                                            • A.J. - DENOTES BRICKWORK ARTICULATION JOINTS. REFER TO ENGINEERS      • ALL PLUMBING, DRAINAGE & ASSOCIATED WORKS TO COMPLY WITH
                                              SLAB DESIGN &/OR BCA 3.3.1.8 FOR FULL HEIGHT MASONRY ARTICULATION       THE PLUMBING CODE OF AUSTRALIA, BCA & A.S. 3500
                                              JOINT LOCATIONS.
                                            • ALL PARAPET WALLS TO BE PROVIDED WITH COLORBOND METAL                 CONCRETE SLAB ON GROUND
                                              CAPPING/FLASHING (50MM MIN' LAP TO ALL JOINS WITH CONTINUOUS          • CONCRETE SLAB TO ENGINEERS DETAIL
                                              SILICON SEAL BETWEEN & 30MM MIN' VERTICAL OVERHANG.)
                                            • PROVIDE CAVITY FLASHING & WEEP HOLES ABOVE LOWER STOREY OPEN.         STEEL FRAMING REQUIREMENTS (WHERE APPLICABLE):
                                            • RENDERER IS TO ENSURE WINDOW & DOOR OVERFLOW DRAINAGE HOLES           • 70MM STEEL FRAME & TRUSSES REQUIRING THE ISSUE OF A SIGNED
                                              ARE KEPT FREE OF RENDER & ARE NOT BLOCKED, IF RENDERED.                 COMPLIANCE CERTIFICATE FOR THE BUILDING DESIGN - FORM 15 UPON
                                                                                                                      COMPLETION AND PRIOR TO FINAL CERTIFICATION
                                            SOFFIT DETAIL                                                           • STEEL FRAMES AND TRUSSES TO COMPLY WITH:
                                            • 4.5MM FC SHEET (U.N.O.)                                               • AS/NZS 1170.0 STRUCTURAL DESIGN ACTIONS: PART 0:GENERAL
                                            • SPECIFIED EAVE WIDTH, MEASURED FROM FACE OF BRICK.                      PRINCIPLES
                                            • ADD 160 TO EAVE WIDTH IN LIGHTWEIGHT CLAD AREA. DISREGARD             • AS/NZS1170.1 STRUCTURAL DESIGN ACTIONS: PART1: PERMANENT,
                                              (PACKING/ CLADDING)                                                     IMPOSED AND OTHER ACTIONS
                                                                                                                    • AS/NZS 4600 COLD-FORMED STEEL STRUCTURES
                                            ENGINEERING                                                             • AS4055 WIND LOADS FOR HOUSING
                                                                                                                    • AS4100 STEEL STRUCTURES CODE
                                            • BUILDING TO CHECK ALL ENGINEERING DETAILS AND DOCUMENTATION,          • AS 3623 DOMESTIC METAL FRAMING
                                              BEAM AND POST LOCATIONS, PRIOR TO ORDERING MATERIALS OR STARTING      • AS 3566.1 SELF DRILLING SCREWS
                                              ON SITE.
                                            • SETOUT OF STEELWORK AND STRUCTURE, INCLUDING POST, BEAM &             GENERAL NOTES
                                              EXISTING BEARER LOCATIONS (WHERE APPLICABLE) ARE THE
                                              RESPONSIBILITY OF THE BUILDER. ALL POST LOCATIONS TO BE CHECK         • WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE. PLANS
                                              MEASURE AND CONFIRMED ON SITE, PRIOR TO CONCRETE SLAB                   DRAWN AT SCALE 1:100 @ A3 UNO. PRINTED PLANS MAY NOT BE TO
                                              CONSTRUCTION.                                                           SCALE. ALWAYS REFER TO DIMENSIONS OR CONTACT INVILLA PTY LTD
                                            • RETAINING WALLS AND ASSOCIATED DETAILS ARE TO BE AS PER THE             TO CONFIRM DIMENSIONS.
                                              ENGINEERS DETAILS.                                                    • PROVIDE 1:100 FALL TO ALL BALCONIES & PATIO'S U.N.O.
                                            • LEVELS (RL, FFL), SETOUTS & ASSOCIATED DETAILS ARE TO CONFIRMED ON    • PROVIDE 1800HT FENCING TO COMMON BOUNDARIES U.N.O
                                              SITE BY THE BUILDER PRIOR TO CONSTRUCTION TAKING PLACE.               • RETAINING WALL HEIGHT(S) & LOCATION AS PER ENGINEERS DETAILS.
                                            • THE ENGINEER (STRUCTURAL, HYDRAULIC, TRAFFIC, CIVIL ETC) & INVILLA    • ALL INTERNAL STAIR AND EXTERNAL STEPS/RAMPS TO COMPLY WITH
                                              PTY LTD TAKE NO RESPONSIBILITY FOR ALTERATIONS TO THE PLANS &/OR        SLIP-RESISTANCE RATINGS AS PER NCC 3.9.1.4
                                              DETAILS BY THE BUILDER DURING OR AFTER 'STAGE C' OF INVILLA PTY LTD   • 190MM CORE FILLED BLOCKWORK W/ 28MM FURRING CHANNELS ON
                                              DESIGN AGREEMENT WITH THE CLIENTS.                                      WALL CLIPS (30/190/30) WITH FRAMEWORK TO EXTEND TO BLOCK WALL
                                                                                                                      U.N.O. (REFER TO DETAIL)

                                                                                                                                   H       5TH RFI RESPONSE                              20.09.22
                                                                                                                                   G       4TH RFI RESPONSE                              08.08.22
                                                                                                                                   F       3RD RFI RESPONSE                              23.05.22
              3D IMAGE FROM ELANDA STREET                                                                                          E       2ND RFI RESPONSE                              01.03.22
                                                                                                                                   D       RFI RESPONSE                                  20.12.21
                                                                                                                                   C       DA ISSUE                                      18.10.21
                                                                                                                                   B       SKETCH ISSUE                                  22.09.21
                                                                                                                                   A       SKETCH ISSUE                                  15.09.21

                                                                                                                               ISSUE       AMENDMENTS                                     DATE




                                                                                                                                                        © COPYRIGHT
                                                                                                                                   INVILLA Pty Ltd. Reproduction forbidden. Unathorised use,
                                                                                                                                  reproduction or adaption is forbidden and will be prosecuted.

                                                                                                                               PROJECT: PROPOSED
                                                                                                                                     DEVELOPMENT
                                                                                                                               65-67 ELANDA ST, SUNSHINE
                                                                                                                               BEACH QLD

                                                                                                                               LOT: 410-411                       SP/RP: 48112

                                                                                                                               LOCAL GOVT: SUNSHINE COAST COUNCIL

                                                                                                                               TITLE:                COVER PAGE

                                                                                                                               DRAWN:           MJ                CHECKED:          MJ

                                                                                                                               DATE:            19.09.2022 APPROVED:                JV

                                                                                                                               SCALE @ A2: 1 : 1                  JOB No. 67ELA

                                                                                                                                           DA APPROVAL                                SHEET:
                                                                                                                                             REVISION: H
                                                                                                                                        NOT FOR CONSTRUCTION                          01 of 17
Log in to download the original file

Revised Stormwater Mangement Plan.pdf · 9.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.