Original source · versioned page text
Revised Stormwater Mangement Plan
Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.
Original PDF page 32, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 9210
BUILDING SETBACK
8360
OMP
PROPERTY BOUNDARY 33.544M | 89° 56' 36"
BUILDING SETBACK
BUILDING SETBACK
D
APPROX.
OMP
1689
2189
2160
11815
BUILDING SETBACK
500
DP DP ROOF OVER STORY BELOW
ROBE
9764
WC
BALCONY
OMP
BED 2 BATH WIR BED 1
PROPERTY BOUNDARY 15.091M | 359° 59' 36"
PLANTER
LINEN
VERTICAL BATTEN SCREEN
LINEN
FEATURE ARCHES OVER WINDOWS H1
AWNING TO PROVIDE WEATHER
17 ENS PROTECTION BEDROOM
BED 3 BELOW
ROBE
1 16
2 15
LIFT 3 14
LDRY 4 5 6 7 8 9 10 11 1213
PROPERTY BOUNDARY 15.091M | 179° 58' 36"
4 5 6 7 8 9 10 11 1213
3 14
LDRY
LIFT 2 15
ROBE
1 16
17
B BED 2 ENS B
PLANTER
H2
LINEN
9460
BUILDING SETBACK
9160
BALCONY
OMP
BED 3 BATH
BED 1
ROBE
VERTICAL BATTEN SCREEN
WIR
BUILDING OVERALL
BUILDING OVERALL
C C
27000
27000
ENTRY H2 & H3
1860
BALCONY
ROBE
WIR BED 1
BED 3 BATH
LINEN
1010
PLANTER
H3 300
H 5TH RFI RESPONSE 20.09.22
10010 BED 2 ENS G 4TH RFI RESPONSE 08.08.22
BUILDING SETBACK
ROBE
F 3RD RFI RESPONSE 23.05.22
"9
29' 2
E 2ND RFI RESPONSE 01.03.22
9160
LDRY
LIFT D RFI RESPONSE 20.12.21
197°
OMP C DA ISSUE 18.10.21
800 B SKETCH ISSUE 22.09.21
BUIL 7794
3M |
A SKETCH ISSUE 15.09.21
DING
SETB
1 3 .5 9
A ACK A ISSUE AMENDMENTS DATE
7469
ARY
4 5 6 7 8 9 10 11 12 13
OMP
14
LDRY 3
UND
ROBE
LIFT 2 15
BED 3 1 16
O
AWNING TO PROVIDE WEATHER
TY B
17
ENS 300
PROTECTION BEDROOM
BELOW
P ER
PR O
FEATURE ARCHES OVER WINDOWS
H4
LINEN
PROPERTY BOUNDARY 16.098M | 359° 59' 36"
© COPYRIGHT
INVILLA Pty Ltd. Reproduction forbidden. Unathorised use,
2050 reproduction or adaption is forbidden and will be prosecuted.
VERTICAL BATTEN SCREEN
LINEN PROJECT: PROPOSED
PLANTER
BALCONY
DEVELOPMENT
BATH BED 1
BED 2 WIR 65-67 ELANDA ST, SUNSHINE
WC BEACH QLD
ROBE
6000
BUILDING SETBACK
500
DP DP ROOF OVER STORY BELOW OMP LOT: 410-411 SP/RP: 48112
BUIL 7978
SETBACK
DING
SETB
2003
2029
ACK LOCAL GOVT: SUNSHINE COAST COUNCIL
OMP
1503
TITLE: FIRST FLOOR PLAN
PROPERTY BOUNDARY 29.463M | 269° 56' 38"
D MJ
8360 DRAWN: CHECKED:
OMP
DATE: 19.09.2022 APPROVED: JV
9210
BUILDING SETBACK SCALE @ A2: 1 : 100 JOB No. 67ELA
DA APPROVAL SHEET:
REVISION: H
NOT FOR CONSTRUCTION 06 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.