Revised Stormwater Mangement Plan

Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________

1. Executive Summary
WC Designs Pty Ltd has been engaged to prepare a Conceptual Site Based Stormwater
Management Plan (SWMP) for the proposed townhouse development at 65 & 67 Elanda St,
Sunshine Beach QLD 4567. The land parcel is legally described as Lots 410 & 411 on
RP48112, and located within the Noosa Shire Council.

The development proposes four (4) townhouses on the site, as illustrated by the architectural
plans contained in Appendix A. This report is prepared to support the development
application and provides a site-based stormwater concept design to ensure the stormwater
runoff from the site does not result in actionable nuisance or worsening of discharge to any
properties within its vicinity (upstream, downstream or adjacent to the site) and cast adverse
impact on flooding or the peak discharge flow and duration for all storm events up to the 1%
AEP (Annual Exceedance Probability) storm events.

Hydrological analyses are carried out using run-off routing technique through XP-Storm-
2016. The peak flows are identified for the pre-developed and post-developed scenarios for
all storm events up to 1% AEP (Annual Exceedance Probability). To mitigate the flow
increase, two 7KL above-ground roof water detention tanks are proposed for the
development.




File Name:            WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:             E                                                                    4
Log in to download the original file

Revised Stormwater Mangement Plan.pdf · 9.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.