Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Revised Stormwater Mangement Plan

Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 48, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                        Node - Post-dev

               ARRZ3 100y5m[Max 0.073]   ARRZ3 100y10m[Max 0.063]          ARRZ3 100y20m[Max 0.074]   ARRZ3 100y25m[Max 0.082]

              ARRZ3 100y30m[Max 0.077]   ARRZ3 100y45m[Max 0.069]          ARRZ3 100y60m[Max 0.078]   ARRZ3 100y90m[Max 0.063]


       0.08



       0.07



       0.06



       0.05
Flow




       0.04



       0.03



       0.02



       0.01



       0.00
               1 Tue                            1AM                                     2AM                              3AM
          Dec 2020                                                  Time

                                                        Node - Pre-dev

               ARRZ3 100y5m[Max 0.035]   ARRZ3 100y10m[Max 0.047]          ARRZ3 100y20m[Max 0.064]   ARRZ3 100y25m[Max 0.069]

              ARRZ3 100y30m[Max 0.066]   ARRZ3 100y45m[Max 0.060]          ARRZ3 100y60m[Max 0.068]   ARRZ3 100y90m[Max 0.053]
       0.07



       0.06



       0.05



       0.04
Flow




       0.03



       0.02



       0.01



       0.00
               1 Tue                            1AM                                     2AM                              3AM
          Dec 2020                                                  Time


[OCR of page images]
Flow

Flow

Node - Post-dev

Pe pe
ARRZ3 100y5m[Max 0.073] ARRZ3 100y10m[Max 0.063] ARRZ3 100y20m[Max 0.074] ARRZ3 100y25m[Max 0.082]
P| ,

ARRZ3 100y30m[Max 0.077] ARRZ3 100y45m[Max 0.069] ARRZ3 100y60m[Max 0.078] ARRZ3 100y90m[Max 0.063]

0.08

0.07

0.06

0.05

0.04

0.03

0.02

0.01

 

 

 

1AM 2AM 3AM
Dec 2020 Time

Node - Pre-dev

Pe pe

ARRZ3 100y5m[Max 0.035] ARRZ3 100y10m[Max 0.047] ARRZ3 100y20m[Max 0.064] ARRZ3 100y25m[Max 0.069]
P| ,

ARRZ3 100y30m[Max 0.066] ARRZ3 100y45m[Max 0.060] ARRZ3 100y60m[Max 0.068] ARRZ3 100y90m[Max 0.053]

0.07

0.06

0.05

0.04

0.03

0.02

0.01

0.00 — ssn a

 

 

 

1 Tue 1AM 2AM 3AM
Dec 2020 Time
Log in to download the original file

Revised Stormwater Mangement Plan.pdf · 9.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.