Original source · versioned page text
Revised Stormwater Mangement Plan
Attached to the e-mail Email 2 of 2 - Outstanding Matters - 67 Elanda Street - MCU21/0190.
Original PDF page 53, section 38. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn42.5
42
Approved
S
43 SITE BOUNDARY
FENCE CONTOURS
Name W.Clark RPEQ No. 16580
10.5 NATURAL SURFACE
EDGE OF BITUMEN
0 PROPOSED 7kL BELOW CONTOURS
44. GROUND DETENTION TANK Signed
Date 10 JANUARY 2022
PROPERTY DESCRIPTION CP LAYOUT PLAN 1 0 1 2 3 4 5m
Drawing No. Rev.
LOT 410, 411 on RP48112 Scale 1:100 SCALE 1 : 100
COUNCIL REF: NA
(BEFORE REDUCTION)
WCD-22936-SK1 G
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.