Original source · versioned page text
Attachment 3 - ED 20265 OPW ISSUE H
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
200 ORGANIC MULCH TO BE
ROAD PARK MOUNDED TO COLLECT WATER. All planting stock to NATSPEC.
SIDE 70 SIDE Landscape Contractor to obtain
MAINTAIN CLEAR ZONE
an independent NATSPEC
AROUND TRUNK certification for all planting stock.
120
ADVANCED TREE STOCK
PROVIDE SLOW RELEASE
200 x 100mm F14 TREATED
HWD SLEEPER (CLASS 1)
FERTILIZER + WATER
750mm
TREATED TO H5. CRYSTALS AS PER
5mm CHAMFER TO ALL MANUFACTURERS 2 No 50mm x 50mm x 2400mm
1200mm
EXPOSED EDGES. SPECIFICATION F14 hardwood stakes
140 200
POT POT Position stakes out
3 COATS OF SELECT TIMBER STAIN
CERTIFIED IMPORTED SOIL side of root ball
300
TURF TURF EXCAVATE TO GENERALLY
2 X WIDTH OF ROOT BALL 50mm wide Jutemat / hessian in
50mm
30° figure 8 loop
150
CULTIVATED SUBGRADE
100mm nominal composted
NATURAL organic compost mulch
GROUND
SUBGRADE Organic mulch to be mounded
to collect water. Maintain clear
zone around trunk
100
550mm
REFER TO SPEC FOR ADDITIONAL INFORMATION Tree pit to be excavated to min
width of root ball)
100mm
N20 NO FINES 900mm depth and backfilled with
(Generally 2 x
certified imported soil (max 2%
CONCRETE
140mm / 200mm POT PLANTING DETAIL NTS c
min 900
organic content)
ed
FREE DRAINING Edges of pit to be porous
GRAVEL TO BASE (ripped if required)
150
Provide slow release fertilizer as
HARDWOOD BOLLARDS per manufacturers specification
450 DIA
min 1500
(Generally 2 x width of root ball)
Sub-grade cultivated / ripped to
HARDWOOD TIMBER BOLLARD G1
ACCESS GATE
REFER TO ENGINEERS DETAIL ADVANCED TREE STOCK
150mm depth
NTS
DETAIL PLANTING DETAIL
NTS c ed
100MM NOMINAL COMPOSTED
ROAD
KERB
REINSTATE TURF TO FINISH 25mm
BELOW CONCRETE EDGE ORGANIC COMPOST MULCH.
1500 ORGANIC MULCH TO BE MOUNDED
SELECT EXTRUDED CONCRETE TO COLLECT WATER. MAINTAIN CLEAR
EDGE. ZONE AROUND TRUNK. CE
SPADE CUT EDGE
100mm NOMINAL COMPOSTED
ORGANIC COMPOST MULCH
25
1500
100MM NOMINAL COMPOSTED CE
CERTIFIED IMPORTED SOIL ORGANIC COMPOST MULCH.
ORGANIC MULCH TO BE MOUNDED
TO COLLECT WATER. MAINTAIN CLEAR
COMPACTED SUB - BASE FOOTING TO ZONE AROUND TRUNK.
SUBGRADE
100MM BELOW CONCRETE EDGE
SPADE CUT EDGE CE
SUBGRADE RIPPED
TO 150mm STAND ALONE KERB ONLY
EXTRUDED CONCRETE (CE)
EDGE DETAIL NTS c ed
DIAL BEFORE OPEN SPACE TREE STREET TREE
YOU DIG PLANTING DETAILS NTS PLANTING DETAIL NTS
WWW. 1100.com.au
LANDSCAPE DOCUMENTATION / OPW - SHEET 21
AMENDMENTS
PROJECT
PROPOSED SUBDIVISION AT
element design
issue date description
A 24.07.20 ISSUE FOR APPROVAL
B 18.08.20 ISSUE FOR APPROVAL NOOSA CIVIC, WALTERHAY DRIVE,
C 24.08.20 ISSUE FOR APPROVAL landscape architecture NOOSAVILLE
D 26.08.20 ISSUE FOR APPROVAL
MASTER PLANNING SUBDIVISIONS
E 09.10.20 RESPONSE TO RFI COMMERCIAL DEVELOPMENTS RESORTS Date JULY 2020
F 14.10.20 RESPONSE TO RFI PARKLANDS REVEGETATION MULTI-UNITS
G 25 10.20 RESPONSE TO RFI
151 Brisbane Rd. Mooloolaba
CLIENT
STOCKWELL PTY LTD Scale
H 09 02.21 RESPONSE TO RFI Phone 07 5444 6155 Fax 07 5444 6055 Design JV Drawn JV
PO Box 1546, Buderim QLD 4556 DWG
TM
Copyright in the whole and every part of this document belongs to
ELEMENT DESIGN QLD PTY LTD and may not be used, sold, [email protected]
TITLE DETAILS PLAN Sheet 21 OF 23
transferred, copied or reproduced in whole or in part in any manner or
form or in or on any media to any person without the prior written
consent of ELEMENT DESIGN QLD PTY LTD.
TM
ED 20265 OPW 21 issue H
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.