                         INITIAL DETENTION SIZING                                                              Written by OC 17/07/2009

                         Based on QUDM 5.05 'Flood-Routing for Sm all Basins - Initial Sizing'                 Updated by TWN Jan 2013                                                                                                                  INITIAL ESTIMATED Vs
                                                                                                                                                       Qo (m 3/s)                                                                                                                                                                                   Maxim um
                                                                                                    Rainfall                                                                      Vi Approx. Inflow Volum e (m 3)
                                    Flood Event                                                                                           Qi (m 3/s)    ( al lo wab le                                                 Ratio r = (Qi-Qo)/Qi                    Culp (1948)          Boyd (1989)   Carroll (1990)   Basha (1994)      Average Vs     Estim ated
                                                                                                 Intensity                                             o ut l et f l o w)
                                                                                                                                                                                         Vi = 4 * Qi * tc/ 3
                                                                 Discharge Coeff.                                                                                                                                                                                                                                                                       Vs
                                                                    of Runoff                                                                                                                                                                                Vs=r{(1+2r)/3}Vi         Vs=r*Vi     Vs={r(3+5r)/8}Vi Vs={r(2+r)/3}Vi
                                                                Existing        Post-D'm ent     Existing                 Post-D'm ent
                                                                   Cy               Cy               I                           I                                                                                                                              Vs m 3/s             Vs m 3/s        Vs m 3/s         Vs m 3/s
                                                                                                  m m /hr                    m m /hr
                                         1                        0.56              0.69           129                         129          0.042           0.034                               17                              0.19                                1.5                 3.2             1.6             2.3                  2.1           3.2
                                         2                        0.6               0.73           164                         164          0.057           0.047                               23                              0.18                                1.8                 4.0             2.0             2.9                  2.7           4.0
                                         5                        0.67              0.82           201                         201          0.078           0.064                               31                              0.18                                2.6                 5.7             2.8             4.2                  3.8           5.7
                                         10                       0.7               0.86           223                         223          0.091           0.074                               36                              0.19                                3.1                 6.8             3.3             4.9                  4.5           6.8
                                         20                       0.74              0.90           252                         252          0.107           0.088                               43                              0.18                                3.5                 7.6             3.7             5.5                  5.1           7.6
                                         50                       0.81              0.99           291                         291          0.136           0.112                               55                              0.18                                4.5                 9.9             4.8             7.2                  6.6           9.9
                                        100                       0.84              1.00           320                         320          0.152           0.127                               61                              0.16                                4.3                 9.7             4.6             7.0                  6.4           9.7


                                                                                                                                                ESTIMATION OF PEAK FLOWS
                                                                                                                                                                            ARI                 Existing                                                                  Post development                                    Difference in runoff
                                                                                                                                                                                                           C        I (mm/hr)          Q (m3/min)        Q (m3/s)              C     I (mm/hr) Q (m3/min)       Q (m 3/s) Increase (L/s)          Increase %
                                                                                                                                                                             1                           0.56          129                2.05                0.034          0.69       129       2.53              0.042        8                      23.2%
                                                                                                                                                                             2                            0.6          164                2.80                0.047          0.73       164       3.40              0.057       10                      21.7%
                                                                                                                                                                             5                           0.67          201                3.83                0.064          0.82       201       4.68              0.078       14                      22.4%
                                                                                                                                                                             10                          0.70          223                4.44                0.074          0.86       223       5.45              0.091       17                       22.9%
                                                                                                                                                                             20                          0.74          252                5.30                0.088           0.9       252       6.44              0.107       19                       21.6%
                                                                                                                                                                             50                          0.81          291                6.70                0.112          0.99       291       8.19              0.136       25                      22.2%
                                                                                                                                                                            100                          0.84          320                7.64                0.127          1.00       320       9.09              0.152       24                       19.0%


                                                                                                                                                                                                                                              CALCULATION OF INITIAL RUNOFF - QUDM Section 4.00
                                                                                                                                                                                                                                                                    PRE-DEV'T     POST-DEV'T
                                                                                                                                                                                                                                              Catchment area (ha )                                   0.171             0.171
                                                                                                                                                                                                                                              Impervious area (ha)                                   0.000             0.139 Ha
                                                                                                                                                                                                                                              Fraction impervious                                      0.0                 82 %


                                                                                                                                                                                                                                              Intensity - 1 hr, 10 yr (mm/hr)                         72.2                               IFD: TEWANTIN
                                                                                                                                                                                                                                              t c existing (min.)                                     5.00
                                                                                                                                                                                                                                              t c post-developed (min.)                               5.00




          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016
Full text of the other 6 pages

Page 2

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016




                                      -
                         Refer to the conditions of
                           the permit approval

Page 3

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.4m 2.4m 2.4m
ACCESSIBLE ACCESSIBLE
CAR SPACE CAR SPACE
0.1m
w
5 0.1m |__f1.20mm
fe sis
Gt 2B
3
0.1m. Ke TT OF
S S
& S
3 3
3

 

 

150mm DIA BOLLARD 1300mm HIGH
ABOVE GROUND LEVEL WITH ROUNDED
TOP. PAINT SAFETY YELLOW

ACCESSIBLE CAR PARKING SPACES
IN ACCORDANCE WITH AS2890.6

P.W.D. PARKING SPACE TYP.

SCALE 1:100

SPACE IDENTIFICATION

EACH DEDICATED SPACE SHALL BE IDENTIFIED BY MEANS OF A WHITE

SYMBOL OF ACCESS IN ACCORDANCE WITH AS 1428.1 BETWEEN 800mm

AND 1000mm HIGH PLACED ON A BLUE RECTANGLE WITH NO SIDE MORE

THAN 1200mm, PLACED AS A PAVEMENT MARKING IN THE CENTRE OF THE

SPACE BETWEEN 500mm AND 600mm FROM ITS ENTRY POINT AS

ILLUSTRATED.

SPACE DELINEATION

PAVEMENT MARKINGS SPECIFIED IN ITEMS (A) AND (B) OF THIS CLAUSE

SHALL BE YELLOW AND SHALL HAVE A SLIP RESISTANT SURFACE.

RAISED PAVEMENT MARKERS SHALL NOT BE USED FOR SPACE

DELINEATION.

PAVEMENT MARKINGS SHALL BE PROVIDED AS FOLLOWS:

1. DEDICATED PARKING SPACES SHALL BE OUTLINED WITH UNBROKEN
LINES 80 TO 100mm WIDE ON ALL SIDES EXCEPTING ANY SIDE
DELINEATED BY A KERB, BARRIER OR WALL.

2. SHARED AREAS SHALL BE MARKED AS FOLLOWS:

2.1. WALKWAYS WITHIN OR PARTLY WITHIN A SHARED AREA SHALL BE
MARKED WITH UNBROKEN LONGITUDINAL LINES ON BOTH SIDES OF
THE WALKWAY EXCEPTING ANY SIDE DELINEATED BY A KERB,
BARRIER OR WALL.

2.2. OTHER VACANT NON-TRAFFICKED AREAS, WHICH MAY BE
INTENTIONALLY OR UNINTENTIONALLY OBSTRUCTED (E.G. BY
UNINTENDED PARKING), SHALL BE OUTLINED WITH UNBROKEN LINES
80 TO 100mm WIDE ON ALL SIDES EXCEPTING ANY SIDE DELINEATED
BY A KERB, BARRIER OR WALL, AND MARKED WITH DIAGONAL
STRIPES 150 TO 200mm WIDE WITH SPACES 200mmM TO 300mm
BETWEEN STRIPES. THE STRIPES SHALL BE AT AN ANGLE OF 45 +10
DEGREES TO THE SIDE OF THE SPACE.

2.3. NO SHARED AREA MARKINGS SHALL BE PLACED IN TRAFFICKED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEGEND
(BSS SS SSS SSE 7 CAR PARKING BAYS
Tp 100
— 100
CHEVRON
PE 100
100

 

NOTES

 

1. ALL LINEMARKING TO BE REFLECTORISED WHITE.
2. FINAL SIGN LOCATIONS TO BE DETERMINED ON SITE BY

THE SUPERINTENDENT.

3. EXISTING LINEMARKING SUPERSEDED BY NEW LINEMARKING
IS TO BE REMOVED BY ROUTING OR OTHER METHOD
APPROVED BY QUEENSLAND TRANSPORT.

4. COLOUR OF ALL REFLECTORISED PAVEMENT MARKERS TO
BE WHITE EXCEPT AT EDGE LINES TO ONE WAY
PAVEMENTS, WHICH SHALL BE AS FOLLOWS:

RIGHT EDGE - WHITE
LEFT EDGE - RED

5. ALL TRAFFIC SIGNS TO BE SIZE ‘B’ UNLESS NOTED

OTHERWISE.

6. FOR GUIDE POST INSTALLATION AND DETAILS, REFER
QUEENSLAND TRANSPORT STANDARD DRAWING No.1356

7. FOR TRAFFIC SIGN SUPPORT DETAILS, REFER QUEENSLAND
TRANSPORT STANDARD DRAWING No.’s 1363 TO 1368.

8. ALL ROUTE NAMES (e.g. NIELSONS ROAD) ON NEW GUIDE
SIGNS TO BE BLACK LETTERING ON WHITE BACKGROUND.

ALL SIGN MATERIAL TO BE CLASS 1.

10. DIRECTION SIGNS ARE SHOWN INDICATIVE ONLY. DETAILED

 

NOOSA COUNCIL
APPROVED PLAN
OPW16/0229 16 DEC 2016

 

 

 

FILL WITH APPROVED SEALANT

 

 

 

 

 

 

 

 

+_N12 TRIMMER EACH SIDE DOWEL CRADLE JOINT (D.C.J.)
15 PROVIDE 50 x 3 SOFT SAW CUT
SLAB MESH \qypr| (SOFT SAW CUT BLADE TO BE USED
DIAMOND SAW IS NOT ACCEPTABLE)
3" Am z K
ee

 

 

% SAW CUT AS SOON AS SAW CUT
MACHINE CAN BE PLACED ON WET
CONCRETE. FILL WITH APPROVED
SEALANT.

 

CONSTRUCTION INSPECTION REQUIREMENTS

IF CERTIFICATION OF THE WORKS IS REQUIRED TO BE PROVIDED BY C.R.W.P. THE

5

6. REINFORCEMENT INSPECTION (CONCRETE PAVEMENT ONLY).
71. FINAL PRACTICAL COMPLETION INSPECTION.
STORMWATER:-

8 PRE-EXCAVATION INSPECTION (IF ORDERED).

9 PRE-BACKFILL PIPE INSPECTION.

FOLLOWING INSPECTIONS (TO BE UNDERTAKEN BY C.R.WP. DURING CONSTRUCTION) ARE

PRE-SEAL INSPECTION/PROOF ROLL. MIN. 10 TONNE WATER TRUCK REQUIRED.

 

10mm (HDG) PLATE DOWEL
CRADLE SYSTEM INCLUDING
DOWEL SLEEVES AT 450 CRS.

DOWEL CRADLE JOINT DETAIL (D.C.J.)

 

SPACING 6.0m (MAX)

SCALE 1:10

* PLATE DOWEL TO BE PLACED IN ACCORDANCE
WITH MANUFACTURERS SPECIFICATIONS, TYPICAL.

 

 

 

 

 

MANDATORY. * CUT ALL TRANSPORTATION CROSS WIRES
IMMEDIATELY PRIOR TO CONCRETE PLACEMENT.
EARTHWORKS:- 10 x 10 APPROVED SEALANT.
1. SUBGRADE PROOF ROLL. MIN. 10 TONNE WATER TRUCK REQUIRED. CLOSED CELL CROSSLINKED DOWEL EXPANSION JOINT (0D.E.1.
ROADWORKS:- POLYETHYLENE FOAM (85-150kg/m’) SLAB MESH
2. PRE-EXCAVATION INSPECTION (IF ORDERED). TO FULL DEPTH OF SLAB EDGE.
3. SUBGRADE PROOF ROLL (BOTTOM OF BOX). MIN. 10 TONNE WATER TRUCK 1/N12 EACH SIDE OF JOINT | |. 50 EDGE COVER TYP.
REQUIRED. |
4. RECTIFIED SUBGRADE PROOF ROLL (IF ORDERED). MIN. 10 TONNE WATER TRUCK | oj }- —— —— ——~ —— — i } & a s
REQUIRED. =

 

 

 

 

— PROVIDE 10mm PLATE DOWEL (HDG)
INCLUDING DOWEL SLEEVES AT 450

GRAVEL SUB-BASE REFER TO NOTE 3

DESIGNS ARE TO BE USED FOR ORDERING.
11. ALL SIGNAGE, LINEMARKING & RRPMs ARE TO BE
PREPARED IN ACCORDANCE WITH THE CURRENT

QUEENSLAND TRANSPORT ‘MANUAL OF UNIFORM TRAFFIC

CONTROL DEVICES’ (M.U.T.C.D).

12. SUITABLE EXISTING STREET AND ROAD SIGNS TO REMAIN
IF APPLICABLE (AS DIRECTED BY THE SUPERINTENDENT)

 

 

 

 

 

 

 

 

1. FINAL PRACTICAL COMPLETION INSPECTION.

BIORETENTION:-

12. BASIN BOX OUT AND SUBSOIL DRAINAGE INSPECTION.

13. FINAL PRE-LANDSCAPING INSPECTION. (CONTRACTOR TO PROVIDE

WATER SUPPLY & SEWER:-
14. PRE-EXCAVATION INSPECTION (IF ORDERED).
15. PRE-BACKFILL INSPECTION.

17. FINAL PRACTICAL COMPLETION INSPECTION.

 

10. STRUCTURE/PIT INSPECTION (PRIOR TO FINISH SURFACE APPLICATION).

BIORETENTION FILTER MEDIA TEST CERTIFICATE PRIOR TO INSPECTION).

16. STRUCTURE/PIT INSPECTION (PRIOR TO FINISH SURFACE APPLICATION).

MAX. CRS. IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATIONS.

DOWEL EXPANSION JOINT (D.E.J.)

 

SPACING 24m
SCALE 1:10

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

*DOWELS TO BE PLACED IN ACCORDANCE WITH
MANUFACTURERS SPECIFICATIONS, TYPICAL.

* PROVIDE 24 HOUR MINIMUM BETWEEN ADJACENT POUR BREAKS, TYPICAL.

*DOWELS SHALL BE CHAIRED INDEPENDENTLY TO MESH. DO NOT TIE TO MESH.
PROVIDE ADDITIONAL N12 TRIMMER EACH SIDE TO SECURE DOWEL SLEEVES.

*DOWELS MUST BE KEPT STRAIGHT & TRUE DURING CONCRETE PLACEMENT.

 

 

 

 

 

 

 

 

 

 

   
  

 

 

 

 

 

 

 

CONCRETE NOTES (ROADS)

1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH
AS.3600, CURRENT EDITION WITH AMENDMENTS.

2 CONCRETE QUALITY (UNLESS SHOWN OTHERWISE):
CEMENT SHALL BE TYPE ‘A’ NORMAL PORTLAND CEMENT.
MAXIMUM SIZE OF COARSE AGGREGATE SHALL BE 20 mm.
CONCRETE SHALL HAVE THE FOLLOWING SLUMP DURING PLACING:
-BEAMS, SLABS ANDFOOTINGS =
-COLUMNS ANDWALLS SS
ADMIXTURES SHALL NOT BE USED WITHOUT THE WRITTEN
APPROVAL OF THE ENGINEER.

ELEMENT CONCRETE STRENGTH SPECIAL REQUIREMENTS

ROAD N32 NIL
STRENGTH SHALL BE VERIFIED BY PROJECT CONTROL TESTING.

3. CLEAR CONCRETE COVER TO REINFORCEMENT INCLUDING TIES AND
STIRRUPS, UNLESS SHOWN OTHERWISE, SHALL BE:

ELEMENT FORMED & FORMED & §=NO FORMWORK
SHELTERED EXPOSED
SLABS 30mm 40mm 40mm

COVER TO REINFORCEMENT SHALL BE OBTAINED BY THE USE OF
PLASTIC BAR CHAIRS. ALL CHAIRS SHALL BE SPACED AT
MAXIMUM 800mm CENTRES EACH WAY.

4 — REINFORCEMENT SYMBOLS:
"S" :GRADE 230S HOT ROLLED DEFORMED BAR TO AS.1302
"N" :GRADE 500N HOT ROLLED DEFORMED BAR TO AS.1302
"R" :GRADE 230R HOT ROLLED PLAIN BAR TO AS.1303
“W" :HARD DRAWN PLAIN WIRE TO AS.1303

5 REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND IS NOT
NECESSARILY SHOWN IN TRUE PROJECTION.

6 WELDING OF THE REINFORCEMENT WILL NOT BE PERMITTED UNLESS
SHOWN ON THE STRUCTURAL DRAWINGS.

| |

Q OQ OQ QO

7 FABRIC LAP DETAIL: 25mm

 

L_wap TWO CROSS WIRES

8 ALL TOPSOIL AND UPPER STRATA CONTAINING ORGANIC MATTER
SHALL BE REMOVED AND REPLACED BY APPROVED FILLING
MATERIAL COMPACTED IN LAYERS NOT GREATER THAN 150mm
TO MINIMUM 95% STANDARD COMPACTION.

9 CONCRETE SIZES SHOWN ARE MINIMUM AND NO REDUCTIONS BY
DUCTS, PIPES, ETC., SHALL BE MADE WITHOUT THE APPROVAL OF

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AREAS. THE SUPERVISING OFFICER. SIZES DO NOT INCLUDE THICKNESS OF
APPLIED FINISHES.
1/N12 CONT. TRIMMER 10 x 10 APPROVED SEALANT.
PROVIDE MIN 1:100 FALL ALONG . SL92 MESH 10 TRIM ALL PENETRATION WITH 2/N12 BARS EACH SIDE AND
LENGTH OF V-DRAIN TO a LO TOP COVER | DISPLACE REINFORCEMENT EITHER SIDE. U.N.O.
APPROVED POINT OF DISCHARGE. ae 11 PIPES OR CONDUITS SHALL NOT BE PLACED WITHIN THE CONCRETE
0.75m | KOO o — — — —' —} \ COVER TO REINFORCEMENT WITHOUT THE APPROVAL OF THE
HEAVY DUTY GRATE & FRAME , AIR | 7 ENGINEER.
LIP LEVEL (LL) —— (‘WEBFORGE’ OR EQUIVALENT) ~-scnree “ a 12 ALL CONCRETE SHALL BE COMPACTED USING HIGH FREQUENCY
ee MIN 100mm THICK M25 CONCRETE \ VIBRATORS.
3 4 TANG BARS CAST WITH SL72 MESH CENTRE DEPTH. 4 13 CURINGS OF ALL CONCRETE SURFACES SHALL COMMENCE
INTO CONCRETE BUILDING FOOTING IMMEDIATELY AFTER SURFACES ARE FINISHED AS SPECIFIED AND
150 SIZE 150 NOTES \ SHALL CONTINUE FOR A MINIMUM OF 7 DAYS.
DEPTH (REF. TABLE) < PROVIDE CONTROL LL AND EPOXY sISTIN
. CL
(REF. TABLE) . GRATE & FRAME TO BE CAST IRON OR ~~ JOINTS @ 5m CENTRES. SLAB 220 DOWEL s00Ly, HOG) AT 10 | 300 CLOSED CELL CROSSLINKED Me SLABS WITH SPECIFIED ROUGH FINISH ARE TO BE Kep ERE OF
HOT DIPPED GALV. MILD STEEL. MAX. CRS. USE SQUARE PLASTIC POLYETHYLENE FOAM (85-150kg/m’) BLEED WATER AND FLOATED TO PREVENT THE FORMATION OF
< O => _ CONCRETE TO BE CLASS 25N. CONCRETE LINED V-DRAIN DOWEL SLEEVES IN ACCORDANCE WITH TO FULL DEPTH OF SLAB EDGE. PLASTIC SHRINKAGE CRACKS.
te | = _ ALL PITS TO BE CAST-IN-SITU. SCALE 1:10 MANUFACTURERS SPECIFICATIONS. GRAVEL SUB-BASE REFER TO NOTE 3 15 AN ALIPHATIC ALCOHOL EVAPORATION RETARDANT SHALL BE USED
a SIZE TABLE ON ALL SLABS IMMEDIATELY AFTER FIRST SCREED IN ACCORDANCE
a EDGE THICKENING (ET1) WITH THE MANUFACTURERS SPECIFICATIONS. AN ALIPHATIC ALCOHOL
30 MIN FALL DEPTH | wibTH LENGTH ———— HE SHALL BE USED TO AID THE FINISHING OF THE CONCRETE SURFACE,
WATER SHALL NOT BE USED.
SECTION UP To SCALE 1:10
900mm | 600mm | 600mm REE OR ke RENEE CRATE VO SUIT) *PROVIDE 24 HOUR MINIMUM BETWEEN ADJACENT POUR BREAKS, TYPICAL.
200 t0 soonm | Seomm COMPLETE WITH RAILS. * DOWEL SHALL BE INSTALLED STRAIGHT AND TRUE TO SLAB EDGE. NOTES
oe 1. SUBGRADE TO BE PROOF ROLLED BEFORE PLACEMENT OF SUBGRADE GRAVEL.
le UPSTREAM PIPE BACKFILL/BEDDING 100 600 LAP = 2. DIMENSIONS ARE IN MILLIMETRES UNLESS SHOWN OTHERWISE.
Oe TO BE DRAINED INTO GULLY WITH - b— a JOINT SEALANTS 3. GRAVEL SUB-BASE SUBJECT TO TESTING MIN. 100mm U.N.O.
FLOW Tr FABRIC COVERED SEEPAGE PIPE | ALL SLAB SEALANTS SHALL BE SIKAFLEX PRO 2HP POLYURETHANE 4. THICKNESS OF CONCRETE IS STRUCTURAL THICKNESS.
= BE CONNECTION. - A 1 x JOINT SEALANT OR APPROVED EQUIVALENT ALL CONCRETE FINISHES SHALL BE ALLOWED FOR
- CENTRE OF PIT eT. SEALANT MUST BE APPLIED STRICTLY TO MANUFACTURER'S ADDITIONAL eg. DEPTH OF CONCRETE STAMPING.
KL , x TRENCH DEPTH ‘D'
a FOR CO-ORDINATES PSII 1 VARIES FOR 1 IN 100 SPECIFICATIONS WITH REGARD TO JOINT CONFIGURATION, SURFACE 5. JOINTS TO BE PLACED AT MAXIMUM SPACINGS UNLESS NOTED OTHERWISE.
“ | GRADE 75mm MIN. PREPARATION, PRIMING, DEBONDING, APPLICATION AND CLEANING. 6. SOYA YE BoOOM FINCH SMOOTH TROWLED JOINTS AND EDGE TREATMENTS
FUTURE CONSTRUCTION SUBGRADE ASSUMED MIN. . :
CBR. 15(SOAKED4 DAYS) |Z
— VARIES
- “| N12 at 300 BOTH WAYS
| PLAN 40mm COVER
GRATED DRAIN DETAIL
FIELD GULLY DETAIL Soa
SCALE 1:20 SCALE 1:20
IN ASSOCIATION WITH PTY | SUITE 7 ADVANCE BUSINESS CENTRE DESIGNED JAW. CLIENT JOB NO.
SCALE A 0 01 02 03 04 05 C 7 = LTD | 39 LAWRENCE DRIVE NERANG ORAWN — D.S. & A.S. DEVELOPMENTS PTY. LTD. 16441
ee PO BOX 2711 NERANG QLD 4211 — PROJECT
PRELIMINARY 0 05 1 (eS) p- (07) 5878 4100 CHECKED JAW. Pp R 0 p 0 S F D F A C T 0 R Y DRAWING NO.
NOT FOR CONSTRUCTION : oO F. (07) 5578 4092 APPROVED FOR AND ON BEHALF OF
SCALE Bo ne | 20 o} : ( ) consutraustrauin | c7ENS REGAN GROUP PTY LTD AT LOT 12. 40 GATEWAY DRIVE. NOOSAVILLE <=
: [email protected] (RPECQ No 4) ' ‘
A 09/16 | ORIGINAL ISSUE D.P.G. JAW. tember Firm lo
(No. | DATE | ISSUE REVISED | CHECKED DATUM 277? SCALES SHOWN ARE AT A1 SIZE CONSULTING ENGINEERS * CIVIL * STRUCTURAL W: www.cozreg.com.au Pea Ne eae CONSTRUCTION DETAILS A J

 

 

 

 

 

 

 

 

 

Page 4

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016


[OCR of page images]
 

1.

2.

 

 

 

 

 

 

 

 

 

 

 

 

--RL.7.300

REFER BIO-RETENTION
NOTES FOR
ADDITIONAL DETAILS.

   
 

 

 

 

 

 

 

 

-
a! REMOVABLE BOLLARDS
el
REFER TO DETAIL oN
DRIVEWAY CARPARK 1
CONCRETE V-DRAIN. REFER BUILDING aL780
DETAIL ON DRG C04. | FFL.8.300 es
“wef WHEEL STOP
SA + SEE = TS — Sn I
E | ,
ET1 EXISTING SURFACE — 100mm SUB-BASE MATERIAL CBR45 ry Y
PROVIDE IMPERVIOUS LINING ———]
SUBGRADE TO BE PROOF ROLLED BY REFER TO DETAIL A’ Hess

DATUM RL.6.000

CONSULTING ENGINEER & PRIOR TO
PLACEMENT OF SUB-BASE MATERIAL.

REFER TO RETAINING WALL RW1 DETAIL — |

— 1

 

 

 

 

 

 

 

 

   
   

RP.BDY

 

MAX.

[- ORIFACE INSIDE WALL OF PIT TO ENGINEERS DETAILS.
> 150mm EXTENDED DETENTION DEPTH

400mm SANDY LOAM

150mm SAND
y- 150mm DRAINAGE GRAVEL

[- PROVIDE IMPERVIOUS LINER

RL.7.600 DISCHARGE
CONTROL PIT.
I — 150mm ONSITE DETENTION DEPTH 10m?
1:2 BATTER

 

BIO-RETENTION

 

 

NOOSA COUNCIL
APPROVED PLAN
OPW16/0229 16 DEC 2016

 

 

WHEEL STOP ~~

 

 

0.S.D. OVERFLOW
rRL.7.450

 

 

 

 

 

REFER TO CONCRETE RETAINING ——|_
WALL CRW DETAIL

 

 

 

DATUM RL.6.000

 

RP.BDY

oe fa ™ 1:2 BATTER

SCALE 1:50

 

 

 

 

SECTION “AY
NOY,

 

 

 

 

 

FIX FILTER CLOTH TO FACE
OF WALL 300mm WIDE WITH

 

 

MIN.100mm COVER (SIMILAR Ht

 

SECTION (B
SCALE 150  \ C02

TO IPWEAQ STD. DRGS.)

 

 

DETAIL “A
SCALE 150 \-_/

 

 

 

 

BIO-RETENTION NOTES

NOTE:-

CONSTRUCTION, ESTABLISHMENT AND MAINTENANCE
OF THE BASIN TO BE CARRIED OUT IN ACCORDANCE
WITH SECTION 5.5 OF THE WSUD TDG

CONSTRUCTION MONITORING IN ACCORDANCE WITH HEALTHY
WATERWAYS BIORETENTION BASIN CONSTRUCTION AND

ESTABLISHMENT SIGN OFF FORMS (INCL PRE-START
AND FORMS A-G THROUGHOUT CONSTRUCTION )

NOTE:-FILTER BED DETAILS

MINIMUM FILTER DEPTH IS TO BE 0.90m min AND IS
to CONSIST OF THE FOLLOWING MEDIA

1. 0.40m OF SANDY LOAM MATERIAL WITH A
HYDRAULIC CONDUCTIVITY OF 180mm/h
AND PARTICLE SIZE OF 0.45mm

2. 0.15m DEPTH COURSE SAND
PARTICLE SIZE TYPICALLY 1mm

3. 0.15m (min) DEPTH GRAVEL DRAINAGE.
PATICLE SIZE 5-10mm SCREENINGS

4, uPVC (SLOTTED) PIPE AT 1.50m SPACING
TO BE INCLUDED IN FREE DRAINING AREA TO
ASSIST IN DRYING OUT THE DEVICE. THIS PIPE IS
TO CONNECT TO STORMWATER DRAINAGE.

NOTE:- STAGE CONSTRUCTION

FUNCTIONAL INSTALLATION
(TO BE COMPLETED DURING SUBDIVISION CONSTRUCTION

1, BULKING OUT AND TRIMMING

2. INSTALLATION OF OUTLET STRUCTURE

. INSTALLATION OF DRAINAGE LAYER (INCL SLOTTED PIPES)

. PLACEMENT OF TRANSITION LAYER AND FILTER MEDIA

. PLACEMENT OF TEMPORARY PROTECTION LAYER

. PLACE SILT FENCES AROUND THE BOUNDARY OF BASIN
TO EXCLUDE SILT AND RESTRICT ACCESS

nu ew

SEDIMENT AND EROSION CONTROL

(DURING BUILDING CONSTRUCTION)

THE BASIN IS TO BE MAINTAINED AS A SEDIMENT
AND EROSION CONTROL DEVICE.

OPERATIONAL ESTABLISHMENT

(AT THE COMPLETION OF BUILDING PHASE)

THE TEMPORARY LAYER ARE TO BE REMOVED TOGETHER
WITH ACCUMULATED SEDIMENT AND THE BASIN PLANTED
WITH THE PROPOSED LANDSCAPE DESIGN.

 

 

HEIGHT VARIES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POST AS SPECIFIED OR TO MATCH
BOLLARD TYPE SPECIFIED FOR
PARK. HEIGHT AS SPECIFIED.
OPTIONS INCLUDE :

x 100x100 HARDWOOD POST

x 102x102 SHS POST

x 100x100 RECYCLED

PLASTIC POST.

REFER HINGE DETAIL
FOR FIXINGS

CONCRETE PATH AS
SPECIFIED OR 900x500x250
N25 CONCRETE FOOTING

REMOVABLE BOLLARD - SECTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONSTRUCT JOINTS AT 8m CRTS.
3-R12 GAL DOWELS HORIZ. 300 LONG.
PROVIDE SQUARE CAP ONE END.
10mm COMPRESSIBLE FILLER FULL

POLYETHYLENE SEALANT TO 3 SIDES.

SCALE 1:10
0.20m
FORMED CONCRETE N32 [Wo 20 RADIUS
( J \
E

: SP
— 5
Pa =
Ee
—
o
x
4b ¢ =

N12-300 STARTERS 200 COG
S0COVER __
N12-200 HORIZ. 600 LA2 ——____|
3-L11 TM TOP & BTM, ——}-— —|— —
1 |, HEIGHT AND PROVIDE 10x10
< Ee
R10-600 LIGS 50 COVER ——t= §
a A co
|.
o Le

 

 

 

 

0.30m |

CONCRETE RETAINING WALL - CRW

 

1:20

225 OUTLET PIPE

 

 

 

 

 

 

 

 

 

 

 

10mm GALV. M/S FABRICATED HASP WITH
15mm CUT-OUT FOR PAD EYE. WELD

MASONRY ANCHORS FIXED TO HWD POST.

 

 

 

 

 

 

 

OR BOLLARD CAN FOLD DOWN.

 

 

 

 

 

 

 

 

 

 

IL.6.400
—— 10mm GALV M/S FABRICATED HINGE
FIXED THROUGH POST TO PAD EYE
WITH 4xM12 H/H GALV. BOLTS.
Ee
& 4 10mm M/S PLATE PAD EYE
FIXED TO SHS POST. 4xM12 C/S
E
oc
2
E Y HINGE MECHANISM SO PLATE
©
BN 2 4
4 . a 4xM12 C/S MASONRY ANCHORS
» » 6 OR APPROVED EQUIVALENT.
A 6 R > 4
yt > Ld > LJ A

REMOVABLE BOLLARD - HINGE DETAIL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1:5
190 Ht BLOCKS
CONCRETE FILLED
NOTE WN 150 THick clay PLUG.
PROVIDE CONTROL Pa
JOINTS at 6.0m |
ENTRES MAXIMUM Ly
CENTRES MAXIM NN) -—+— nt6-400 HORIZ,, LAP 500
HEIGHT | BASE N ID
H B v8 —1— 300 FREE DRAINING
1000 800 lhl BACKFILL.
41200 1000 N N16-400 VERTICAL
1400 1200 NIN
1600 1400 ! 55 CLEAR COVER, STARTERS & VERT.
1800 1600 NIN
Na] N-——— wrwto arch spec.
Ya) | ~ 100 dia. AGG DRAIN IN 300 OF
CLEANOUT BLOCKS | = NOMINAL 10mm BLUE METAL
Po of CONNECTED TO STORMWATER
iO. DRAINAGE.
© . 7 +. . + NO
= | &
3 3.L11TM
‘NU N16-400 L12-300
“* I STARTERS L_ \16-400
399 | COG 300.
B

 

 

 

RETAINING WALL - RW1

1:20

 

IN ASSOCIATION WITH

 

 

 

 

 

 

 

11/16

SECTION ‘A’ AMENDED, RETAINING WALL DETAIL DELETED OP.G.

 

JAW.

 

 

 

09/16

ORIGINAL ISSUE DP.G.

J.A.W.

 

 

 

\ No.

DATE

 

 

 

ISSUE REVISED

 

CHECKED

 

0 1 2
ee
PRELIMINARY SALE A mT
NOT FOR CONSTRUCTION SCALE Bo aaa) 1: 20
DATUM 277? SCALES SHOWN ARE AT A1 SIZE

K

 

COZENSE
RCGANE

CONSULTING ENGINEERS ¢ CIVIL * STRUCTURAL

SUITE 7 ADVANCE BUSINESS CENTRE
39 LAWRENCE DRIVE NERANG

PO BOX 2711 NERANG QLD 4211

P: (07) 5578 4100

F: (07) 5578 4092

E: [email protected]
W: www.cozreg.com.au

PTY
LTD

CONSULT AUSTRALIA

Member Fitrn

DESIGNED JAW.

CLIENT

 

DRAWN DP.G.

D.S. & AS. DEVELOPMENTS PTY. LTD.

JOB NO.

 

 

CHECKED JAW.

PROJECT

 

APPROVED FOR AND ON BEHALF OF
COZENS REGAN GROUP PTY LTD
(RPECQ No 4)

(NPER No 540920)

({RPEQ No 4536)

 

 

PROPOSED FACTORY

AT LOT 12, 40 GATEWAY DRIVE, NOOSAVILLE
SECTION AND DETAILS

16441

 

 

= C05

ISSUE

 

 

 

 

 

 

 

 

 

 

 

Page 5

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016


[OCR of page images]
     
  
 
  

 

PROPOSED G6 FACTORY UNITS
LOT 12 GATEWAY DRIVE, NOOSAVILLE.

LANDSCAPE PLAN

N
GULLY PIT,

  
  

 

NOOSA COUNCIL
APPROVED PLAN
OPW16/0229 16 DEC 2016

STORMWATER PIT
INVERT 7.31

    
   
 
 

  

DISABLED
SET DOWN AREA

   

 

   

DRAINAGE = \ DISABLED.
CARPARK

  

 

 

   

      
 
  
 

  

DRAINAGE
D> GRATE

3.2m HIGH

ALL
MENT OPER)
°ATIOI
2008 0653 NAL

 

  

BLOCK ‘w,
VELOP)
WORKS No,

RETAINING
AS PER pe

   

DRAINAGE

   
 

SP. 170295

TILT SLAB WALL
7.0 m HIGH ON BOUNDARY

   
 
 
 

PROPOSED 8
FACYORY UNITS

 
     
   

DRAINAGE
DRAINAGE
©} GRATE

 
 

LOT 14
SP. 170295

     
  

ELeCTRICIT:
+ PILLAR

   
    
  
  

WALL 3,2,
2m HIG
MENT OPERA, TONAL

WORKS No. 2909 0658

IG BLOCK
DEVEL op;

RETAINING
AS PER

 
 
 
 

S.P. 170295
TILT SLAB WALL
7.0 m HIGH ON BOUNDARY

REVISED:- 17/11/16
SCALE
1:100@A1

  

 

DS & AS DEVELOPMENTS PTY. LTD.

   

 

 

 

 

 

 

NOTE:- ALL BULDING WORKS SHALL COMPLY WITH THE RELEVANT

NOTE:- ALL DIMENSIONS TC BE AUSTRALIAN STANDARDS AND THE REQUIREMENTS OF
VERIFIED BY BUILDER PRIOR TC THE BUILDING CODE OF AUSTRALIA.
COMMENCEMENT OF WORK. ALL LEVELS ARE IN METRES AND ARE BASED ON AUSTRALIAN PROPERTY DESCRPTION
HEIGHT DATUM. PROPOSED 6 FACTORY UNITS p=
ON LOT 12 S.P. 170295 29:9:16
GATEWAY DRIVE, —
NOOSAVILLE. sneet 1 oF 3

 

 

 

 

Page 6

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016


[OCR of page images]
 

 

 

LANDSCAPE PLANTING

 

SYMBOL BOTANICAL NAME COMMON NAME
TREES
\ ACMENA HEMILAMPRA BUSH SATINASH
BANKSIA. INTEGRIFOLIA COASTAL BANKSIA
GREVILLEA BAILEYANA WHITE OAK
SHRUBS BANKSIA SPINULOSA HAIRPIN BANKSIA
® FICUS ‘GREEN ISLAND’ GREEN ISLAND
2 SIZIGIUM RESILIENCE RESILIENCE
* CALLISTEMON “GREAT BALLS OF FIRE” CALLISTEMON
a SYZYGIUM AUSTRALE SCRUB CHERRY
O WESTRINGIA FRUTICOSA "SMOKEY" SMOKEY
a LOMANDA ‘CRACKER JACK’ CRACKER JACK
BIO-RETENTION BASIN
sé LOMANDRA HYSTRIX MATT RUSH
BIO-RETENTION BASIN
BUFFER
® ——s FICUS ‘GREEN ISLAND’ GREEN ISLAND
LOMANDA ‘CRACKER JACK’ CRACKER JACK

®

BIO-RETENTION PLANTING IN ACCORDANCE WSUD TECHNICAL GUIDELINES.
8 PLANTS PER SQUARE METRE AND MULCHED WITH SUGSR CANE MULCH.
MULCH TO BE SECURED WITH BIO DEGRADEABLE BIRD NETTING.

SCHEDULE

GROWTH HABIT

SMALL TREE
SMALL TREE
SMALL TREE
SMALL SHRUB
SMALL SHRUB
SMALL SHRUB
STRAPPY GROUND COVER
MEDIUM SHRUB
SMALL SHRUB

STRAPPY GRASS

MACROPHYTES SPECIES

SMALL SHRUB

STRAPPY GRASS

POT SIZE

25 |

140 mm

140 mm

140 mm

140 mm

200 mm

140 mm

140 mm

8 PLANTS / m?

140 mm

140 mm

 

NOOSA COUNCIL
APPROVED PLAN

OPW16/0229 16 DEC 2016

 

QUANTITY

1

4

"

5

248

11

"

REVISED:- 17/11/16

 

DS & AS DEVELOPMENTS PTY. LTD.

SCALE

 

PROPERTY DESCRPTION

GATEWAY DRIVE,
NOOSAVILLE.

 

N.T.S.
me
G2903
PROPOSED 6 FACTORY UNITS f=——
ON LOT 12 S.P. 170295 P59:9:16

 

veer Zor 3

 

 

 

 

Page 7

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0229 16 DEC 2016


[OCR of page images]
 

 

SCOPE.
GENERAL CONDITIONS

SITE PREP 7 EARTHWORKS

MATERIALS 7 SERVICES

HARDSCAPE

PLANT MANAGEMENT

SOFTSCAPE

TURF (green couch)

IRRIGATION (if required)

LANDSCAPE ESTABLISHMENT

PERIOD

SPECIFICATION FOR LANDSCAPE WORKS

PERFORMANCE.

ALL LANDSCAPE CONSTRUCTION WORK IS TO BE CARRIED OUT IN COMPLIANCE WITH RELEVANT COUNCIL APPROVALS AND TO INDUSTRY BEST
PRACTICE. ANY CHANGES FROM DESIGN DOCUMENTATION MUST BE APPROVED BY PROJECT LANSCAPE ARCHITECT PRIOR TO CONSTRUCTION ON SITE

 

DS & AS DEVELOPMENTS PTY. LTD.| W.T.s.

PROPERTY DESCRIPTION 52903
PROPOSED 6 FACTORY UNITS ==="
ON LOT 12 S.P. 170295 P*59.9:16
GATEWAY DRIVE, —
NOOSAVILLE. seer 3 oF 3

REVISED:- 17/11/16

 

 

 

 

 

 

 

EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE UNDERTAKEN WHERE NECESSARY TO ENSURE NO DETRIMENTAL EFFECT TO DOWNSTREAM
WATERWAYS OR NEIGHBOURING SITES.

PRIOR TO COMMENCEMENT OF WORKS, EXISTING SITE CONDITION ARE TO BE DOCUMENTED BY CONTRACTOR. ALL EXISTING AND PROPOSED SERVICES
ON SITE ARE TO BE LOCATED AND CLEARLY IDENTIFIED. ALL BUILDING RUBBISH AND DELETERIOUS MATERIALS ARE TO BE REMOVED FROM SITE TO
APPROVED WASTE LOCATION.

LANDSCAPE AREAS SHALL BE SCARIFIED TO A DEPTH OF 150mm TO PROMOTE GOOD GROWTH FOR TURF AND PLANTING

 

NOOSA COUNCIL
APPROVED PLAN
OPW16/0229 16 DEC 2016

 

ALL MATERIALS TO BE USED IN THE CONSTRUCTION OF THE DESIGNED LANDSCAPE ARE TO BE OF AN INDUSTRY STANDARD QUALITY AND FROM A
A SUSTAINABLE SOURCE WHERE POSSIBLE. NO MATERIALS USED ON SITE SHALL BE TOXIC TO HUMANS, ANIMALS OR PLANTS.

ALL SELECT ITEM MATERIALS ARE TO BE APPROVED BY THE CLIENT PRIOR TO CONSTRUCTION ON SITE.

PROVIDE SERVICE CONDUITS TO ALL GADEN BEDS FOR IRRIGATION AND DRAINAGE PURPOSE. PROVIDE CONDUITS FOR LIGHTING WHERE REQUIRED.
ENSURE ADEQUATE DRAINAGE TO PLANTING AREAS FOR SPECIFIC SITE SOIL CONDITIONS VIA THE USE OF SLOTTED AGRICULTURAL DRAIN.

(SELECT TYPE FOR APPLICATION). OVERLAND FLOW PATHS WITHIN GARDEN BEDS (SELECT) RIVER GRAVEL ON GEOFABRIC MATERIAL) AND SURFACE
STORMWATER PITS (LOCATED IN GENERALLY CONCEALED POSITIONS).

PROPOSED HARDSCAPE ITEMS ARE TO BE CONSTRUCTED TO AUSTRALIAN STANDARDS AND RELEVANT COUNCIL CODES.

NO MATERIALS USED ON SITE SHALL BE TOXIC TO HUMANS, ANIMALS OR PLANTS.

EXTRUDED CONCRETE EDGE: EDGING TO BE LAID BY SUITABLE CONTRACTOR ON A COMPACTED SUBGRADE. SELECT COLOUR AND PROFILE BY CLIENT.
DELINIATION OF EDGE AS PER LANDSCAPE WORKS.

TIMBER EDGING 200x 50 TREATED PINE FIXED AT 900mm CRS WITHY TREATED STAKES AND GALVANISED FIXINGS. SPADE CUT EDGE: SPADE CUT
EDGING IS CREATED USING A SHARP EDGE SPADE, TO CREATE A ‘V' SHAPED CHANNEL TO THE EDGE OF THE GARDEN BED.

ALL PLANT SPECIES ARE DETAILED WITHIN THE PLANT SCHEDULE. NO SUBSTITUTIONS ALLOWED WITHOUT PRIOR ACCEPTANCE BY COUNCIL AND

PROJECT LANDSCAPE ARCHITECT.

THE CONTRACTOR SHALL OBTAIN ALL PLANTS AS SPECIFIED FROM AN ACCREDITED NURSERY OR OTHER APPROVED SOURCE. PLANTS SHALL BE
PRE-WATERED PRIOR TO ARRIVING ON SITE.

PLANTS SHALL BE HEALTHY, HARDY AND OF GOOD FORM. THE ROOT SYSTEM OF EACH PLANT SHOULD NOT BE ROOTBOUND AND CONDUCIVE TO
SUCCESSFUL TRANSPLANTATION. ALL PLANTS TO BE PEST AND DISEASE FREE WITH CONTAINERS FREE FROM WEEDS.

STREET TREE SPECIES ARE TO COMPLY WITH NATSPEC AND RELEVANT COUNCIL CONDITIONS.

STAKE TREES WITH A MIN. OF TWO 50x50 HWD STAKES AND HESSION STRAP OR SIMILAR AS NOT TO DAMAGE TREE.

NO TYPE OF STAKE TO PLACED THROUGH ROOTBALL OF PLANT AT ANY TIME.

EACH PLANT TO HAVE ADDED WATER CRYSTALS TO PLANTING HOLE AND WATERED IN AFTER PLANTING AS REQUIRED. PLANT STOCK MAY BE

REJECTED IF NOT CONFORMING WITH ABOVE SPECIFICATIONS.

SETOUT OF ALL SOFTSCAPE AREAS TO BE IN ACCORDANCE WITH APPROVED PLANS. PLANTING ARES TO BE MOUNDED TO ACHIEVE ADEQUATE
DRAINAGE AND AESTHETIC PRESENTATION.

SOIL: A GOOD QUALITY FRIABLE, MODERATELY DRAINING, ORGANIC ENRICHED LANDSCAPING SOIL MIX SHALL BE IMPORTED FROM AN APPROVED
SOURCE. THE SOIL SHOULD NOT CONTAIN ANY CLAYAND BE FREE FROM CONTAMINENTS SUCH AS WEEDS, STICKS AND ROCKS. IMPLEMENTATION WITHIN
GARDEN AREAS TO A MIN OF 300mm DEPTH.

ORGANIC MULCH: FOREST MULCH IN ITS VARIETY OF FORMS IS TO BE SUPPLIED AND INSTALLED TO A MIN. DEPTH OF 100mm. MULCH IS TO BE FREE OF
FOREIGN MATTER INCLUDING WEEDS, SOIL, STICKS AND ROCKS. AVOID PLACEMENT OF MULCH AGAINST STEM OR TRUNK OF PLANTS. GRADE MULCH

TO BE SELF RETAINED WITHIN GARDEN EDGING.

GRAVEL MULCH: SELECTED WASHED RIVER MULCH GRADED IN SIZE AND COLOUR. USE IN AREAS AS SPECIFIED OINPLANS. TO BE USED TO SEPARATE
ORGANIC MULCH FROM WALLS OF BUILDINGS, ADJACENT PATHS AND TOO FACILITATE DRAINAGE WITHIN GARDEN BEDS. MIN. DEPTH TO BE TWICE THE
DIAMETER OF THE LARGEST PEBBLE.

TURF SHALL CONSIST OF A DENSE, WELL ROOTED, VIGOROUS GRASS GROWTH WITH MIN. 25mm OF TOPSOIL. TURF IS TO BE DELIVERED TO THE SITE
WITHIN 24 HOURS OF BEING CUT. TURF SHOULD BE FREE FROM DELETERIOUS MATERIAL.

INCLUDING WEEDS, SEEDS OR ROOTS INCLUDING NUT GRASS AND OXALIS. TURF SHALL BE SUPPLIED IN UNIFORM SIZE IN UNBROKEN CONDITION. MOISTURE
LEVEL TO REMAIN CONSISTENT DURING LAYING. TURF TO BE LAID ALONG CONTOUR AND PINNED IF GRATER THAN 1:4 SLOPE.

PREPARE SUBGRADE TO A LEVEL BASE WITH AN APPROVED TOPSOIL AND SPREAD UNDER TURF FERTILIZER AT RECOMMENDED RATE. TURF TO FINISH
LEVEL WITH PATHS, EDGES AND KERBS AFTER ROLLING AND SETTLEMENT.

IRRIGATION TO BE INSTALLED BY A SUITABLY QUALIFIED CONTRACTOR AND BE INSTALLED IN ACCORDANCE WITH ALL COUNCIL WATER REGULATIONS
THE MOST WATER EFFICIENT METHOD OF IRRIGATION IS TO BE USED, CONNECTED TO A TANK SUPPLY WHERE POSSIBLE. CONDUITS TO BE LAID TO ALL
GARDEN ARES TO PROVIDE A REGULATED COVERAGE. FLUSH AND PRESSURE TEST PRIOR TO COMMISSIONING.

PROVIDE AS CONSTRUCTED DRAWINGS CLEARLY SHOWING LOCATION OF ALL IRRIGATION COMPONENTRY.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CARE AND MAINTENANCE OF ALL LANDSCAPE WORKS FOR A PERIOD OF 13 WEEKS AFTER COMPLETION.

MAINTENANCE IS TO INCLUDE MOWING OF TURF, REMOVAL AND SPRAYING OF WEEDS, PRUNING AND TRIMMING OF SHRUBS WHERE REQUIRED, REPLACEMENT
OF DEAD OR DISEASED PLANT STOCK AND CORRECT WORKING OF IRRIGATION SYSTEM.
WATER IS TO BE PROVIDED TO ALL SOFT LANDSCAPING AT A REQUIRED RATE DURING THE ESTABLISHMENT PERIOD TO ENSURE HEALTHY AND VIGOROUS

GROWTH.

 

 

 

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plan OPW16-0229.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.