Town Planning Report · MCU18/0015
Town Planning Report January 2018
(b) The design of the proposed development is a substantial improvement from the previous
development in terms of construction methodology and excavation works. Whilst the previous
proposal required deep excavation to accommodate the unit building, the current proposal plans
show that the proposed units are proposed to be accommodated partially on poles to work with the
topography and minimise the need for deep excavation.
(c) The lightweight construction methodology results in an improved visual appearance with the
buildings sitting lightly on the hill rather than appearing as one large bulky structure. The visual
montages PL.12 to PL 15 included with the Proposal Plans at Attachment 3 are indicative 3D renders
of the proposed development from various viewpoints to demonstrate that the units will blend with
the landscape. Muted colours and materials are proposed to ensure the built form presentation of
the units and detached houses blend with the surrounding environment.
(d) In preparing the proposed development design, the applicant commissioned a full suite of technical
assessments including geotechnical, engineering and environmental to site specifically ground truth
the site’s constraints. These reports are included at Attachments 4, 5 and 6 conclude that the
proposed development has been aligned to the least constrained parts of the land and the site can
be safely and responsibly developed.
For the above reasons it is considered that the proposed development is a suitable design response to
the site’s topography and environmental conditions and the population density of the proposed
development is appropriate and suitable.
25. Earthworks – Proposed earthworks are generally limited to that required for the construction of the
proposed access driveway (and associated drainage) and proposed construction of essential
infrastructure (sewer, water, electrical and telecommunications). This is a significant improvement
when compared to the earthworks and excavation that was proposed to accommodate the previous
unit development on the subject site. The Engineering Report included at Attachment 4 provides further
details regarding the proposed infrastructure site works.
26. Infrastructure provision – Infrastructure services are able to be connected to each proposed allotment
and component of the proposed development, include water, sewer, electricity and
telecommunications. There is no stormwater infrastructure available within the site to allow direct
connection to a Council piped network, however, the existing natural drainage gully through the site has
been considered to represent the legal point of discharge for the proposed development and
stormwater has been designed to achieve non-worsening at this location. The Engineering Report
included at Attachment 4 provides further details regarding the preliminary servicing arrangements.
Combined MCU and ROL proposal Page 14 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 411 KB (small file)
- File type
No other editions are linked here.