Council archive · source document
Town Planning Report · MCU18/0015
Town Planning Report January 2018
for the intended development. Proposed lots 2, 3 and 4, will each be able to accommodate a
minimum of 2 car spaces, whilst the proposed multiple housing on proposed Lot 1 is intended
to accommodate 12 x double garages (i.e. total of 24 car spaces) for residents and 8 visitor car
parks. This is in excess of the car parking requirements pursuant to the Noosa Planning Scheme
which require 2 spaces per 3 bedroom unit plus 1 visitor space per 4 units.
(f) Earthworks Code – The limited amount of earthworks that will be required to facilitate the
proposed development will be undertaken in accordance with the recommendations of the
Geotechnical Report provided at Attachment 5.
(g) Erosion and Sediment Control Code – Proposed earthworks will be generally limited to that
required for the construction of the proposed access driveway and for various infrastructure.
Appropriate erosion and sediment controls will be implemented, with the detailed design
demonstrated through a subsequent application for Operational Works.
(h) Existing Services Code – The subject site has access to, and proposed lots are capable of being
connected to (without adversely affecting the function of) existing urban infrastructure
including water, sewer, electricity and telecommunications. The detailed design of connection
to these services will be demonstrated as part of a subsequent Operational Works application.
(i) Landscape Code – Landscaping will be consistent with the existing residential character of the
area in accordance with Council standards outlined in the Landscaping Code.
(j) Transport, Roads and Drainage Code – High traffic generating uses are not anticipated by the
proposed development, which will successfully integrate with the existing road network.
(k) Water Sensitive Design Code – There is no stormwater infrastructure available within the site
to allow direct connection to Council piped network, however, the existing natural drainage
gully through the site has been considered to represent the legal point of discharge for the
proposed development and stormwater has been designed to achieve non-worsening at this
location. Detailed design of stormwater solutions will be demonstrated as part of a subsequent
Operational Works application.
(l) Waste Management Code – The proposed development layout has been designed such that it
is capable of accommodating the collection of waste in accordance with Council’s standards.
(m) Water Supply and Sewerage Reticulation Code – The Engineering Report included at
Attachment 4 conceptually provides water supply and sewer reticulation services. The detailed
design of this infrastructure will be demonstrated as part of a subsequent application for
Operational Works.
Combined MCU and ROL proposal Page 26 of 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 411 KB (small file)
- File type
No other editions are linked here.