Council archive · source document
08/0746 - Op Works - Stormwater [As Published] · 142008.746
Ann Moore To: [email protected] Subject: Assessment Fees for 14 Park Rd, Noosa Heads Atten Gary Batchelor As requested the following are the fees required for the operation works application for the above property:- Plan Examination fees $800 Inspection fees $470 Regards Ann Ann Moore Administration Officer Land Development Sunshine Coast Regional Council (Tewantin Office) Box 141 WANTIN QLD 4565 PH: 07 5449 5261 email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 64 pages
Page 2
13218 DA pr LD
ZZ S C A NM N F D . Alliance Peres Grou
(4 Life ABN. 17.099 113 078
REC HS SET)
Al | ia nce : a ACN. 009 113 078
A OCIVED
18 APR 2008
PO Box 208 Southport BC
3/22 Marine Parade
Southport Qld 4215
Consulting Eng.neers
Tel: 61-7-55 281855
Fax: 61-7-55 284723
Ref: 07559 / L004
GB:sm PLACED ON FILE
GC Office
id
Tewantin
16” April 2008
Sunshine Coast Regional Council
Tewantin Office
9 Pelican Street
Tewantin QLD 4565
Dear Sir,
RE:
OPERATIONAL WORKS DEVELOPMENT PERMIT APPLICATION
14 PARK RD, NOOSA HEADS
LOT 3 ON RP122368
FILE NUMBER 23218DA
On behalf of Mr. Stephen Timothy Biggs we request operational works approval for stormwater and erosion
and sediment control pursuant to the development application decision notice dated 13 December 2007.
Please find enclosed the following documentation in accordance with the former Noosa Shire Council’s
Planning Scheme Policy 5:
a) 4 x A3 and ! x Al copy of Alliance Design Group’s drawings 07559-C00-C, C01-C, C02-C and
C03-C;
b) IDAS assessment checklist;
c) IDAS Form A;
d) IDAS Form E;
e) Development Programme;
f) Geotechnical investigation reports by Morrison Geotechnic dated 23 November 2006 and Golder
Associates dated July 2003; and
g) Confirmation that easements have been registered.
Further to our telephone conversation with Ms Anne Moore on 27 March 2007, we understand that you will
advise us of the appropriate assessment fee once you have reviewed the above documentation.
Should you require any further information please contact Mr Gary Batchelor on 07 5528 1855.
Yours faithfully
ALLIANCE DESIGN GROUP
CO Bade
GARY BATCHELOR
Senior Civil Engineer 180408_kodakscanner 094106 09
= ._001 tif
Enc.
AODL
Page 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
AS Form 1 Development Application
Part A
Common deiails
INOTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.
Information provided on the IDAS AppBication Form is correct. This information is refled upon by the Assessment Manager and any referral agencies when assessing and
deciding this application. By lodging ihis appication. the Appkcent incurs the obigations end responsibifies prescribed by the IPA. Any development permit or preiininary
uence of this ication will be issued fo ihe Appicant)
Individual applicant/Contact person (If there is more than one applicant, provide additional applicant details on an attachment to this form)
Title [hr Last name [Batchelor
|
Postal address [pot Box 208, Southport BC, 4215 |
Contact telephone number [or 5528 1855 { Mobile phone number
Facsimile number 07 5528 4723 | e-mail address [email protected]
‘Details of the premises (1.2. the Jand on which the development is proposed - refer to the advice at the end of the form) |
1. Identify the premises by completing Table A, or Table 8 and/or Table C (ensure adequate information is given to identify the premises)
Table A Ifthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
| Name of each local government area in which the mobile and temporary ERA is proposed to operate
[1
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)
{i) Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF
(i) (C) Street address /lot on plan for the tand adjoining or adjacent to the premises (Appropriate for development in water 6.9. jetty,
pontoon etc) (Nate: Loton plan details may be obtained from fitle documents, a ‘Rate’ notice, or from the local government.)
at Teal Street Address. Lot on TE Local government area (e.g. Logan,
No. | No. | Street Name and official suburb/locafty name | Post Code} Lot No. Plan Ni . Cairns)
4 14 Park Road, Noosa Heads 4567 3 RP122368 Sunshine Coast Regional Councit (Noosa Shire)
2 WW Allambi Rise, Noosa Heads 4567 65 RP52918 Sunshine Coast Regional Councit (Noosa Shire)
AND/OR
Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
Tonia ne ep
(Note: place each set of coordinates ina separate om) Zone Daturn Local government area
Easting Northing Latitude. Longitude Reference (if applicable)
1 [~ pepaga
J” wossa
[~ Other-
2. — Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)
Page 4
INTEGRATED PLANNING ACT 1997
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
~~ Name of water body, watercourse or aquifer (if known)
Part A, Version 3.1, 3 March 2008
[1
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994
Lot on plan description for strategic port land Port Authority the lot
[1
Table F Complete if the premises are in tidal water
Name of focal government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable) —
{1
3. Indicate the total area of the premises on which the development is proposed: (Note: The fofal area may include land both above and below water)
. Total area of premises |
0.11 Cm [xj hectares (Tick applicable unit)
{Existing use of the premises |
4. Current use/s of the premises: (o.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
[1 | Vacant land |
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.)?
(1 No
‘Proposal details . . . |
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquaculture)
Yes - Ensure the type, tocation and dimensions of each easement are included in plans, submitted with the application
Single dwelling
7. Does the poposal include new buildings or operational work (including any services) on the premises?
[J No
‘Resource entitlement (if eppfcabie) _- further information is provided jn the aavice section at the end of the form a |
Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto Q9 O Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
[Owner's consent (if enpicable} _- further information is provided in the advice section at the end of the form . 2 - 4
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
| Date consent
was obtained «|
Details of the premises owned
(street address or Jot on plan description)
“ Premises Owner's namels
Table H and postal address
Owner's signature”
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, s127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the [PA website .
Attachments and supporting Information (Complete Table | - Use a separate row for each type of attachment or information, including Information required
under this Part) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, elc, are securely attached to this Part of the Form.
Description of attachment or information | tite qrapptoabey Method of delivery to
i pplicable) lethod of delivery to
Table | fea. ”‘icalaveilonar pr owigs pats) (e.g, General Aubhorily. James StreetTreffic Report) oe assessment manager
1 IDAS Checklist April 2008 mail
2 IDAS Form 1 Part E April 2008 mail
Page 5
INTEGRATED PLANNING ACT 1997
Part A, Version 3.1, 3 March 2008
3 Drawing 07559-C00 Revision C Drawing register and locality plan | April 2008 mail
4 Drawing 07559-C01 Revision C Stormwater management plan April 2008 mail
5 Drawing 07559-C02 Revision C Stormwater longitudinal section April 2008 mail
6 Drawing 07559-C03 Revision C Sediment and erosion plan April 2008 mail
7 Geotechnical Report Morrison Geotechnic, 7 pages 23 Nov 2006 | mail
8 Geotechnical Report Golder Associates, 31 pages July 2003 mail
9 Easement registration confirmation Letter ex Alan Becconsall, 5 pages | 1 April 2008 | mail
10 | Development Programme Revision B, 1 page 2 Dec 2007 | mail
(Portable Long Service Leave (PLSL) levy (AppScabés for cartain building and construction work vaiued over $80.000 only
10. The Portable Long Service Leave Levy (PLSL} is not applicable to this application if any of the following apply: ( Tick box if applicable)
{CJ the application seeks a preliminary approval only;
(1) the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
8 ail costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(2) the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. 1s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
No - End of Part A
OO Yes -
Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
Fee ($)
Date received
Receiving officer's
name
Reference
numbers
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
Council. | have been engaged as the private certifier for the building work referred to in this application.
BSA Certification number.
Building classification’s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or
private certifier if applicable)
Date receipted :
* Deseription of the work Leave Project Number {Amount paid ($}| Date paid eeamert Names om “oie
_ y : PE _ manager sneer
jm
Privacy Statement
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for 2 purpose outside of the IDAS process, except where required by jegistation (including the Freedom of Information Act 1992) or as
yequired by Pariament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 General advice . Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger may refuse to receive an application that is not properly made. The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only. Applicant details If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA. Details of the premises The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land. Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A. The premises may be identified in a number of ways ~ ¢ Street address and lot on plan are most common and will apply to most applications. + Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as Zone Reference or GS84 may be provided. The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act. StrategicPortLandis within a locat government area but a local govermment's planning scheme does not apply onStrategicPortLand. StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the Queensland Transport (Ports) website. ‘Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a focal government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work). Resource entitlement Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State- owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence. For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made. For State-controfled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads. Evidence may be required from more than one Department responsible for a State-owned resource, €.g. from the Environmental Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark. Owner's consent Section 3,2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coasta/ Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the processes of the application or in the event of an appeal about the outcome of the application. “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were !et to a tenant at a rent). Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used for providing owner's consent provided it is clear the decumentation relates to the development application for the premises. Owner's consent, if required, must be provided even if the applicant is the owner, Owner's consent is not required for a mobile and temporary ERA.
Page 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entittements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy} is collected on certain building and construction work carried out inQueenstand.
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave} Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction industry (Portable Long Service Leave) Act 1991 {PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Buitding and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.qleave.qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:
www, gleave.qid.gov.au )
Page 8
INTEGRATED PLANNING ACT 1897 Part E, Version 3.1, 3 March 2008
WW Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme
Nature of the works |
1. Nature of work that requires assessment against a planning scheme:
(] Building work - Complete Table A Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
([] Roadworks Stormwater (C] Water infrastructure [[] Sewerage infrastructure
[[] Landscaping CO Earthworks () Drainage Works CL Signage
([] Clearing vegetation under the planning scheme ([] Other - Specify betow
(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, il may be more appropriate to provide these details in an attachment to this form)
Development Permit [J] Preliminary approval (] Both (Specify betow)
(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No {[] Yes - Specily the number of lots being created
(iv) Are there any current approvals associated with this application? (.9. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
LI No Yes - Complete Table B(a)
Table B(a) List of approval references ; Date approved Date approval lapses (itknown) /
1 23218DA 13-Dec-2007 13-Dec-2012
Table B
(i) What is the nature of the operational work?
(J Roadworks (1) Stormwater () Water infrastructure (] Sewerage infrastructure
([] Landscaping ( Earthworks () Drainage Works CL Signage
(] Clearing vegetation under the planning scheme Other - Specify below
Sediment and erosion contro!
(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
Development Permit [] Preliminary approval LJ Both (Specify below)
{iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
No [_] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
(J No Yes - Complete Table (a)
Table B(a) | ~~" st of approval references " Date approved Date approval lapses (if known} |
1 23218DA 13-Dec-2007 13/12/2012
Page 9
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
2. What is the dollar value of this operational work? (2. the otal value including GST, materials and labour) |$ —B-B8-—- {() {000.006
(Mandatory information
3. Confirm that the following mandatory information accompanies this application
| Confirmation of
lodgement Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works finctuding the
lextent of any cut and fil) Confirmed
OFFICE USE ONLY
Date Received Reference Numbers
Advice for completing Part E
General advice
«Part A must also be completed for all IDAS development applications.
|e — The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur
Page 10
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 21.1, 3 March 2008
WW
nak een ranean
IDAS
Assessment Checklist
IDAS Development Application Form 1 |s the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for all applications, The relevance of other Parts of Form 1 depends on
the nature of the application. .
Form 4 also includes the IDAS Assessment Checklist, which ts used to assist in determining State-assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, referto www.uida.qid.gov,au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to materially change use of the premises?
Ifyes - complete Section 2 of this checklist L1Yes |B} No
Does the application seek approval to reconfigure a lot? Ces |paNo
if yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out operational work?
if yes - complete Section 4 of this checklist [Yes | No
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Yes | [No
if yes - complete Section 5 of this checklist
Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?
ityes - complete Section 6 of this checklist. (Yes |[KJNo
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? 0 Yes |[x]No
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go fo Appendix 1 of this checklist for advice on building referrals, Complete Part B of IDAS Application Form 1, OYes |[X]No
Assessment is by a building certifier
ISECTION 4 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist
HERITAGE ]
1 Is any part of the proposal intended to be carried out on a registered place under the Queensland Heritage Act 1992?
No-Gotoa1.2 (_] Yes
IPA, schedule 8. part 1. table 4. item 2: iP Regulation, schedule 2. table 2, item 18; IPA, section 1.3.5 (Definitions for terms used in development)
(REMOVING QUARRY MATERIAL; WILD RIVERAREA” =" . “ * ~ ]
4.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoa13 [_] Yes
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
JPA, schedule 8, part 1. table §, item 1, 1P Reguiation, schedule 2. iable 2, item 11; iP Regulation, schedule 1, table 5, fem 2 (wsild river area}; Water Act 2000,
section 966C; Wild Rivers Act 2005. section 434
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA {
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoai4 [(} Yes
IPA, schedule § part 1. table 2. dein 1 IPA schedule @, pari 1 table 5 tems 2 and 4, iP Reguialion scledule 2. tabie 2. dems 7 and 23. Envircnmentat Prolection Act 1994 section
TQAA (wild river area) Wid Rivers Act 2005. section 424; relevant wid aver deciarabor Wid Rivers Code.
(WITHIN THE LIMITS OF & PORT |
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Go fo 01.5
LJ Yes
IP Reguiation, schedule 2, table 2. tems 15 and 16
(DECLARED FISH HABITAT AREA |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Go to. 01.6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation, schedule 2. tabie 2. item 26
ICOMMUNITY INFRASTRUCTURE oe Se . " “8 ® " il
1.6 ts any part of the premises designated for community infrastructure?
No - Goto Q1.7
LI Yes
IP Regulation, schedule 2, table 3, lem 7
WASTE WATER MANAGEMENT —— |
V7 Does the proposal involve the establishment or expansion of a waste water disposal system?
No -Endof Section? [_] Yes
iP Regulation. schedtle 2. table 3, item 5
SECTION 4. Section 4 must be completed when the application seeks approval to carry out operational work,
[PLANNING SCHEME . _ . a . 4
41 Is any of the proposed operational work assessable under a planning scheme?
(J No - Go fo. 04.2 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
ISTATE-CONTROLLED ROAD i |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No
(1 Yes
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
No - Goto 04.1.2
Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedute 2. table 3. item 3: 1P Regulation. schedule 2. table 3. item 1{b}
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
(ACID SULFATE SOILS |
4.1.2 Is any of the operational work proposed in a local government area listed*" in State Planning Policy 2/02; Planning and Managing
Development Involving Acid Sulfate Soils
No - Go to. 04.1.3 CL] Yes
44 purakun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirtum Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
IP Regulation, schedule 2, table 3, lem 4; Slate Planning Policy 2/02; Planning and Managing Development involving Acid Sulfate Soils, section 3.8
‘EASEMENTS AND SUBSTATIONS ]
4.1.3 Is any of the proposed operational work for filling or excavation?
No - Go to 04.1.4
CI Yes
JP Regulation, schedule 2, table 3 item 10(a); IP Regulation, schedule 2, table 3, item 10(b)
414 — |s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoa415 (_] Yes
JP Regulation, schedule 2, lable 3, item 17
PUBLIC PASSENGER TRANSPORT . . |
4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No-GotoQ41.6 [_] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14
[RAILWAY SAFETY AND EFFICIENCY “
4.1.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No-Gofoa41.7 — [_] Yes - This application must be referred to QueensiandTransport (QT) as Concurrence Agency.
iP Regulation, schedule 2, table 3, item 15
IKOALA CONSERVATION ~ ° . * _ , 1
AAT ls any part of the premises in a koala conservation area or koala sustainability area?
No -Gotoa42 (_] Yes
JP Regulation, schedule 2, table 3, tem 19
= - Ts -
J
ILD RIVER AREA - Although legislation provides for assessment of operational works for residential’ commercial and industrial®
development for the purposes of the Wild Rivers Act 2008, currently no declarations for any of the wild fiver areas apply the Wild Rivers
cade to that type of development. a ;
SSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INI
REA a 5
4.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No -Gooa43 {_] Yes
IPA, scheduls 8, part 1, table 4, item 2: IP Regulation, schedule 1, part 2, table 5, item 1{c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban
area}
DUSTRIAL DEVELOPMENT IN A WILD RIVER
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
\VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
43 ts any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotoa44 [_] Yes
IPA, schedute 8, part 1, table 4, ilams 14-16, IP Regulation. schedule 2, lable 2, ilem 5 (vegetation clearing}; IP Regulation, schedule 2, table 2, item 24 (koala
conservation): IP Regulation, schedule 1. part 3. table 4. ifem {vegetation clearing/wild river area}; Vegetation Management Act 1999, section 224 (vegetation
clearingWvald river area); Wild Rivers Act 2005. sections 31F and 43A
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA |
44 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Goto@45 [_] Yes - Answer (a) and {b) below
IPA, scheduis 8, pari 1, table 4. tems 3a); IP Regulation. schedule 2, table 2, item 8: iF Regulation. schedvic 1, zart 3. table 4. items 3 end 3A; Water Act 2000, section 966A {wild river
area}; Wild Rivers Act 2005, section 434; refavant wild sver declaration; Wid Rivers Code
45
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto 04.6 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1. table 4, item 3{b}: IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule 1. part 3. lable 4, item 3
Wild Rivers code (Note: the code does nol currently contain applicable provisions for taking or interfering with artesian water}
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No -Gotoa47 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 7, tabie 4, dem Hc}{i), P Regulation, schedule 2, fabie 2, item 8. IP Reguiaticn. schedule J, part 3. table 4. item 3, Water Aci 2006, section 9664 jwild nver area):
Witd Fivers Act 2005, section 43A; refevant wild river declaration; Wild Rivers Code
47 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No -Gotoa4e [_] Yes
IPA, schedule 8, part 1, table 4, item 3{c}{ii): IP Regulation, schedule 2. table 2. item & IP Regulation, schedule 1. part 3. fable 4, item 3
Water Act 2000. section 966A (wild river area){Noze: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: ihe code does not currently contain applicable provisions for sub artesian water}
48
Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[] No - Goto a49 Yes - Answer both (a) and {b) below
(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared
under the Wild Rivers Act 2005?
L] Yes
No
If no, are the operations mentioned as assessable development in the following?
@) A water resource plan under the Water Act 2000 £_] No [] Yes
(ii) A regulation under the IPA or the Water Act 2000 [] No LI Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part K,q) This application requires assessment by the Department
of Natural Resources and Water (NRW). if NRW is not the Assessment Manager for
the application, the agency has jurisdiction as Concurrence Agency. Go to (b)
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a
drainage and embankment area (other than a wild river floodplain management area) and declared to be
assessable under that Act?
No O Yes - (Complete Form 1, Part Ki) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
IPA schedtie 2. pad 1. fable 4. dems Sécits) and 3d) IP Regulation, schedule 2, table 2, dem &: iP Regulation, schedule {. part 3. tabie 4, fom JA: Water Act 2006, section 9668 (wit
Aver area}, relevant wid river dectaration; Wid Rivers Code.
Page 14
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
49 Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 [k) No QD Yes
(ii) To increase the storage capacity of a referable dam by more than 10% —) No OJ Yes
{f yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRWis nol the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 4; IP Requlation. schedule 2, teble 2, item 10
{TIDAL WORK; WILD RIVER AREA |
4.10 Is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
No -Gotoa411 (_] Yes - Answer (a) and (b} below
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and §
Coastal Protection and Management Act 1995, section 104A (wild river area)
ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |
4.11 Is any of the operational work proposed to be carried out within a coastal management district?
No -Gotoo4.12 (_] Yes
IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12 and 14: IP Regulation, schedule 1, part 3, table 4, items 4A and §
Coastat Protection and Management Act 1995 Act 1995, section 104A (wild river area): Wild Rivers Act 2005, section 43A
IWATERWAY BARRIER WORKS; WILD RIVER AREA |
4.12 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No -Gotoo4.13 (_] Yes
JPA, schedule § part 1. table 4. ten 6: IPA, schedule 8. part 2, iad! 4, 2em 2: Fisheries Regulation 1995 $1134 {self-assessable codes); IP Reguiation, schedule 2, iable 2, iteny 28; IP
Regulation, schedule 1, part 3, table 4. dem 6; Fishenes Act 1994, section 76D (wild river area}; Wild Rivers Act 2005. secton 434
IDECLARED FISH HABITAT AREA; WILD RIVER AREA ae / |
4.13 1s any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 1994?
No - Goto 4.14
0 Yes
IPA, schedule 8, part 1, table 4, dem 7:1PA schedule 8. gart 2, table 4, item 3; Fisnaries Regulation 1995 $1134 isell-assessable codes}; IP Regulation. schedule 2, labia 2, item 25: IP
Regulation, schedule 1, part 3, table 4, dem 7: Wiid Rivers Act 2005, sections 4A; Fishenes Act, section 76D (wild river area).
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA ]
4.14 ls any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No -Gotoa4.15 [_] Yes
IPA, schedule 8, part 1. tabfe 4. xem 8: IPA, schedule 8. pari 2. table 4. dem 4; Fishenes Regulation 1995 113A (self-assessabia codes), [P Regulation, schedule 2, iable 2, tam 29; iP.
Regulation, schedule 1, part 3 fable 4, item 8. Fisheries Act 1994, seciion 7608 (wild river area}, Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code,
(WILD RIVER AREA |
4.15 |s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gotoa4.16 (_] Yes
IPA, schedule 8. part 1. table 4, item 10; 1P Regulation, schedule 2, table 2, item 37: Wild Rivers Act 2005, sections 42, 43A
SE
ISTATE-CONTROLLED ROAD -
4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No -Endofsection4 [_] Yes
IP Regulation, schedule 2, table 2, item 3
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008 Disclaimer: While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances. To the full extent permitted by jaw DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your teliance on this process and the information contained on this form.
Page 16
® BRISBANE m GOLD COAST jw CABOOLTURE Uni 1/235 Monies Reed Unit $436 Lawrence Drive Unit 3/42 Ansocrome Roed Darra Old 4078 Nerang Old 423+ Cabooturs Gis 4510 PO Bex 063 PO Bex 2011 Dara QLD 4078 Narang Old 4211 PHONE: 07 3279 9900 PHONE: 07 $96 1599 PHONE: 07 6400 0755 FAX: 07 3279.0955 PAX: = 07 8827 2027 FAX; 07 $428 2698 MORRISON EMAIL: —arfsbunelgo(@merriscngea.comau EMAIL: golgconsttahOmonsp1uz0.com.oy EMAIL: gebooliviela>@menisengee.com. ay WEBSITE: wewemostizonage com ou * GEOTECHNIC Caboolture Office Ref No, 00697 Job No. CE06/023 Author. N Morrison Mobile: 0411 604 780 Email: [email protected] 23rd November 2006 Mr S Biggs 29 Kitchener Road ASCOT Qld 4007 Dear Sir Fax: (07) 3268 2134 RE: PROPOSED RESIDENCE ON LOT 3 ON RP122368 14 PARK ROAD, NOOSA HEADS (ADDENDUM REPORT) 1.0 INTRODUCTION The proposal to construct a residential dwelling on this site is feasible, but as documents provided to me describe, care must be taken to ensure that the construction remains safe and does not affect the overall slope stability in any way. Lot 3 covers a steep west facing sand dune slope with a substantial cover of trees, mainly eucalypt Sp, but includes pines and occasional palms in the central and eastern part. This report provides geotechnical advice on design and construction issues following an inspection of the site on 3" April 2006. 2.0 INFORMATION The information documents provided are as follows: July 2003 GOLDER ASSOCIATES REPORT ON GEOTECHNICAL INVESTIGATION This report includes documentation of site testing in 1985 and 1990 as well as that carried out as part of the 2003 study. October 2002 MAX WATTERSON PTY LIMITED CONTOUR SURVEY PLAN This plan was used in the Golder report to describe the site conditions and has been used as a site plan by the architects GREG GIBBS ARCHITECTS to overlay the proposed residential constructions. December 2002 GREG GIBBS ARCHITECTS ARCHITECTURAL PLANS Site Plan Floor Plan Elevations Sections YvvY MORRISON GEOTECHNIC PTY LIMITED AGN 51 G09 878 899 RPEUO 2247
Page 17
Job No. C06/023 January 2003 CONSTRUCTION HYDAULIC BUILDING SERVICES ENGINEERS HYDRAULIC SERVICE CONNECTIONS March 2003 LAND GRAPHICS VEGETATION RETENTION PLAN Statements Architect Hydraulic Engineer Landscape Architect Various discussions and site inspections have followed to Overcome constraint issues relating to development on the slope, the use of retaining walls, tree preservation and the impact of the upslope boundary. This report confirms the feasibility of the project and provides design and construction advice. 3.0 GEOTECHNICAL CONSIDERATIONS : 3.4 Stability of the Natural Slope This is considered in the Golder report (July 2003) and shows the natural slopes on the site exceed that of exposed (loose) sand. In other words, the natural slopes on Lot 3 have been enhanced by the existing vegetation. The average slope in the southern fifty percent of the site is 32 degrees steeping to the north to 36.5 degrees. Golder makes reference to a central erosion or Slip feature (Page 3, Paragraph 1). This has been marked on the site plan included as Figure 1. It has a back scarp angle greater than 40 degrees, and side slopes steeper than the average site slope to Park Road, Correcting the contours gives a probable slip or erosion depth of 1.5 metres. 3.2 Dune Support System : There is common agreement that removal of vegetation would initiate a landslip in sand which could effectively remove some of the top 3 metres of very loose sand. Nevertheless, the long term site stability can be assured if any residential construction includes a dune support system as part of the structure. & On this site the dune support system has to: a) Improve the general stope stability from contour 31m to 37m. b} Remove the stability risk from the central erosion/slip feature. 3.3. Assumptions 3.3.1 From the Golder report, the average depth of very loose to loose and potentially unstable sand is 2.8 to 3.0 metres. 3.3.2 The density of the sand is assumed to be as follows: Very loose sand - 17kN/m?* Loose sand - 17.5kNim? 3.3.3 The effective marginally safe slope on this site is equivalent to the natural vegetated slope of 32 degrees. The effective friction angle of the very loose to loose sand with the existing vegetation cover and root system is assumed to be the same at 32 degrees, slighily greater than the angle of repose of loose dune sand of 30 degrees. 00697 S Biggs MORRISON GEOTECHNIC
Page 18
Job No. C06/023 3.3.4 Installation of piled foundations on this site would be the same as that on any other sand site, consequently the same design parameters apply. e.g. Ultimate Base Resistance = 120N" kPa = 120 DCP kpa--------- (1) 1.3 () Where "N" is the value obtained from the Standard Penetration Test. 2) OCP is the number of Dynamic Cone blows/300mm. The reduction factor of 1.3 was found in test correlation for dune sand with Standard Penetration tests and Dynamic Cone Penetrometer tests taken side by side at equivalent depths up to 10 metres. Using the data from the Golder report, the ultimate bearing capacity at a depth of 8 metres is 2.4 MPa. 3.4 House Foundations Vertical loads may be taken on steel screw piles dimensioned for the design load (estimated to be in the range 10-15 tonnes) and the base resistance as given in equation 1. Pile resistance can be gauged by the installation torque. Single helix screw piles are seen as a practical solution, at a depth in the range 8 to 12 metres, the lesser depth representing the lower end of the load range. A minimum helix diameter of 300mm is anticipated, but should be confirmed by the specialist piling contractor. The advantage of using screw piles is that each pile has a test load which is directly related to the installation torque. Corrosion protection will be needed on screw piles in the zone of likely molsture movement from natural processes and trees, which depth Is seen to be equivalent to the very loose/loase sand depth of 3.0 metres. 3.5 Slope Stability . Long term stability can be achieved by providing earth retaining systems to support the slope in the construction area, An anchored support would involve tess site disturbance, would be the most economic and could be installed at a lesser cost than any concrete cantilever pile system. 3.5.1. General Slope It would be unreasonable to assume that all of the top very loose/loose sand could be removed below the house footprint. In an extreme event any debris from a sand slip would contain trees and tree roots for which the angle of repose or friction angle would be consistent with the slope as it now stands (32 degrees). This slope for all practical purposes represents a Factor of Safety (FOS) of 4.0 which can be improved to not less than 1.5 using the sand anchor system. 3.5.2 Centre to Northern Part For the central to north part of the site, the most likely worst case slip is the removal of 1.5 metres of sand fram below the house footprint which would lessen the present average slope from 36.5 degrees to 32 degrees. The slip feature as noted above has already removed 1.5 metres of sand which is consistent with this design recommendation as a long term solution for support to the slope in the event of sand removal below the house. There are three wall design cases as marked on the enclosed plan (Figure 1). Case No Wall Location Slope Below Wall Design Height ' Top RU. 2.0m 32° 4.0%m 2 Top Rt 32.0m 36.6° 1.5m 3 Ton Bh a8. 0m 20° 1.5m (max) Note this height takes into account an increase in the slope steepness at Park Road 00697 S Biggs MORRISON GEOTECHNIC
Page 19
Job No. C06/023 3.5.3 Design Parameters Case 1 & 2 (Bottom Wall) Sand Density 17 KNim* Average Angle of Friction ($) of retained sand 30° Average Slope of retained sand (8) 26° fh 0.87 Active Pressure Coeff. Ka 0.6 Passive Pressure Coeff Kp 0.75 Surcharge NIL Case 3 (Top Wall) Sand Density 17 KNim> Average Angle of Friction of retained sand 30° Slope of retained sand 30° Bib 1.0 8 Active Pressure Coeff. Ka 0.85 Passive Pressure Coeff Kp 2.0 Surcharge 5 kPa For the central scour zone, assume an excavation depth of 2,0 metres (0,5 metre margin for erosion) and apply the same parameters. As tree preservation on this site is a key issue, the Slope cannot be compromised by the removal of any tree to accommodate the walls except for Safety reasons. The two walls as proposed can however be located to avoid existing trees. A space in the wall may be left to avoid trees but the length of the space must be considered as part of the slope. Soil forces from any space must be resisted by the adjacent retaining wall. 3.6 Anchor Support The anchor support system can be detailed for horizontal restraint and moment, using the above data and H = 1.0 to 1.5 metres. Moment considerations may require two rows of anchors, staggered at a spacing of not more than 3 metres. angle down from the harizontal or as an alternative, sand anchors Installed using air, and tensioned the required load restraint. Any restraint, whether using screw piles or conventional sand anchor ; should be load tested to not less than 1.3 times the design working load. The approximate anchor tension of 6OKN to 100kN could be accommodated using screw piles at a og Depending on the test results and in the experience of the anchor contractor, It may be necessary to include grouting of the anchors to remove any doubt in the integrity of the sand which supports the anchor in tension. At the north end of the proposed construction, the clearance to the boundary is only 4-4.5 metres. Here the anchors may be set at a steeper angle or skewed to take advantage of the stronger sand at depth. Otherwise the anchor tension resistance could be limited to about 4 tonnes when set in the top very loose sand. Wall anchors should always be behind the active wedge (Figure 2) and to avoid load on the toe of the wall from the anchors, their length should be extended below the line of the sand strength or angle of fepose. For this site all anchors should be extended below the zone of potentially unstable sand as shown in Figure 2. 00697 S Biggs MORRISON GEOTECHNIC
Page 20
Job No, C06/023 Corrosion protection is needed for sand anchors for the same reason as for the vertical piles, but the length of treatment should be increased to 5 metres allowing for the slope. 3.7. Slope Alteration Issues & Monitoring An aim in the construction is to cause as least disturbance to the natural slope as possible. The tree protectlon and retention requirement can be satisfied by the design, which is a strong point in the long term stability of the site. A short term alteration is the provision of access for the screw pile installation machine. This is only a smail machine capable of working on a narrow track through the trees and would have no effect on short term stability. When piling is completed the tracks should be restored to the contours of the natural slope then covered with mulch matting to prevent erosion in the short term, Survey marks should be established on the structure to monitor the construction and surrounds for movement. There is some evidence in the shape of the ground surface and in the shape of trees, that there has been some down slope movement of surface soils from gravity and erosion effects. With the proposed construction, such effects should be eliminated or at the very worst minimized to be within tolerable levels (i.e. less than 20mm) in the building lifetime. Nevertheless, this possibly should be monitored at regular intervals, say three monthly in the first year, and subject to the results, It may be possible to cancel this altogether. 4.0 CONCLUSIONS The proposed construction, a residential dwelling on this site is feasible provided that the long term aims are addressed as required by the Noosa Hill Development Plan and the Noosa Clty Council requirements for development in a sand dune area. Foundation System - Screw Piles Slope Support - Retaining wall with screw or sand anchors for an assumed erosion height of 1.5 to 2 metres. Short Term Provisions - Reinstate access tracks and cover with mulch mat. - Monitoring far structure movement in first 12 months. Long Term Provisions - Irrigation systems for general Irrigation. - Inspections for success of under floor vegetation. - Stormwater and slope erosion effects should also be addressed by a regular inspection at least annually. Yours faijnfully for and on behalf of MORRISON GEOTECHNIC PTY LIMITED Encl: Site Plan cc. A. Becconsall 00697 S Biggs MORRISON GEOTECHNIC
Page 21
RETAINING WALL AS
“oO QESCHRED IN NORAISDN ~
GEOTECHIICAL REPORT
“eo 7 SECTIONS
“ “oa
av “ PSL
aoe ay
A3 SHEET
nin
; saps ‘ey
TS NOTE: ENSURE ALL PILES ARE A MINIMUM
1026 CON-1S 100mm CLEAR OF ANY TREE BASE, -—-~
PAU ne ee EMACTLOCATION-REUTIVE-TO-TREES™ =
MT AD pwizy ARE TO BE DETERHIRED-ON'SITE. ~
© CUNT) — DENOTES. A-D0ti7iam F27 SLEEPER
HT S44 _--RETARING WALL. REFER TO DRAWING
eer" $201 FOR DETALS.
SCHEDULE
RWi STEEL POST ANO SLECPER WALL. REFER TO ORAWINGS
5201 FOR DETAILS,
RW2 STEEL POST AND SLEEPER WALL. REFER TO DRAWINGS
eee ea $201 FOR DETANLS. .
. PI SCREW PILE TO BE DISKINED BY PAING CONTRACTOR.
~~ Prg pat House far T. Biggs REFER TO DRAWING S701 FOR DETARS.
ez c“Retaining Wall Design Cases
. 39.61 a CONSTRUCTION WORKING LOADS
ian —ms ae “Job No: CE06/023 \ Pr fi0e | BORN —>
wornson Date ; 23.11.06 S
GEOTECHAIC < . 4,
Figure 1 is \ .
\ \ PRELOMMARY NOT FOR CONSTRUCTION
Oy GANTEC McWILLIAM |proposen HOUSE FOR
fanrulting enginecrs T.BIGGS
ADE Tem The
BPA, Ssh fe fore set 14 PARK RD. NOOSA HEAOS
GROUND FLOOR RETAINING WALL
AND PILE PLAN
Bipedaheds [os ””™~—“C—;tS
ii” Thiteweme [aioe ac __" 06B409-Si0i l= P21
Page 22
IL BASOO \ ene Pt Ber DARA LLB RANE ACTIVE WELK: eo SE SD | ade" W/o ; } Xs | aaa —T > \ f PS “7. ty, 7 a ° * SW/D AVENE FTO BE 100 THINS Bove . I BELO FO wt . CF VY. L008 SAND a - > BIC LE SF MECIESS IE TO? CEPA SCIP A Chhoe. DOES MOT CASS a THY EELIM OA Anchor Location Relative to Retaining Wall and Boundary Scale 1:50 MORRISON Job No: CE06/023 GEOTECHNIC Date: 23.11.06 Figure 2
Page 23
Golder Associates Pty Ltd
ABN. 64 006 107 857
Unit 1, Galion Centre, Newspaper Place
Golder
Mo dore, Ald 4558 Australi % i, i
PO bor 2660 Maroocryciors BC, Qid 4558 Austallo} _ Associates
Telephone (07) 5443 3511
Fox {07] 5443 6645
hitp://vaww.golder.com
REPORT ON
GEOTECHNICAL INVESTIGATION
PROPOSED HOUSE
3 LOT 3 PARK ROAD
NOOSA HEADS
Submitted to:
Star Crest Pty Ltd
C/- Greg Gibbs Architects
PO Box 1272
NOOSA HEADS QLD 4567
DISTRIBUTION:
2 Copies - Greg Gibbs Architects
1 Copy - Tod Noosa (Mr Stefan Prystupa)
{ Copy - Golder Associates Pty Ltd
July 2003 02.6821 18(AD)
oe
OFFICES IN ADELAIDE. 2RiSR4NE, CAIRNS, MAROOCHYDORE, MELBOURNE, PERTH, SYDNEY. NEW ZEALAND, INDONESIA, HONG KONG. CHINA, THAILAND, PHILIPPINES Poe seeeeiotn
OFFICES ACROSS NORTH AMERICA, SCUTH AMERICA, EUROPE, ASIA, AUSTRALASIA, AFRICA.
‘Aacrrelle
Page 24
July 2003 -i- 02682118(AD) TABLE OF CONTENTS SECTION PAGE 4.00 INTRODUCTION woes ccceeesesesvessseessussessstussssessstessseessesseseseecsesesesseces 2.0 INFORMATION REQUEST uu... cece. 3.0 SITE TOPOGRAPHY AND GEOLOGY 4.0 FIELDWORK 0000 ccesccscecsescaescsssscsesvececssecees 4.1 Previous Investigations... cccccccsscccesseeeee 4.1.1 Investigation in 1984 o.oo ccseccccccsccesesesesseeceeeveseese 4.1.2 Investigation in 1990 00... cccssssesecsescceseseesessecereeeeeese 4.2 2003 Investigation ........... 5.0 GROUND CONDITIONS... 6.0 ENGINEERING COMMENT. 6.1 Proposed development...........0.... 6.2 Slope Stability Considerations ...... 6.3 Foundations... .ecccsccseseseeeesees 6.4 General Points... .eeceecececcscecesstecssssssessrsscsecssvsuceveee 7.0 IMPORTANT INFORMATION ...0....ccccccssescssecccsssesssssessssessstosercssssseeceeeecesecess 9 LIST OF FIGURES Figure 1 Site Plan Figure 2 Cross - Section LIST OF APPENDICES Appendix A Reports of Boreholes from 1981 and 1990 Investigations Explanation Notes, Abbreviations & Terms Used on Borehole and Test Pit Reports Method of Soil Description -Used on Borehole and Test Pit Reports Appendix B Reports of DCPs from 2003 Investigation Appendix C Construction Management Plan— Tod Noosa Consulting Engineers Appendix D “Jmportant Information About Your Geotechnical Engineering Report” Golder Assoctates é
Page 25
July 2003 -}- 02682118(AD)
1.0 INTRODUCTION
Golder Associates were commissioned by Starcrest Pty Ltd to address a Noosa Council
information request (ref. Section 2.0) for a proposed house on a steeply sloping sand dune at
14 Park Road, Noosa Heads. A report was prepared by Golder for the proposed house in
October 2002 (Ref. 0268211 8({AA}) and comprised a review of an earlier report by Golder in
March 1990 (Ref. 90680046).
Golder Associates have conducted several site investigations in the area of the proposed
structure, for projects varying in scale from similar residential developments to large scale
unit developments. An initial investigation on this site was carried out by Golder Associates
in March 1981 (Golder Associates 1981), for a proposed house. The results of the previous
investigations, and the experience which has been derived from our involvement in similar
projects in the vicinity and in similar topography, has been used as the basis of our
recornmmendations in this report.
The site was inspected by an experienced geotechnical engineer from this office on 12
September 2002.
This report includes a detailed presentation of the results of the fieldwork, recommendations
on founding systems for the building, and construction procedures to be adopted so that the
potential for slope instability is minimised. Additional information requested by Noosa
Council has also been included.
2.0. INFORMATION REQUEST
An information request by Noosa Council regarding the proposed development (Ref. 23218
DA, 1 May 2003) includes specific items requiring address by Golder Associates. These
items are detailed below together with references to the sections of this report where the
additional information has been provided.
Golder Associates
Page 26
July 2003 02682118(AD) Information Requested Reference 7. The Geotechnical Engineering Report prepared by Galder and Associates and dated October 2002 utilises soil-testing from previous testing conducted in 198] and 1990. Since this time, soil conditions may have altered, Particularly with increased development in the area. New soil testing should be conducted and utilised for the Geotechnical report, although comparisons to the previous testing and soil conditions is welcome. Sections 4,2 & 5.0 8. It is noted that the applicant intends to store sewerage and stormwater on site via holding tanks located on piles underneath Proposed Pavilion 3. The structural analysis and geotechnical report do not appear to consider the potential loads this will place on the piles. The reports should be extended to consider these impacts, This should consider the Sizing of the tanks and should consider the worst-case scenario with both the holding tanks fully loaded. Section 6.1 & 6.3 9. The Geotechnical report refers to ‘a steep incised gully runs towards Park Road through the centre of the block This gully has been formed through erosion or shallow movement in the soil (or both)’. It is noted that this area is located underneath the proposed pavilion 3 additionat Stability investigation should be carried out and should consider the potential impacts of the surface irrigation proposed under the dwelling. Section 6.3, Para 7 10. The Geotechnical report states that Slopes on the site range from 14° to 45°, please indicate the various grade ranges across the site, particularly in the vicinity of the pavilions and driveway area. Figure 1 J]. Provide the irrigation rate/hydraulic loading on the slope proposed via Section 6.1 & the surface irrigation under the proposed pavilions. This should consider the | 6.2, Para7 worst case scenario being the plants dieing and being minimal to no uptake of water and how this will affect the site Stability. 15.7 The Construction Management Plan shall be reviewed and approved by | Section 6.4, the consulting geotechnical engineer Para 2 Golder Associates
Page 27
July 2003 ~3- 02682118(AD) 3.0 SITE TOPOGRAPHY AND GEOLOGY The site is located on a steeply sloping sand dune to the east of Laguna Bay (the location of the site is indicated on Figure 1). The slope of the dune was determined from a contour plan of the site which was provided by Max Watterson & Associates (October 2002). The majority of the site slopes towards Park Road at an angle within the range 31 degrees to 37 degrees (Ref Figure 2). However, small areas of the site are as flat as 14 degrees and other areas are as steep as 45 degrees. The elevation of the site varies from RL 10 m (approx) adjacent to Park Road, to RL, 37 m (approx) on the eastern boundary. The slope continues downwards to sea ~ level, approximately 25 metres west of the front property boundary, at a shallower angle of about 25 degrees (Ref Figure 2). Park Road has been cut into the slope, and a stone retaining wall 1.0 m to 1.5 m high runs parallel to Park Road. A steep, incised gully runs towards Park Road through the centre of the block (Ref Figure 1). This gully has been formed through erosion or shallow movement in the soil (or both). The site is heavily vegetated with small to large trees, and low to medium height shrubs, grasses and vines. Only very small areas of the slope are without any vegetation cover. Several of the larger trees are evidently leaning downhill and have their root systems exposed, indicating that the slope is creeping, and that the surface sands have moved downhill over the life of the slope. 4.0 FIELDWORK 4.1 Previous Investigations Due to the steepness of the slope, and the necessity to maintain the vegetation on the slope, hand operated equipment was used to investigate ground conditions. The results of the fieldwork from previous investigations are included in this report as Appendix A. 4.1.1 Investigation in 1981 The 1981 investigations included four hand augered boreholes to between 4 m and 5 m depth, and sixteen dynamic cone penetration probes to depths of between 2.7 m and 3.9 m. The location of the boreholes and dynamic cone probes are indicated on Figure 1 (Appendix A). 41.2 — Investigation in 1990 The fieldwork for the 1990 investigation comprised two hand augered boreholes to depths of 3.5 m and 8.5 m, and 12 dynamic cone penetration probes to depths ranging from 3.9 m to 8.2 m. The location of the borings and the dynamic cone probes are shown on Figure }! (Appendix A). Golder Associates
Page 28
July 2003 -~4- : 02682118(AD) Eleven of the twelve dynamic cone probes were carried out continuously from the surface, without intermediate augering. One of the twelve cone probes (Location BHI as shown on Figure 1) was carried out within the augered borehole by augering to or beyond the previously probed depth, before continuing with the probe. This was done to minimise build up of friction along the probe rods. However, it was decided upon completion of this auger/dynamic cone probe that the disturbance caused by the augering process was unacceptable, and that continuous probes should be conducted. Dynamic cone rods without external collars (which are the cause of excessive friction on the rods) were obtained, and the field work was completed with this equipment. The fieldwork was supervised full time by a geotechnical engineer from our Brisbane office, and a ‘walk over’ inspection of the site was conducted by an experienced senior geotechnical engineer, also from our Brisbane office. 4.2 2003 Investigation To.address item 7 of the Noosa Council information request, five DCP tests were conducted across the proposed building area to depths of up to 6 m. The DCPs were carried out by a senior geotechnician on 25 June 2003. Reports of DCP Tests (2003 Investigation) are presented in Appendix B. DCP test locations are shown in Figure 1. 5.0 GROUND CONDITIONS Results of the field work for the 1990 investigation are included in this report as Appendix A. Detailed descriptions of the strata encountered in the hand auger holes are given in test bore reports, and the results of the dynamic cone probes are included as Table Al in Appendix A. Detailed logs of the four boreholes and the results of the dynamic cone tests for the 1981 investigation are included in this report as Appendix A. Three cross sections perpendicular to the slope contours have been drawn (Figures 2, 3 and 4 Appendix A), and one section along the line of the proposed walkway has also been prepared (Figure 5 Appendix A). Borehole profiles and plots of dynamic cone results have been included on these sections, The general downward sequence indicated by the previous investigations, and confirmed by the 2003 investigation, is as follows: Very loose to loose sand — encountered in all bores and indicated by all dynamic cone probes, to depths ranging from 0.9 m to 3.7 m. The average depth of the loose zone as determined by the field investigations was approximately 3.0 m Medium dense silty sand — encountered in al! bores and indicated by all dynamic cone probes, to depths ranging from 3.8 m to 8.2 m. Golder Associates
Page 29
3 July 2003 -5- : 02682118(AD) Dense silty sand — indicated by dynamic cone probes DCP9, DCP3, DCP8, GDCP1 and GDCP5 at depths of 3.8 m, 5.1 m, 5.3 m, 3.6 m and 4.5 respectively. Dense sand was not encountered at any other locations within the depth of the dynamic cone test. (Dynamic cone testing continued to at least 5.0 m at all other locations, except location 1, which was tested to a depth of 8.2 m). Experience on other sites in the vicinity indicates that in general, the sand becomes dense at an average depth of 6 m to 7 m. Ground water was not encountered in any of the augered boreholes. 6.0 ENGINEERING COMMENT 6.1 Proposed development Architectural drawings prepared by Greg Gibbs Architects indicate that the development is to comprise a single storey level house of lightweight construction. Vertical loads that will be imposed on the foundation system from the house will be minimal. Additional vertical loads will be exerted on columns by proposed stormwater and sewage holding tanks. We are advised that access will be via a driveway from Allambi Rise. A landscape development plan prepared by Land Graphics (Ref. GG655, LAO2, Sheet 02, Issue A) indicates that planting is proposed on the slope undemeath the proposed house. The plants are to be maintained by a manually controlled spray irrigation system that produces a fine mist and is attached to the underside of the house. Land Graphics have indicated that the maximum irrigation rate that will be applied to maintain the proposed plant species would be in the order of 5 mm/hour. 6.2 Slope Stability Considerations As discussed previously, the majority of the site is presently maintained at an angle of 31 degrees to 37 degrees, and limited areas of the slope are as steep as 45 degrees. Some instability/erosion has occurred on the site. Under normal circumstances, loose dry sand would be stable in the Jong term at an angle considerably less than the angles presently maintained. The slope is maintained at unnaturally steep angles due to the reinforcing effect of the root systems of the vegetation on site. Hence, even partial removal of the vegetation will result in localised instability, with the near surface loose sands tending to form a slope angle approaching the natural angle of repose of loose sands (about.30 degrees). It is essential, therefore, that concerted efforts be made to ensure ‘that vegetation on site is not disturbed. The proposed landscaping beneath the house should act to minimise erosion of the near surface sands. However, we recommend the installation of a permanent surface crosion protection system in order to allow establishment of the proposed plants and to minimise surface erosion should the plants die. Golder Associates
Page 30
at July 2003 -6- 02682118(AD) Ground water flow parallel to the slope may result in significant erosion. It is therefore important that surface and stormwater drainage systems are designed such that surface runoff is collected and, as little water as possible penetrates into the slope. It is our assessment that the proposed irrigation system under the house will have negligible impact on slope stability subject to the installation of a permanent surface erosion protection system in combination with the proposed planting. In sand, erosion and the risk of instability can be minimised provided surface protection is maintained and concentrated high velocity flow is not allowed to occur. Sand is highly permeable and most water wil) travel directly downwards and not across the surface. By irrigating the plants on the slope beneath the house using a fine mist system at the proposed rate of 5 mm/hour, it is our assessment that the resultant impact on slope stability will be negligible and substantially less than that which occurs naturally during heavy or prolonged periods of rainfall. The slope will be shielded from such rainfall by the proposed house. The method of irrigation (ie. fine mist spray) will prevent concentrated surface water flows. Given the highly permeable nature of the dune sands, and the low rate of irrigation proposed, it will not be possible for saturated conditions to develop under the house. Without saturation of the sands, there will be a negligible risk of major slope instability. If the plants die, the irrigation system will 20 longer be necessary and, consequently, will be shut off. This will result in no impact on the site stability subject to the installation of surface erosion protection as recommended. No cutting or filling can be allowed on site, and material excavated from the foundations should not be stockpiled on the surface. Undercutting of the slope is likely to initiate slope instability, and should be avoided. It is recommended that the driveway, where necessary, be suspended on piled foundations (ref Section 6.3). Cutting and filling shall not be undertaken on this site. As discussed previously, there are indications that the loose surface sand has undergone creep movement down the slope. However, our experience in the area indicates that it is unlikely that such creep will have a significant effect over the life of the structure if it is properly designed. If the guidelines above are followed, it is considered that the factor of safety against Slope instability will be satisfactory and commensurate with the safety factors for similar developments on similar sites in the area. 6.3 Foundations The stability of the slope has a significant bearing on the available foundation options. The Possibility of isolated shallow slips can not be precluded and there is evidence of a shallow slip at the head of the gully. For this reason, high level foundations are not recommended to support the proposed building. Golder Associates
Page 31
July 2003 -7- 02682118(AD) In considering the feasible pile foundation types, consideration must be given to the effect of pile construction techniques on the stability of the slope. Jetted concrete piles would require large volumes of water for their installation, which could possibly result in severe scouring of the sand slope. Hence it is advised that jetted concrete piles should not be used on this site. Any form of driven pile should not be used on this site, since vibrations caused by the installation process could potentially initiate slope instability. ’ Based on these considerations, bored or grout injected piers are considered appropriate for both the proposed buildings and the proposed walkway. However, due to limitations on site access and on heavy loads being placed on the slope, heavy duty drilling equipment is impractical for this site. Small tripod type auger rigs (for bored pier construction) or small skid rigs are available and would be well suited to the site. It could be expected that difficulty may be encountered in maintaining an unsupported open hole in the loose sand near the surface, and that some form of stabilisation has been achieved on other sites on the same sand dune by augering out to 2 m or 3 m, running cement and some water down the auger flights, and then drilling out the following day. Spoil from pile excavation should not be stockpiled on the slope, and similarly, any drilling fluids used in drilling the piles should not be discharged onto the slope. The vertical loads to be imposed on the foundations will be small, and hence the ultimate bearing capacity of the soil will not be the limiting factor in the foundation design. The vertical load capacity will be a function of pile type and founding depth. It is estimated that a 400 mm diameter pile would have a working load capacity of 300 to 400 KN founding 8 m below existing ground level in medium dense sands. Further information contained in a letter by Tod Noosa dated 17 June 2003 indicates that the maximum load on a single 450 mm diameter pile will be 20 tonne (200 KN) including the weight of fully loaded stormwater and sewage tanks. The nominated pile structural capacity and founding depth is 50 tonne and 9 m respectively on the Tod Noosa drawings. Further investigation would be necessary if higher load capacity piles are required. However, lateral loads on the piles are potentially significant. If localised instability develops in the loose surface sand directly up the slope from a pile, heavy loads will be placed on the pile as the sand flows down the slope past the pile. Estimation of lateral forces on piles should be based on an assumption that lateral ground movements occur along the interface between loose and medium dense sand. The average depth of the zone of loose sand was determined as 3 m. The calculation of lateral forces on piles should be carried out in accordance with the method outlined in the figure below. It is estimated that the depth of embedment required to resist the lateral forces developed by the Golder Associates
Page 32
July 2003 -8- 02682118(AD)
flowing sand will be of the order of 5 m to 6 m below the interface between the loose and
medium dense sand (i.e. a pile depth of 8 mto 9 m).
Passive K, = leterat earth
Praxaure Pressure coefficient
Olsiribuslal - 277
y Y = sof. -densily
K\ = 18 kim?
# K,,H H = death of moving sond
, am
Equtvalent Loterat Locd on Pls:
Pie dite yh a Sa"
NOT TO SCALE
Equvolint Pte a
Width {dounstopa} Equivatent Pua Width = LS ad
: * fupstopel
Foundations should also be taken below a line extending from Park Road upslope at 27
degrees (Ref Figure 2). This means that if piled foundations are required near the top of the
block they will need to be at least 10 m deep.
6.4 General Points
It is critical that vegetation disturbance be minimised during construction and that wherever
vegetation is destroyed (eg. under the proposed building).erosion control matting be laid to
assist in revegetation and to guard against localised instability. Strict control should be
imposed on trafficable areas during construction by temporary fencing and log steps (or
equivalent). All foundation construction on the site should be carefully monitored by an
experienced geotechnical engineer from Golder Associates.
A Construction Management Plan (CMP) for the proposed works has been developed by Tod
Noosa (Appendix C). The CMP has been reviewed by Golder Associates.
It is noted that the sand slope to the beach below Park Road adjacent to this site has a low
factor of safety against stability failure. If this slope and Park Road failed, the resulting slope
movement could have a major effect on the proposed development, beyond the considerations
or brief of the current work.
Golder Associates
8
Page 33
July 2003 -9- , 02682118(AD) 7.0 IMPORTANT INFORMATION Your attention is drawn to the document - “Impoctant Information About Your Geotechnical Engineering Report”, which is included in Appendix B of this report. This document has been prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which Golder Associates is a member. The statements presented in this document are intended to advise you of what your realistic expectations of this report should be, and to present you with recommendations on how to minimise the risks associated with the groundworks for this project. The document is not intended to reduce the level of responsibility accepted by Golder Associates, but rather to ensure that all parties who may rely on this report ate aware of the responsibilities each assumes in so doing. We would be pleased to answer any questions about this important information from the reader of this report. GOLDER ASSOCIATES PTY LTD Ash vey BE(Geol.) Geoff Hurley MSc DIC C’7Geol RPEQ Geotechnica} Engineer Office Manager GAH/ACDYbp WGOLDERMARLVOBS\20021G EO TECHNO 26821 18\AD0 263211 BRDOC Golder Associates
Page 34
CLIENT VANCILA INVESTMENTS PTY LTD
SITE PROPOSED HOUSE
LOCATION LOT 3 PARK ROAD NOOSA
TEST BORE REPORT
1
LOC. NO.
DATE 19 February 1990
PROJECT NO. 90580046
SURFACE LEVEL = 24. 0a»
approx
Sampling and in-Situ Testin
TEST DESCRIPTION OF STRATA Depth g ng
Loc Interpreted from field and laboratory testing (m) Type Depth Results
VERY LOOSE YO Loose SAND : GL
Very Loose to loosw light grey and off whits fine to
medium grained sand
MEDIUM DENSE SILTY SAD 3.2
. Mudium dense dark “crangs brown snd very dark brown fine
to medium grained ailty sand
5) Sed Table Al
fox Dynamic Cone] Rasult
BORE DISCONTINUED AT 5 Su 8.5
{Hole Caving Behind Auger)
Hand Auger i
EQUIPMENT B SUPERVISOR Fidler
No free groundwater en tered whi i
GROUND waTeR g encountere ile augering
REMARKS * Surface level interpolated from survey plan provided
A -auger sampte SCALA PENTROMETER TEST
Oo -disturbed sample AQ kg hammer with a 0.5m free fall is used to drive a 30” apex
u “undisturbed sample angle cone of 0.020m diameter, followed by smatier diameter
SP Scala Penelrometer, tods. Results are recorded in blows per 100mm Penetration. .
ge -Pockel Penelromeier Where fesis are extended beyand 1.5m penairalion, eacava- Golde r Associates
vshear slrengih lion ts catried oul prior to continuing the test.
(i.e, 4% unconfined -
compression sirengih) .
GEOTECHNICAL ENGINEERS
Page 35
- CLIENT VANCILA INVESTMENTS PTY LTD
SITE
PROPOSED HOUSE
LOCATION 1°T 3 PARK ROAD NOOSA
TEST BORE REPORT
LOC.. NO. 5
DATE
PROJECTNO, 90630046
SURFACELEVEL 27-0*
27 February 1990
GROUND WATER
REMARKS
A sauger sample SCALA PENTROMETER TEST
D -disturbed sample A 9 kg hammer with a 0.5m [ree [all is used to drive a 30” apex
uv undisturbed sample angle cane of 0.020 diameter, followed by smafar diameter
$i ~Scala Penetrometer . fods. Resulls are recorded in blows per 100mm penetration.
PR Pocket Penetrometer ‘Where lests are exlended beyond 1.5m penetration, excava-
Su shear Strengith lion is carted Gut prior to conlinuing the lest.
{le % unconfined
No free groundwater encountered while augering
approx
Sampling and in-Situ Testi
TEST ‘DESCRIPTION OF STRATA Depth pang esting
Loc Interpreted from field and faboratory testing (m) | Type Depth Results
LOOSE SAND GL
Looso dark grey send with orgsnic material
LOOSE SARD . 0.3
Loose off white sand with dark grey and orange brown
bands
‘4 See Table Al
@) for Dynamic Cons Rbsult
LOOSE SILTY SAED 2.1
Loose. orange brown and red brown silty sand
LOOSZ/MEDIUM DERSE SILTY SAND 2.6
Generally medium danse (with some loose zones) orange
hrown and red brown silty send
- « ccassional cemented bands
BORE TERMTAATED AT 3, Soe 3.5
(Auger refusal on cemented band)
EQUIPMENT Hand Auger SUPERVISOR Fidler
* Surface level interpolated from survey plan provided
COMPpFESSion strength)
Golder Associates
GEOTECHNICAL ENGINEERS
Page 36
RESULTS OF SCALA DYNAMIC CONE PENETRATION TESTS @ DCP 12 ttt tint ste Ne NNNMMMOMNN NS AstImMons nwo mem ono oo 11 tated it etadaddeA HNNN IMAM MS torsos mss AMAM Mmm wo 10 ANNNNNMONM Arms iowwnw + tm sw co Mm wo 9 ooooceoeoco$n AAAMNMASIS ew on 8 Artin tin tain Or+rannaananm Ded bob beat bade” & NONNMNS TST Wee eR DOOR RRS wnmuonwon 7 90 tH irnttetre tate tee tases At AR HANTS NNNAN MMH tm wastes CoveddtnidaAer AA irda AARNN HO NwWw I wuestnnnn nwo Qo wn BAAD 5 ogoooo0ceo:'ita tad trddd des HANNANMHOON ANYVAMNnYweNnw nrrmnstman Blows* per 100om Penetration & ooocoocotiind Ori ind adninAn BHAA HRA NNNN NNAM INAS AL nants 3 ooococradadr ret ANMSE MMA NmMHtoN Rone DBOOOADWOMOOA D VPwonnennrnrnrs DCP | DCP | DCP | DcP | DCP | pcp | pcp | pep | pcp | pcp | pcp 6 N - COMA HANANMMM NIMIMITMNMNN NST Ronn wome nA ROR RR : vsg al . : 2 4no Te —+ Depth ATA AAS ed meooeedson tee AIsItIen an ovoooooccocNes HAMENOR OAS dddidddddrdia SHamsnonaa doiddrniddrigi aan = al . y on ° AINA AA A t sAdAsHenaan NANNANANAN AA Anas wenN ano o o n ° ” n mi ” n + Odamsnoenan AA AM AMMA dams nuon Yigdsds Oram sne toeeee¢ Golder Associates GEOTECHNICAL ENGINEERS.
Page 37
5 March 1990 20> 90680046 RESULTS OF SCALA DYNAMIC CONE PENETRATION TESTS vo 2 oO at a Blows* per 100mm Penetration DCP | DCP | DCP | pcP |DcP | DCP [DCP | pcp DCP | DCP} DcP [DCP 1 2 3 4 45 6 7 8 9 10; 11] 12 11 6 3 12 12 Prep oan 1 wea qawa cow wu Neo o fun nu w nn on~nwo o ~~ 14 16 ' ww os ° wo NanuU Pune ‘ on panuuans BAN Rr rE ODM Ww UPUBUONUUDN UA AN ADU PUP EE UWE - NS PPRUPUUPY Nau Pwo WUE OCOWIKNUE LYS 1 AuUHNUuUUuNuUUU t . SCwWBINAHWP Une t ' NANADAAAARAH . « Test 5.8- 7.4 ANMNAANRAAAAR soe . . WaAINUEWH YO 4 GvemUauERuone WOUNAUEUWHHO t aenNvwwyssy NwWWNNNNYWNNN 1 BeOnnru oo nan ro on) oa oo Noe Aa) * A Gkg hammer with a 0.5m free fell is used to drive « 30° dLameter, followed by smaller diamater rods. penetration. apex angle cone of 0.020 Results are recorded in blows Per 100me Probe 1 was deiven by augaring out a hole ond then driving the dynamic cone from the bare of the borohole. Where no results are tabulated, this indicates that the hole wes augured ahead of the depth to which the core had been driven, before driving was continued. . Golder Associates GEOTECHNICAL ENGINEERS:
Page 38
|
|
r T
y r r r t . r 7 T
— r T 7 T+ To A ea |
| wg | Ps &
3 © !
»
Wo Zz
cy, o
Dw
O ow
oo
ww 7 z
aIS 1 —
xi SBE
lS fa
ose
: : ave ’ ee er eee 8,
g/F ave ~ - |
ze
© 4531
m1 go fads |
— |e
2 : Sasi . -_ eam em nee meee
STS] sas % _
. a fle
g ee ee
: . JoreayUs tee eee -
Ss E yah wn vanes ee |
tu 5 | s[osm oe ee. - =|
5 z Fm ee me rm pe ef re ee i ce ee eee i --
8 [le — ;
-{{5 Lint)
O fgfel_ os !
8 ANZLNQD |
& Ma) ene — - oe . —— | ———.. - RR ere eee mm mm tenes ee — |
. 8 Tsuna za | _.
ao S 36.
“ wee a
2 evant TE Ree ee em me ee en eS ee ee,
. 2 ‘ aia - - fo eee ee
oO a 4
isn wae ene te ee
c Se Oe ee me] ee wee ws
iw cane teen
3 ol ee ee . Se ee ees
: t
°
. |
ye og
: ; . we .
als ? - ~ ° : t sees eet tt be ee 1 !
F sobs epg epee
= ae, F pe tt
eye SIO,.. |
a
1} 907 swewns |
|
3/2) 9 _ s .
alas z s s
ou q oa z s 3 !
° -
‘ z » 5
- g : : ;
f x
el g § - 2 5
H 2(S . 2 &
el z|5 a L c
C vis « . a ok 3
“| [Ele 8 2 z a:
ul el] el & = 2 2 cn
eel ola = 33 Be
worl > po = D2 ied 2 |
| o ve ao g 2
yz >a 24 !
: , oé
: zg:
> =~ 5 !
B/E] ye & bs |
rfe]8]e 2 ; bs
eqeya]s e ef | -
fh] E|? é 4 Be
Elbe] a 1 Acton et Per erarer
~ _ . :
Sete pe LL: ;
Page 39
mw |
° «
=
Ww 7 z |
Qe ° 1
D>w
= ]
win = ;
</® 7
S|o ose
alo dé p
za s=5 |
y 2 ave
z - ee ee ee ee nee --. - eee tee ee eee es - I
¢ ror |
gli. JO Fda
MN [és i
il [tor on ) . |
wey y] Sders + oe ee 3
. ela ee wee cee cemeteree gee cee © mer ceee seems ~ ecmme cme ee me ano woe
oO Ql aL roves |
Z all? aN
= _I ans ~- were ee eee meee eee ee me !
Ss g §30H!
ve} {[S] svonsets
an olf dum nee ee tes tee tear emcee ae ener ee pee nme teemmeen a canna ce ate see emeneeme nee
~ a diner
oO z sy anon !
3
zr a ANJLNOD
wl ary) Bunasion :
ven re ~ ee en ne ee ee “my
tu e —— ee eee ee te ene ee ee ee |
Ss ALtSNIC
-{ < A
& Eh ltyan ano
funny INTL SIC |
Mm r 75076
s -- ween ef ee ee ee eo ee inne eee ee ee
Y | foaranive
3 | ne ITED Tee |
SJ} pads, Janes {
=
_ = - N a]
g ae F pe be ee et eet et tt
i] | 907 uarwe |
s
: |
215 .
ayel a z %
ala)a c $s =
‘ . 2 o
t z v 3S
i = 2 & |
2 © 3
g 2 €
< e 3 |
. & :
& j g e ®
#/]$ a é fe +
3/2 e - § ge 2
= . = = E
|e g p> & 32 = &
uw < - Lo oe g
>| = “ ee k koe e
anal a2 os ¢ 3
- ¢
=z 2
ae 7. |
a
z
gloje a w >
syeleft Sy |
Elfiz[.y a g¢é
clei a}? = Ze
Page 40
RICANEN * “ee . , .
SuSracCe tucvat.ow 308 cance BOR E. H oO LE No. 3 FIGURE 4
ICLwa oN VERTICAL atwutn a SHEET 1 OF )
OAL Troe HANO AUGER Dare = 7. $1981 PAOsCCY PROPOSED HOUSE, LOT 3 PARK AOAD
: ws él ve » CLassacarn ara | sratecin sata Olnca
8 esty'n | E flees ST, Yratame teas!
STASNSRAPHY g ocern* s ay] ot zS= o | g 42 } | suteroy
- < E“) 31552) $-i 525i 32 * CifePal
| SAO (SP) . : |
i very toose, fine grained, F . 1 \
L grey !
E Eo |
f E |
a t | |
L : | |
: | 1 :
to b 2 | |
. - \ 1
: Pi ds
f ——~ t tort :
{ dark brown, moderately dense a | | i
r - | ‘
- R Pir | |
t - i
r : r yj ot |
r - oF
r grading anist r ! 1 ! : : ' i
E : ; oi
E Fe hy .
A a : I : |- : ’
t | i :
: . : i ! t
: t
E END OF SORING @ ¢.Jm b ; : : :
I. {Free groundwater not encountered) E : : i i
E f ; , 1
E E i
[ r | | |
E LE | | |
dt E | | | |
, } | {
: : } ot !
t. r i !
- r I
[ L | | | | .
‘ C ' ! Ik -
} l- : | i
C ro
F E Poi |
E r j i yoy
r E ! i i oj, '
L C : : i : i t .
L : : pop | -
r . tos t i : , | '
f E Prod !
[ C _ 7 3 : :
- | ! : I
r E | : | : i .
- - | : ' t \ :
. ' i t i
l. x to ‘ :
- - ‘ : : -
- ! ! ! i
C : I- i i } i '
F ett tt ta
Page 41
u-
oa _ BORE HOLE No. 4 FIGURE 5
INCL WATION _MERTICAL Arete : _ . SNEET 10F}
Pent rer WAND AUGER are 7.7,1980 Prescct PROPOSED HOUSE, LOT 3 PARK ROAD
. ejct 3 [_gaasfrcanon nara | singin para OlneR
e leew Ep, eet Te z-T Pea am TEAS
2. 3 - yw °
STRATICASPHY y oeetn” ay > pare ig | 3 POLIS | sutspas
Er va] BlEee] Se) ssi gel Fy len! ches
spo" 28] £8 [278] 23 | 22/54 [ee [ES] Ore
. . —
SHtD (SP) : |
{ very loose, fine grained, t |
re aan
fi ty 1
- grading loose r | { J
L
L Lt i |
: |
E
t - | |
I" r ! i ' i
+ js! : ]
: i \ :
E ‘ ‘ | :
. r 3 | ‘
s grading moderately dense - : 4
: : - : ‘ \
r ; Do ;
E ; i 4
L 1 |
i
, : .
{ xD OF BORING @ 4m E .
, = . ! : .
(Fres groundwater not encountered) L i : : : 7
. L i 3 : :
t ; I tt
t .
t b
r E 3
[ .
i"
r c 4
I:
a r
L :
5 i. I
r -
E [:
r F 1
i r , :
r r pot
- | oy 7
E 1 | sb
" tC i | : |
EC It | : J
I : i 2 |
: Do a)
: ; ‘
L ' : . '
~ : ' | :
—_ ee L L Po wet LL - a a Lo t
— oT
Page 42
DYNAMIC CONE TEST RESULTS eee Depth Below Blows Per 0,3m Pénetration Groundsurface (m) ] 2 3 4 5 6 7 8 9 10 uv 12 13 14-7. 15 16 0 - 0.3 1 0 o 1 0 9 © 9 4 0 0 0 0 1 1 0 0.3 - 0.6 1 0 o 1 1 Oo 1 0 1 0 1 1 2 1 0 0.6 - 0.9 1 1 1 2] 1 o 1 4 1 7 3 2 2 4 2 0.9- 1.2 2 1 2 3°) » 1 1 9 1 oOon 2 1 4 3 1 12-1.5 3 39 3 5 3 } 3 3 6 3 4 4 3 ? 6 4 1.5 - 1.8 3 3 3 3 3 1 2 4 1 8 14 6 2 8 6 5 1.8- 2.1 6 3 2 3 6 2 § § 7 WB 4 5 5 10 6 5 2.0 - 2.4 12 3 5 5 10 3 8 7 VW 21 1901] 12 13 6 5 2.4 - 2.7 3 9 5 9-16 4 #12 7 12 22 2 . 1g 23 18 8 7 2.7 = 3.0 2) 15 1 9 2 #7 WwW 1 46 16-16 18 8 7 3.0- 3.3 9 WU 9 #17 #17 2 230s 26 n 8 3.3 - 3.6 15 (13 10 24 3000 6 - 3.9 7 i?) £8 22. Zz a op zu RO oo g —- @ “ “TS6T STE yoaew Q-X LONSddV 22109
Page 43
EXPLANATION OF NOTES, ABBREVIATIONS & TERMS USED ON BOREHOLE AND TEST PIT REPORTS DRILLING/EXCAVATION METHOD AS’ Auger Screwing RO Rotary blade or drag bit HQ Oiamond Core - 63 mm AD’ Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm “Vv V-Bit RAB Rotary Air Blast NQ Diamond Core - 47 mm °T TC-Bit, e.g. ADT RC Reverse Circulation BH Tractor Mounted Backhoe HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator OTC —Diatube Coring CT Cable Tool Rig EE Existing Excavation WB Washbore or Bailer JET = Jetting HAND Excavated by Hand Methods PENETRATION/EXCAVATION RESISTANCE L Low resistance. Rapid penetration possible with little effort from the equipment used. NM Medium resistance. Excavation/pessibie at an acceptable rate with moderate effart from the equipment used. H High resistance to penetration/excavation. Further penetration Is possible at a slow rate and requires. significant effort from the equipment. R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the digging implement or machine. These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of excavation or drilling toots, and the experience of the operator. WATER Mw Water tevel at date shown <j Partial water loss Cc Water inflow <4 Complete water loss GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling OBSERVED water, surface seepage or cave in of the boreholedest pit. GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be ENCOUNTERED present in less permeable strata. Inflow may have been observed had the boreholeftest pit been left open for a longer period. SAMPLING AND TESTING SPT Standard Penetration Test to AS1289.6.3.1-1993 4,7,11 N=1B 4,7,11 = Blows per 150mm. N= Blows per 300mm penetration following 150mm seating 30/80mm Where practical refusal occurs, the blows and penetration for that Intervat are reported RW Penetration occurred under the rod weight only HW Penetration occurred under the hammer and rod weight only HB Hammer double bouncing on anvil oS Disturbed sample BOS Bulk disturbed sample G Gas Sample Ww Water Sample FP Field permeability tast over section noted FV Field vane shear test expressed as uncorrected shoar strength s, PID Photoionisation Detector reading in ppm PM Pressuremeter test over section noted PP Pocket penetrometer test expressed as instrument reading in kPa U63 Thin watlied tube sample - number indicates nominat sample diameter in millimetres Ranking of Visually Observable Contamination and Odour (for specific soll contamination assessment projecis) R=0 No visible evidence of contamination R=A No non-natural odours identified R=1 Stight evidence of visible contamination R=8 Slight non-natural odours identified R=2 Visible contamination R=C Moderate non-natural odours identified R=3 Significant visible contamination R=0 Strong non-natural odours Identified ROCK CORE RECOVERY . TCR = Total Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%) __ Length of core recovered x 100 _ Length of cylindrical core recovered «100 = > Avil tengths of core > 100 mm 100 Length of core run Length of core run Length of core run GaP Form No. 6 RLS
Page 44
= METHOD OF SOIL DESCRIPTION Golder USED ON BOREHOLE AND TEST PIT REPORTS GRAPHIC LOG - TYPICAL SYMBOLS FOR SOILS -| CLAY (CL, CIOR Ch) ORGANIC SOILS GRAVEL (GP OR GW) (OL OR OH OR PY) . pF ‘.| SAND (SP OR SW) Os, COBBLES OR BOULDERS yy + °| SILT (ML OR MH) Combinations of these basic symbols may be uses to indicate mixed materials such as sandy clay. CLASSIFICATION AND INFERRED STRATIGRAPHY Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in AS1726 - 1993, Appendix A. The material properties are assessed in the field by visuattactile methods. Particle Size Plasticity Properties Major Division [Sub Division |Partcle Size © BOULDERS > 200 mm oH COBBLES 63 to 200 mm wom | ¢® “oy Coarse 20 to 63 mm # uw pk GRAVEL Mectium 16.0 to 20 mm 5 on £2 bai Fine 2.0 to 6.0 mm 2 Night Coarse 0.6 to 2.0 mm 3 SAND Medium 0.2 to 0.6 mm =z 10 | Ws eas Fine 0.075 to 0.2 mm SAE Core =e M_~ Looe bent tor sat SILT 10.002 to 0.075 mm a 0 10 20 30 40 50 60 70 80 CLAY < 0.002 mm Lquiel Litt (49 MOISTURE CONDITION AS1726 - 1993 Symbol Term Oescription D Dry Sands and gravels are free flowing. Clays & Silts may be brittle or friable and powdery. M Moist Soils are darker than in the dry condition & may feel coal. Sands and gravels tend to cohere. w Wet Soils exude free water. Sands and gravels tend to cohere. CONSISTENCY AND DENSITY AS1726 - 1993 Symbol Term Undrained Shear Symbot Term Density Index % SPT “N"# Strength VS Very Soft Oto 12 kPa VL Very Loose Less than 15 O0to4 Ss Soft 12 to 25 kPa L Loose 15 to 35 4to 10 F Firm 25 to 50 kPa MD | Medium Dense 35 to 65 10 to 30 st Stiff 50 to 100 kPa DB Dense 65 to 85 30 to 50 VSt Very Stiff 100 to 200 kPa vo Very Dense above 85 Above 50 H Hard above 200 kPa 4 SPT correlations are nol staled in AS1726 - 1993, and may be subject to corrections for overburden pressure and equipment type. In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour of the materia. GAP Form Ne 5 Ria
Page 45
Appendix B Reports of DCPs from 2003 Investigation
Page 46
Te
CF Solter..,
~—
REPORT OF DCP TESTS
CLIENT: Star Crest Pty Lid SHEET: 1 OF 1
PROJECT: House
LOCATION: 14 Park Road, Noosa CHECKED oveddl DATE: uy o3
JOB NO: 03682074
TESTED: PGH DATE: 26/2003 TEST: DCP 1 TESTED: PGH DATE: 2662003 TESTEO: PGH DATE: 26/2003 TEST: OCP 3
POSITION: POSTON: POSTION:
3p B| SURFACE RL: m GATYM: AHD1 SURFACE RL: m DATUM: AMDTI = @| SURFACE RI: m DATUM: AHO
B £ (A51289.6.3.2) Blows per 100 mm (AS1289.6.3.2) Blows per 100 mm & E {AS1269.6.3.2) Blows per 106 min
oElo 5 10 6 20 25 ° 5 Ww 15 oe} o 5 10 5 20 25
1 2 it 1 1 L 1 . L t i 1 2 L :
0544 os
4 4
19-4 w4
164 184
20-4 205
j q J
4 4 4
4 4 4
25-4 2s—4
04 104
a5 as
404 a4
4s 45-4
sa~ 505
as 35
6.04 so]
4 4
GAPS_1.GLB DCP PERTH CAPROGRAM FILESIGINTMOJEBZTT405P.GP2 GAPE 1.007 XO082003 16:84:50
This report of penetrometer must be read In conjunction with accompanying notes and abbreviations.
GAP gINT FN. FO4al
RL2)
Page 47
Preoite.
REPORT OF DCP TESTS
SHEET: 1 OF 1
CHECKED evd DATE:\|1103
CLIENT: Star Crest Ply Ltd
PROJECT: House
LOCATION: 14 Park Road, Noosa
JOB NO: 03682074
TESTED: PGH DATE: 2662009 TEST: DCP 4 TESTED: PGH QATE: 2676/2003 EST: DCPS
POSITION: POSTION:
2F SURFACE RL: m DATUM: AHO! =F SURFACE RL: rm DATUM: AHD71
Be 4AS1289.6.3.2) Blows per 100 mm % i {AS1289,6.2.2) Blows per 100mm
BElo 5 10 1S Po) oElo 5 10 Ss 20 28
L 1 1 L . t 1 1 ‘ L 5
4 4
0.5 054
194 (0-4
184 1s]
24 zo
25-4 254
4 4
4 4
30 30-4
] ]
35-4 354
aa—4 4a
4.5—~4 —|
4 4
4 4
4 4
50 5044
55-4 554
6.0] 60-4
GAPS_1.GL0 GCP PERTH CAPROGRAM FRESONTWOIBIQU74DCP.GAJ GAPS SANT SOKWZ003 15:487
This report of penetrometer musi be read in conjunction with acoompanying notes and abixsviations.
GAP gINT FN. Fda
RL2
Page 48
Appendix C Construction Management Plan — Tod Noosa Consulting Engineers
Page 49
ef 7 ,
Jf - | !
. f yf ] s a 7 Rpisex6e “Surveyors e |
“ eSiota
%,
rn se on
cos
14
RPSENE
MAX. WATTERSON
& ASSOCIATES
a iegle Kteeet
oa
iB a
Im an se
os Sn oe
lena nraurveraanme tonne
tm Star CREST
1 PTY LTD.
S|
LAN SHOWING
beTAILS OF LOT 3
IN RPi22368,
eae
carn mace
Soe" em. cove wr
| anerary semma Heat
4
sates | nant
rr
owt DET Reh
cat ints ms OOAIGIE
<ot
ee mm
ee ee em
Cet
~~ NOTES
( Area of tandsiiplerosion wa Gray Us oun
SITE PLAN
: Breer: Ow cw, | zone
Associates (>= | aah
nN x
L______1 Section tino (Ref Figure 2f =
12m ]a3
07682118
a =
Page 50
Biers moweraone . 35 ' 20 Pio* SLOWS00mm a2 so iL fee be ocp2 LOWS A00mm: 1 20 30 Los BHt 40 BLOWS/100mm so Pit © sLowsnoomy “1 5 * 20: A. 2 8 . P tro 4.04 sa aw rr SECTION A-A 10 ae “ “8 4 RESULTS FROM PREVIOUS INVESTIGATION : PROPQSED HOUSE DEVELOPMENT [o.; vo > GOLDER ASSOCIATES Park ROAD, NOOSA Dug No bosmposs! Fig cone ernern ov tra eons TON THRCUGT ceaPE [Sate 1100 2 . ICATING DCP RESULTS [ose 08-03-90
Page 51
PI
DCPIZ sLowsnaoma
BLOWS/00m, — ery
3
“
!
1
it. |
Lao
{ .
pre
‘SLOWS/00mm
te 40.
ocPia
10 ae Las
BLOWS/00mm
Pa me
BLOWS/100rra
“| ”
20
1
A “ :
. | ** SECTION B-B
# RESULTS FROM PREVIOUS NVESTIGATION.
PROPOSED HOUSE DEVELOPMENT |Owg No sesgosc-3 Fig
GOLDER ASSOCIATES PARK ROAD, NOOSA Sule 1100
ene aCe at teen SECTION THROUGH SLOPE. ~ 3
TING DCP RESULTS: Date 98-03-90
Page 52
bas DCPS BLOWS/100mm Beso 30 p2e pers | | fro BLOWS/OOmm BLOWS/ODm—n Lr ‘ a2 « Loose sano Les to. sepa te cro oce4 BLOWS/100mn ary SECTION C-c 10 SECTION C-C Ls EB 3 © RESULTS FROM PREVIOUS INVESTIGATION. t : PROROSED HOUSE DEVELOPMENT [ow Nesocaocs—« 2 GOLDER ASSOCIATES PARK ROAD, NOasA ae ; seine oto ne eee teat SECTION THROUGH SLOPE 3 f WOKCATING DCP RESULTS Oste O6-05-90
Page 53
oce7 BLOWS /t00mm po 10 as 1 ocr BLOWSN00mm 10 % 20 x0 pera BLOWS/00Mmn 2. 1° i 20 “0 1d foo 0. SECTION O-D : 3 1 PROPOSED HOUSE DEVI MENT -! i GOLDER ASSOCIATES PARK ROAD, NOOSA, Bug He noessore-s! Fig Smcenmincanamencoca | gebtiN weud cece [Skate 12100 5 TING DOP RESULTS: Qute 08-03-90
Page 54
orSS5% ALAN BECCONSALL & ASSOCIATES PTY LTD. PROJECT MANAGEMENT & ENGINEERING CONSULTANT 3 Chermside Street NEW 4 RECEIVED STEAD aL FORTITUDE VALLEY BC QLD 4006 2 APR 2008 Phone: (07) 3852 3880 Alliance Design Group P/L Fax: (07) 3852 3882 Email: [email protected] 1% April 2008 Alliance Consulting Engineers PO Box 208 SOUTHPORT BC QLD 4215 Attention: Gary Bachelor Dear Gary, 14 Park Road, Noosa Property Easements Attached are copies of documentation for Easements A, B and C for reference in your design of services and vehicular access for the above project. Yours faithfully, Ponsa Alan Becconsall Cc: Philip Gough L GB Alliance ~ 01.04.08 Property Easements
Page 55
. CURRENT TITLE SEARCH NATURAL RESOURCES & MINES, QUEENSLAND Request No: 115808455 Search Date: 05/04/2006 10:57 am Title Reference: 16993110 * Date Created: 14/01/1987 Previous Title: 15891054 15891055 15891056 REGISTERED OWNER Dealing No: 700422938 23/12/1994 STAR CREST PTY LTD A.C.N. 009 968 647 ESTATE AND LAND Estate in Fee Simple LOT 3 REGISTERED PLAN 122368 County of MARCH Parish of WEYBA Local Government: NOOSA SHIRE BASEMENTS, ENCUMBRANCES AND INTERESTS 1. Rights and interests reserved to the Crown by Deed of Grant No. 10627160 (ALLOT 2) Deed of Grant No. 10802241 (aLLor 12) Deed of Grant No. 10804108 (aLLoT 3) 2. EASEMENT No 709353534 09/02/2006 at 14:52 benefiting the land over EASEMENTS A AND B ON SP177654 ADMINISTRATIVE ADVICES Dealing Type Lodgement Date Status 709370034 SETTLMNT NTC 16/02/2006 11:08 CURRENT UNREGISTERED DEALINGS - NIL CERTIFICATE OF TITLE ISSUED - No Caution - Charges do not necessarily appear in order of priority ** End of Current Title Search +* COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES & MINES) [2006] Page 1/1 PRINTED BY LAWPOINT ON CS APR 2006 aT 10:57am FOR JAQ REF JAQ:68554
Page 56
BIEI/Z0.
SP177654 VO REGISTERED Recorded Date 09/02/2006 14:50 Page 1 of 2 Nol To Scale
ops Bl) ee
P35 8 lo] Beet
e99/ > 4) == 1
ass g 29 reo | szo90e | soceusi’e | (proreindaio |Z & == 0
adé ? co 92279 | etl! Zeae2IST G1 MOLE O g Q a ~~
© 0+ | .95260! B9EZeISY (Px? Pind dtio | 9 ain 4 N
é e202 | Ste9R scigesi, | euapayuaenso | & as 2a
£660 65088 | ISG2LIdu/e | (PHOFPIN GO | F Be r
(P1419 8 BIN) “a = oO le
x bors | £20981 LO5991St HY MELE O 2 E = §
2699 | sroEG | Zé699/ST OH UF LON'D 7 a.|2| =o |e
A e 9960 | Sees! | eoczmni/e | (PHIORPINdID | 1 ¥ é 3
N 2 £9 isa onnnvaa_|_ uo a 4158 &
N = & SHV SONTEZI
7] g
& Zperzist é. :
& > tw g
>
(98LLtcht 1 3
vRwz u ad q
-s) gO ® §
ale aos Ss 8
CSE (ese) % 7 4 N\ 3
Le g % w
2 eM GQ #
= 4
» & SNe
i wSis 8
i f 4
2 L66991St 3} 5 8
a SEL96SI ond 4 § Q
g gl6ZSdu is g RX S
ty ~ g
4 &
G9 , < aE
4 g ig e
yy >
9 if BS
DrLloOL2 6 ADVERSE, 7 zB g
Zon SEH ‘ A = 3
2Ugg V LWI 4 o 3
i 91292 2s
(eeser) 08 ¥ ta a shee g
Ro Lee or faba
oe (2-6) Ls § SR Bee 6 Speer § :
i ghee EE 8 Bats \,
BUSS Fe AOULS BBessiy \yit
S STAST IOVS WHNLYN Brees NG
2 af EE EE iB
i Wun SS iq
¥ BY DORDTS JO AERA APORTUOS WT BOOTS TON BREE QE
ooo | escezist | (uveg #en) RdO-s fragese Ni
§ ® Beeb! RaS BT UOROIS FO GAH Uf PEIOPI TON gacerea
3 ’ x ONIEWIE | NPORIO Md 7 WeDIS JO TOAD) Uf PODOFA TON ERT i gs
ti eS / $ SOW LNINVNIS 5 euea8 os
RES 5 BReERe cor
a5 ade See a eo + wo 8 8 HW a Oo @ 9 F 2 0 2 anih =
pos f T T T T T T T T T T T T T Tererrrery Eee 3B “
3 FSi IGHV7TTY FDU TOR OF FUbjey Wy PayaNeeT STV FF “BaZ{OW U] 820 SYyy6uET — OOF ‘| B1D9S a5E ais z
$219 Ge (20) — “OOSS¥ 7 NOSHALL VM X¥Fi
@ @
Copyright protects the plan/s being ordered by you. Unauthorised repraduction or amendments are not permitted.
Page 57
a LAND TITLE ACT 1994 REGISTRATION CONFIRMATION STATEMENT NATURAL RESOURCES AND WATER, QUEENSLAND Title Reference : 16993110 This is the current status of the title as at 14:10 on 06/02/2008 REGISTERED OWNER Dealing No: 709600061 17/05/2006 STEPHEN TIMOTHY BIGGS ESTATE AND LAND Estate in Fee Simple LoT 3 REGISTERED PLAN 122368 County of MARCH Parish of WEYBA Local Government: NOOSA SHIRE EASEMENTS, ENCUMBRANCES AND INTERESTS 1. Rights and interests reserved to the Crown by Deed of Grant No. 10627160 (ALLOT 2) Deed of Grant No. 10802241 (ALLOT 12) Deed of Grant No. 10804108 (ALLOT 3) 2, EASEMENT No 709353534 09/02/2006 at 14:52 benefiting the land over EASEMENTS A AND B ON SP177654 3. MORTGAGE No 709600062 17/05/2006 at 11:39 BANK OF QUEENSLAND LIMITED A.B.N. 32 009 656 740 4. EASEMENT No 711397151 05/02/2008 at 11:28 benefiting the land over EASEMENT C ON SP196693 ADMINISTRATIVE ADVICES - NIL UNREGISTERED DEALINGS - NIL CERTIFICATE OF TITLE ISSUED - No DEALINGS REGISTERED 711397151 EASEMENT Caution - Charges do not necessarily appear in order of priority ** End of Confirmation Statement ** M G Locke Registrar of Titles and Registrar of Water Allocations Lodgement No: 2456329 Email: [email protected] HOME WILKINSON LOWRY Office: BRISBANE Box: 088 Page 1/1
Page 58
Land Titts Act 1994; Land Act
+ +f Form 2t Version 2 .
66
RPS298
SURVEY PLAN
SS
so°o’”
168
OSS
Sheet} of
1j1
z
“
2
42
i
40
1
8
8
co =
_— &
5 LD) O83 e|°
3 N38 3
in BE 246
© 2" 3
I c
| ac S46
'
87°
| od,
9
= &
<BS | do
vs
EER 4
8s | a
| |.
jo 1 1 1 _S0ime td 4 1100 }nen__ 14 {150mm State copyright reserved.
\ Mandell Leatle WATTERSON hereby certify thot hove made this
pion \t to the Survay and Mapping Intrestructure Act 2003
tnd Surveyors Act 2003 aré aooocloted Regufationa and
Standards and that the plon {9 accurate, and camped trom
SPI77854 m the Department of Notural Resources and Water.
MAX WATTERSON & ASSOC, ~ (07) 5442 SIZE
ote 15/8/07, Soseere Sewers
Plan of EMT . Cc
in Lot 65 on RP529/8
PARISH: WEYBA
county: March
Seale; 1:100
Format: STANDARD
et
SP 19669
Plan Status:
Meridian: Vide SPI77654
| F's: No
Page 59
DEVELOPMENT PROGRAMME Project: 14 Park Rd, Noosa Date Amended: 2/12/07 Date Printed: 2 Dec, 2007 Revision: 'b’ Activity Name OPERATIONAL WORKS Appoint Consultants Operational Works - Submission Operational Works - Approval BUILDING DESIGN — Architect Civil Engineer Structural Engineer Hydraulic Engineer - Ops Wks Hydraulic Engineer - Bui Landscaping BUILDING APPROVALS Council Plumbing Private Certifer CONSTRUCTION Driveway & Foundations Buitding Jan '08 Feb ‘08 Mar '08 317 14 21°28 4 11,16125° 3°10 17 24°31. Apr '08 May ‘08 1 7 14°21 285 12'19 2 2 9 16 Jun ‘08 23 30 7 Jut ‘08 Aug ‘08 14.21°28 4 41 18/2574, ep ‘ Construction -: 4 . , Tender [8,9 !10l14/12 13144 7 1 Tel tel i7 18119 20'21[22 23°24 °25 26 27128 29 30 31.32 33 34 35 36! Ref. \Pct\my documents\AB&A Projects (CURRENT)\14 Park Road Pgm Rev ‘b' - 02.12.07 ad Page: 1 of 2
Page 60
Document Register / Transmittal 2 = Project 14 Park Road, Noosa Heads . z Alliance i 5 Cansuvtting Engineers 3 Client Mr ST Biggs innovative Sotutions = ProjectNo O7559. SOLO COAL ~ seisantt © KUALA LUMPUR © AEL DnB! + }ONDOY Sheet (ia] GOLD COAST The documents listed below are issued for your use as indicated in the issue details. 3/22 Marine Parade Southport Old PO Box 208 Southport BC Otd 4215. All revisions supersede any previous revision of the sama document T +6175528 1855 F +61755284723 You are responsible for control of these documents within your organisation. E info@atitancedesigncomau Wo wew.alliancedesign.comau s Issue Date 3 Day] 25.28! 14/14] 94/151 45 | ' 3 Month [03] 03 04] 04] 04] 04[ 04 LL. TET ¢ Year | 08! 08; 08] 08] 08| o8| 08 i g Document No Document Title Revision 3 $01 and Construction Notes S02 Sos Plan $04 S05) S06 Framing Plans DRAWING SCHEDULE & LOCALITY PLAN cor [STORMWATER MANAGEMENT PLAN . Coz ISTORMWATER MANAGEMENT PLAN & LONGITUDINAL SECTION SEDIMENT & EROSION CONTROL PLAN & DETAILS Distibution Number of Copies Ajan Becconsall & Associates Pr i 1 4 |: Thomson Adsett Gough 1! 1 Wo Sunshine Coast Regional Council (Tewantin Office) S Mr Stephen Biggs . ay 1 Neit Blair Associates ‘ ttt ft + pte tt Details Purpose X-As Consiructed C-Construction T-Tender A-Approval_|-Information_P-Preliminary Medium P-Print D-Dise Format D-Owg P-Pdf T-Pit_F-Dwt Method D-Deliver P-Pickup C-Courier M-Mail F-Fax | | | | | : | E-Email_U-Upload L m |xjo] 0 =z jolvl > Issued By 1 1 Z alaiag | o|o | (for and on behalf of Alliance Design Group} [58/818 818 Ltt | Fitename: 07559_YYMMOD_01_TRANSMITTAL xis Page 1
Page 61
14PARK ROAD NOOSAHEADS | RESIDENTIAL DEVELOPMENT = a i s1GgS DRAWING SCHEDULE (_ DRAWING No. DRAWING TITLE ) 07559-C00 DRAWING SCHEDULE & LOCALITY PLAN 07559-C01 STORMWATER MANAGEMENT PLAN 07559-C02 STORMWATER MANAGEMENT PLAN & LONGITUDINAL SECTION e 07559-C03 SEDIMENT & EROSION CONTROL DETAILS & NOTES PROPERTY DESCRIPTION: 14 PARK ROAD NOOSA HEADS 4567 LOT 3 ON RP122368 & LOT 65 ON RP52918 LOCALITY PLAN NAME AMENDED. LOCALITY PLAN AMENDED NAME AMENDED THROUGHOUT DRAWING SET FOR OPW APPROVAL 03 [28 03.08 /issueo FOR APPROVAL \vo | ose Amenoment J Amance Dengn Group Pry Ud 3/22 Marine Parade Sourtport Od 4215, Te a5 FOU? S528 4723 eres scermereaeT ES Ean ABM17 RY 11307R AON OW 119 178 Poms RESIDENTIAL DEVELOPMENT Alliance 16 PARK ROAD NOOSA Consurting Engineers | ‘Approved far Congruction 7) (Nis "07559 [too [omawne SCHEDULE & LOCALITY PLAN | Cc) C
Page 62
&
art a
Lat
ifct
BM NAIL IN BIT
30°00’
RL 98054
FL 40.24
14
A sges ~RP52918
L 4949
INCOMING PIPEWORK TO HYDRAULIC
MA X, ENGINEER'S SPECIFICATION.
REFER DETAIL 1 FOR
STILLNG CHAMBER DETAILS (Derived From Réecnattion
shown on KimmorleyaSyrve ying
dwg05065-B) Oo
RPS2918
150, 150,
DECK LEVELS
4233 LOWER
4513 UPPER
Ey :
i. >
3:1 SAND: CEMENT
MORTAR
450/150) t40) 160 150
150,150,140, 160 , 150,150,
+
450) 450
900.
STORMWATER MANAGEMENT PLAN
‘ALE 1:10
|S _ STRUCTURAL SCALE 10 wor? 3 ks
CONCRETE N25 SME). MU
@i00 ROCKER PIPE
‘600 max. LENGTH
600 mox. LENGTH
I
fet @100 ROCKER PIPE
50
al @100 ROCKER pe |
600 max. LENGTH 5050
DETAIL 1 — STILLING CHAMBER SECTION ‘A’
SCALE: 1:20
SCALE: 1:20
LEGEND
30-——————. EXISTING CONTOURS
——$w—— - -- EXISTING STORMWATER
—_—— $3 - EXISTING SEWER
mcm PROPOSED STORMWATER
mmc Jemme PROPOSED STORMWATER MANHOLE
mecmmccum 8 PROPOSED STILLING CHAMBER
(INTERNAL DROP}
_/
if
L
(GENERAL NOTES:
THIS DRAWING IS BASED ON MORQ STUDIO DRAWING
No. 9404/A2.04/1 & MAX WATTERSON & ASSOCIATES
DRAWING No. 02-1318 & 02-1318BA.
JHERE (S TO BE NO UNCONTROLLED DISCHARGE OF
WATER ONTO SLOPE.
STRIPPING VEGETATION FOR CONSTRUCTION PURPOSES
SHOULD BE MINMISED, IF VEGETATION IS DESTROYED IT
SHOULO BE REINSTATED IMMEDIATELY AFTER
CONSTRUCTION IS COMPLETEO.
ADDITIONAL LOAD DUE TO FILL, CONSTRUCTION
EQUIPMENT OR STOCKPILED MATERIALS SHOULD NOT
BE LOCATEO ON THE DUNE SLOPE.
THE USE OF VIBRATORY EQUIPMENT OF ANY KIND IS
NOT PERMITTED TO BE USED, INCLUDING VIBRATING
ROLLERS, THE USE OF VIBRATING INSTALLATION
TECHNIQUES FOR SHEET PILING & OTHER
CONSTRUCTION VIBRATIONS CAUSED BY EXCAVATING,
EARTHMOVING OR DEMOLITION MACHINERY OR OTHER
SIMILAR CONSTRUCTION TECHNIQUES.
THE CONSTRUCTION MANAGEMENT PLAN !S TO BE
ADHERED TO.
COPIES OF ALL INSPECTION REPORTS BY ENGINEERS
ARE TO BE SUBMITTED TO COUNCIL WITHIN 5 BUSINESS
DAYS OF THE INSPECTION TAKING PLACE.
THE GEOTACHNICAL ENGINEER WILL BE REQUIRED TO
BE ON SITE FOR THE WHOLE OF THE TIME DURING ANY
EXCAVATION. SUCH WORKS SHALL ONLY BE CARRIED
QUT DURING ORY WEATHER CONDITIONS & IF THERE IS
A RISK OF SAND MOVEMENT OCCURING, ALL WORK
SHALL BE SUSPENDED UNTIL SUCH STEPS, APPROVED
BY THE GEOTECHNICAL ENGINEER & THE COUNCIL'S
BUILDING SURVEYOR, HAVE BEEN TAKEN TO ENSURE
THAT NO FURTHER SLIPPAGE WiLL RESULT.
ANY DAMAGE CAUSED TO ANY PUBLIC UTILITY DURING
THE COURSE OF CONSTRUCTION SHALL BE REPAIRED
TO COUNCIL'S STANDAROS & AT NO COST TO
COUNCIL.
ANY ALTERATION OF ANY PUBLIC UTILITY OR OTHER
FACILITIES NECESSITATED BY THE DEVELOPMENT OF
THE LAND OR ASSOCIATED CONSTRUCTION WORKS
EXTERNAL TO THE SITE SHALL BE AT NO COST To
COUNCIL.
. THE TRANSPORTATION OF ALL MATERIALS TO & FROM
THE SITE SHALL BE UNDERTAKEN IN A MANOR SUCH
THAT NO PARTICLE MATTER ESCAPES ONTO A PUBLIC
ROAD. ALL VEHICLES CARRYING MATERIALS EITHER TO
OR FROM THE SITE SHALL BE COVERED TO PREVENT
MATERIALS INCLUDING DUST SEING WINDBLOWN FROM
THE VEHICLE.
‘
~
commGHT ‘Aare Deer Grow ry as xz (o" mr ST Biggs )
3722 manne Pate Susp 88 15
15.04.08
CLIENT NAME AMENDED, EASEMENT BGUNDARYS SHOWN
te 0% 08
STORMWATER LINE AMENDED, PIT U2 REMOVED
10% OB
rece nerrenensocnes | | EPS SS OTE :
ioceennnice | | |menmeerne: Alliance [ 1h PARK ROAD NOOSA
ISSUEO FOR OPW APPROVAL
2803 08)
STORMWATER MANAGEMENT PLAN
[ISSUED FOR APPROVAL ortatonceoengricom.
filePer
Ome
2/0 Hovence Suess Newstead O18 1008
ORs Sos) e330. # 817 3257 SRE Consuicing Engineers
oa Gece Aer Tor Cons oo
6B GM
Vans Cr
_,
= 2
pmenamene Dt aro Caniteanon creapare AEN 17 098 113078 ALN 099 193 7
rater
Wa
Ane
“RS SHOWN “at | 07559 | “"t01 | LY
Page 63
ACCESS CHAMBER No. NOTE. (Cover CLass } J | ©GSTING HARHOLE L] 300¢ia REP STORMWATER CHAMBER SIZE Vertical Geometry Grade % Vertical Grade length m Pipe Size & Type Property Vacinity DATUM 4.000 f/ 50%) wasextoo [a] 7D) simu weet GREFER OETAK 1 07559-(00 90% CE OF RETAINING WALL/#150 WATER MAIN EDGE OF GITUMEN/ENERGEX LOW VOLTAGE CONDUIT 9225 AC SEWER oH ia [a 1.0m W.0m JOOSNB_ PVE PRIVAT ROAD RESERVE PROPERTY FOR EXISTING MANHOLE, STORMWATER MAIN WILL OROP IN FROM HIGHER INVERT LEVEL. FOR DETAILS REFER WATER SERVICES AUST. SEW-1306. STORMWATER NOTES: 1, ALL WORK SHALL GE IN ACCOROANCE WITH MAIN ROADS STANDARD SPECIFICATION MRS 11.03 & MRS 11.04. WHERE A SPECIFICATION CLAUSE REFERS TO AN ANNEXURE REFERENCE SHOULD BE MADE 10 THE CONTRACT ORAWINGS & IF NECCESSARY CLARIFICATION SOUGHT IN WRITING FROM THE SUPERINTENDANT. 2. PRIOR TO EXCAVATION OF DRAINAGE TRENCHES TOPSOIL SHALL BE NAT. SURFACE ON lo lo lo lo In o clo STRIPPED & SET ASSIDE FOR REUSE IN ACCORDANCE WITH CLAUSE 8/8 8 |F |S 2 8] Sle |x WRS 11.04-9, PIPE CENTRELINE S lz jo lx le a so! sie 2 3. ORAINAGE TRENCHES SHALL BE EXCAVATED IN ACCORDANCE WITH e\jeie = S| Sle |e CLAUSE MRS 11.044, & SUNSHINE COAST REGIONAL COUNCIL STANDARD DRAWING IPHEAQ D-O030-C TYPE 1. THE MINIMUM WIDTH DEPTH TO INVERT gelele le e 2 OF THE SIDE SUPPORT DIMENSION ‘A’ SHALL BE 100mm. THE BEDDING Sis is |e 3 3 DEPTH DIMENSION 'B SHALL BE 100mm, IF REQUIRED. sls le |s 3 S 4, ORAINAGE PIPES SHALL BE 100mm INTERNAL DIAMETER uPVC IN ACCORDANCE WITH ASI260 INSTALLED IN ACCORDANCE WITH AS2032. DESIGN LEVELS ON |e |e |e jg Is g e| o 8. SAND TRENCH BACKFILL SHALL BE COMPACTED BY FLOODING Se |S js ts = =| (07559-CO1 GENERAL NOTES No. 2 & 5) TO 90% MOD. PIPE INVERT je |e |e ie je o ele 6. STORMWATER TRENCHES SHALL BE REINSTATED IN ACCORDANCE WITH JHE SEDIMENT & EROSION CONTROL PLAN 07559-CO3. 2 | 2] of 2 CHAINAGE 8 ls je |s |g g 3] S| 2] 2 Se [ea fe [on 2 S| ec} ol 8.4 BS SMALE} WV IAD S SCALED: WOH IAL C Va or “ a (“" Mr ST Bi Le Des Group Py a ggs <Tisee 08 [event want aninoeD soe | eee DD ee ccanea | | BZ tee tory 15 Tei STORMWATER MANAGEMENT PLAN (04.08|S TORMWATER LONGSEC TION AMENDED 10 SUT, PIT 1/2 REMOVED mon. |x renee iccagia | |ruecorascapeaney Allian e RESIDENTIAL O£ VELOPMENT GITUDINAL SECTION ‘a_[vi06.08 |issupe FOR OPw APPROVAL jee oe eS Fae creel mnss orn || 2/22 Porence Sever Newsead On 4006 Cc 14 PARK ROAD NOOSA LONGI Se RSSEO LOR area vaL om | poor penton mcerperen Songer tsa Fanvare aan Consulting Engineers ~ Conan Deaher Betigned Checked Reproved tor Consinadion Tae Srecisae | Project Ne Drawing No Amat oo Jt ——_— | | EEE | (erence nema sawed) OR ss an Dd Gis [ar [isso ton)
Page 64
RL 9.805,
BM NAIL IN BIT
66
RP52918
RP52918
SERVICES INSTALLED UNDER EXISTING DRIVEWAY BY DIRECTIONAL DRILLING
Kp e S
SERRE RRS
IPR ORS
oe EER Pg RRP x
y HCB L&, g IRE a —
We 1685S IU Oo ete
SL17 74 S oY,
{Derived From Ikrgprmakion 1
shown on Kimnorl os Irveying
alwg05065 - BD 9
” t
Qi, PROP. CONCRETE ORIVEWAY EXIST. CONCRETE ORIVEWAY
SS, FOR ORIVEWAY DETAILS
REFER STRUCTURAL
30.5 ORAWINGS
yO
y 4 1
NOTE: So 65
STOCK PILE SPOIL ON UPSIDE OF TRENCH Pd
"peck Levels RP52918
2 4233 LOWER
45.13 UPPER
.,
SCALE: 1:125 RPSE9IE
tt 8 plan 1; 125 (Ar)
r
GENERAL_NOTES:
1. THIS ORAWING IS BASED ON WATTERSON & ASSOCIATES DRAWING No. 02-1318 & 2,
02-1318BA. ye SS E tA _ oe RPI77 > 7 ~
SEDIMENT MANAGEMENT NOTES: / m RP17755
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE INSTTUTION OF ENGINEERS AUSTRALIA
{QUEENSLAND DIMSION) SOIL EROSION & SEDIMENT CONTROL - ENGINEERING ‘7
GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES JUNE 1996. ( T FENCES: \ | LEGEND )
2. THERE IS TO BE NO UNCONTROLLED DISCHARGE OF WATER ONTO THE SLOPE. SEDIMEN NCES:
3. STRIPPING OF VEGETATION FOR CONSTRUCTION PURPOSES SHOULD BE MINIMISED. IF TH 30 ———~ EXISTING CONTOURS
VEGETATION 1S OESTROYED IT SHOULD GE REINSTATED IMMEDIATELY AFTER ‘ ee One UNOS SRADARD DRAWN IPREAO a etOn CE WATH SUNSHINE
CONSTRUCTION IS COMPLETED, . S¥——— EXISTING STORMWATER
4. STOCK PILED MATERIALS SHOULD NOT BE LOCATED ON THE OUNE SLOPE. ALL STOCK MULCHING: i
PILES INCLUDING SAND/ SOIL BUILDING MATERIALS SHALL BE CONTAINED WITHIN eeu F we EXISTING WATER
PILE DUAL ernment CARERS TERIAL o 1. SERVICE TRENCHES SHALL BE TOPSOLED & REVEGETATED IMMEDIATELY AFTER THE e
5, THE CONSTRUCTION MANAGEMENT PLAN IS TO BE ADHERED 10. TRENCH IS BACKFILLED. THE FINAL 100-150mm OF TOPSOIL SHALL BE UNCOMPACTED Ys mmm mem mes PROPOSED STORMWATER TRENCH/SEWER
6. THE TRANSPORTATION OF ALL MATERIALS TO AND FROM THE SITE SHALL BE & LEFT ROUGHENED & UNDULATING ,
UNDERTAKEN IN A MANNER SUCH THAT NO PARTICLE MATTER ESCAPES ONTO A 2, MULCH REINFORCED BY COVERING WITH A FINE GEOSYNTHETIC NETTING OR SPRAYING meme PROPOSED SEDIMENT FENCE
PUBLIC ROAD. ALL VEHICLES CARRYING MATERIALS EITHER TO OR FROM THE SITE WITH HYDRO MULCH TACKIFIERS. (50% GUAR 50% PVA MIX APPLIED AT A RATE OF
SHALL BE COVERED TO PREVENT MATERIALS INCLUDING DUST BEING WNDBLOWN FRON 2kg/100msq. TO 65~80kq/100msq. ORGANIC MATERIAL) SHALL BE PLACEO ACROSS | ——s———s— PROPOSED WATER (TO HYDRAULIC ENGINEERS SPEC)
THE VEHICLE. THE DISTURBED AREA TO PREVENT RUNOFF & RAIN DROP IMPACT FROM REMOVING
7. SITE DISTURBANCE SHALL BE LIMITED TO BUILDING AREAS, THEIR SURROUNDS & THE FRESHLY PLACED TOPSOIL. MULCH SHOULD BE SPREAD EVENLY WITH A MAX. 2 —e— PROPOSED READY TAP (TO HYDRAULIC ENGINEER'S SPEC)
OTHER USE AREAS. DEPTH OF SOmm.
8 TEMPORARY OR PERMANENT DOWN PIPES SHALL BE CONNECTED TO THE STORMWATER 3. ALTERNATIVES TO MULCHING SUCH AS THE APPLICATION OF PROPRIETARY EROSION E PROPOSED ELECTRICAL (TO ELECTRICAL ENGINEER'S SPEC)
SYSTEM BEFORE LAYING THE ROOF OR LOCALISED EROSION AVOIDED BY DIRECTING CONTROL MATTING, HYDRO MULCHING OR TURFING MAY BE PERMITTED AT THE 1 .
FLOW FROM DOWN PIPES TO NON EROSIVE AREAS. DISCRETION OF THE SUPERINTENDANT. ——!———— PROPOSED TELSTRA (TO ELETRICAL ENGINEER'S SPEC)
TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT KERB INLET SEDIMENT TRAPS: RRRRRY eroroseo TEMPORARY SHAKEDOWN
TRAP: 1. KERG INLET SEDIMENT TRAPS IN ACCORDANCE WITH SUNSHINE COAST REGIONAL {LS ] PROPOSED DRIVEWAY
1 IME ConstRuCTION BNTRY/ENIT SHAKEOOWH AREA SHALL BE CONSTRUCTED 4 COUNCIL'S STANDARD DRAWNG (PWEAQ D-OO4IA SHALL BE APPLIED 10 KER INLETS =
. IN THE IMMEDIATE MONITY OF THE SITE.
MAINTAINED IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL'S STANDARD SSS soit ov UPHILL SIDE OF TRENCH
DRAWING IPWEAO D-O040A. ALTERNATIVE 1, ALTERNATIVE 2 (S NOT SUITABLE OUE 70 tT) _=] EXISTING ORIVEWAY
\_THE NEED TO CONTROL VIBRATION FROM THE PASSAGE OF PLANT. ) SD - )
= ie
Nine -epoEpoNATOs ) Zz (Me ST Bi 5
copvecer parce Deagn Geo Pry ad ggs T I NTR
C 406 OS CLIENT NAME AMENDED. EASEMENT BOUNDARYS SHOWN = Sores < = « tre. ae < 3/21 Monee Pate Souter OAS . Propect RESIDENTIAL DEVELOPMENT SEDIMEN AND EROS ON ca OL
B_|%,06.08) TRENCH SIZE AMENDED wane: | 7008 farceOuproustyuctee | |e en, ‘ Alliance ‘ DETAILS AND NOTES
‘A |i104 06 SUED FOR OPW APPROVAL -— povanters4 ineresccn | SO Time | Comsuiting Eaguncers 14 PARK ROAD NOOSA
Dv {78.03 08 )SSUED FOR APPROVAL ae: | 7an308 Raaccosig on hy ieocoans | | DUbRreEcCg came . . 3) ee Deaped cn] ‘Approved tex Conainaean Tame treaia | Proed Ne No eae
Kno | one Arnone De PEG CERTACATION DAN CORTE ABes 17 OFF 1HRO7E ACK ONT 113 178 rroaunescanore 3) (LM GB GM i AS SHOWN Al [ 07559 | ( 03 | c)
Page 65
| DEVEL ENT FEES & CONTRIBUTIONS
S U N S h | n e Coa st (Cashier: Please Retum to Admin Officer, Development) ®
Regional Council. ___
a RECEIPT TYPE .
540 ”
541
542
543
544
588
i PE |
AMOUNT
BONDS - Bond Refund Details
Payee Name:
Address:
“Application Fees
Road / Drainage Pian Exam
Road / Drainage Field Inspection
Lega! Document Examination
Sealing Fee - Survey Plans, Legal Documents
Sale of Documents, Policy Lists, Misc
Bonding Admin Fee (Contributions, uncompleted works)
Closed Circuit TV Inspection
Pre-lodgement Meeting Fee
SCONTRIBUTIONS a
Developer Contribution - Landscaping — -
Lot Calculation
APPLICATION AND GENERAL FEES |
Plan Examination Calculation
|
|
i
|
i
Inspection Calculation
Address:
. ENS Roan St
Basgave
Developer Contribution - Road Other than PSP 53
Developer Contribution - Pathway Other than PSP 685
Developer Contrib. — In Lieu Off St Parking (PSP13 Car parking) ee
(CS - Community Land (Not currently active) | 500s _
ICS Pablo Transpo es
Road/Section:
ICS - Sewerage (PSP Coastal) } 8
ICS ~ Sewerage ~ South Peregian (PSP Maroochy) | 881 TAPPLICATION DETAILS al
PY ~
ICS — Sport and Recreation Land (PSP Parks)
ICS ~ Drainage (PSP Noosaville Master & Ward Street)
ICS - Road (CMRNICP) If BA not entered then use 594
Developer Contribution - Drainage Other than PSP 554
Developer Contribution - Other Parks and Community | 80s ROADWORKS CONTRIBUTIONS _
ICS - Sewerage (PSP Rural)
iCS — Water Supply (PSP)
ICS - Pathway (PSP)
Development Location:
_| RECEIPT TYPE
File Numbers or Reference:
lk. Zoo g-. BDIUG. |
Date application properly made:
Receipt Nor O9GQ1G [Receipt Dates TOT
P-JLand DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc
Used in these records
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
The download may take up to a minute.