Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0746 - Op Works - Stormwater [As Published] · 142008.746

of 65

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

JPA, schedule 8, part 1. table §, item 1, 1P Reguiation, schedule 2. iable 2, item 11; iP Regulation, schedule 1, table 5, fem 2 (wsild river area}; Water Act 2000,
section 966C; Wild Rivers Act 2005. section 434

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA {

 

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No-Gotoai4 [(} Yes

IPA, schedule § part 1. table 2. dein 1 IPA schedule @, pari 1 table 5 tems 2 and 4, iP Reguialion scledule 2. tabie 2. dems 7 and 23. Envircnmentat Prolection Act 1994 section
TQAA (wild river area) Wid Rivers Act 2005. section 424; relevant wid aver deciarabor Wid Rivers Code.

 

 

(WITHIN THE LIMITS OF & PORT |
1.4 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

No - Go fo 01.5

LJ Yes

IP Reguiation, schedule 2, table 2. tems 15 and 16

 

(DECLARED FISH HABITAT AREA |

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
No - Go to. 01.6

oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

JP Regulation, schedule 2. tabie 2. item 26

 

 

 

 

ICOMMUNITY INFRASTRUCTURE oe Se . " “8 ® " il
1.6 ts any part of the premises designated for community infrastructure?

No - Goto Q1.7

LI Yes

IP Regulation, schedule 2, table 3, lem 7
WASTE WATER MANAGEMENT —— |
V7 Does the proposal involve the establishment or expansion of a waste water disposal system?

No -Endof Section? [_] Yes
iP Regulation. schedtle 2. table 3, item 5

 

SECTION 4. Section 4 must be completed when the application seeks approval to carry out operational work,

 

 

 

 

 

[PLANNING SCHEME . _ . a . 4
41 Is any of the proposed operational work assessable under a planning scheme?
(J No - Go fo. 04.2 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.
ISTATE-CONTROLLED ROAD i |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No
(1 Yes

If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

No - Goto 04.1.2

Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

IP Regulation, schedute 2. table 3. item 3: 1P Regulation. schedule 2. table 3. item 1{b}

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.