08/0746 - Op Works - Stormwater [As Published] · 142008.746
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
\VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
43 ts any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
No -Gotoa44 [_] Yes
IPA, schedute 8, part 1, table 4, ilams 14-16, IP Regulation. schedule 2, lable 2, ilem 5 (vegetation clearing}; IP Regulation, schedule 2, table 2, item 24 (koala
conservation): IP Regulation, schedule 1. part 3. table 4. ifem {vegetation clearing/wild river area}; Vegetation Management Act 1999, section 224 (vegetation
clearingWvald river area); Wild Rivers Act 2005. sections 31F and 43A
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA |
44 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No -Goto@45 [_] Yes - Answer (a) and {b) below
IPA, scheduis 8, pari 1, table 4. tems 3a); IP Regulation. schedule 2, table 2, item 8: iF Regulation. schedvic 1, zart 3. table 4. items 3 end 3A; Water Act 2000, section 966A {wild river
area}; Wild Rivers Act 2005, section 434; refavant wild sver declaration; Wid Rivers Code
45
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
No Goto 04.6 O Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1. table 4, item 3{b}: IP Regulation, schedule 2, table 2, item 8 IP Regulation, schedule 1. part 3. lable 4, item 3
Wild Rivers code (Note: the code does nol currently contain applicable provisions for taking or interfering with artesian water}
46 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
No -Gotoa47 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 7, tabie 4, dem Hc}{i), P Regulation, schedule 2, fabie 2, item 8. IP Reguiaticn. schedule J, part 3. table 4. item 3, Water Aci 2006, section 9664 jwild nver area):
Witd Fivers Act 2005, section 43A; refevant wild river declaration; Wild Rivers Code
47 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No -Gotoa4e [_] Yes
IPA, schedule 8, part 1, table 4, item 3{c}{ii): IP Regulation, schedule 2. table 2. item & IP Regulation, schedule 1. part 3. fable 4, item 3
Water Act 2000. section 966A (wild river area){Noze: no current Wild River declaration identifies taking or interfering with subartesian water as assessable)
Wild River code (Note: ihe code does not currently contain applicable provisions for sub artesian water}
48
Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water)?
[] No - Goto a49 Yes - Answer both (a) and {b) below
(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared
under the Wild Rivers Act 2005?
L] Yes
No
If no, are the operations mentioned as assessable development in the following?
@) A water resource plan under the Water Act 2000 £_] No [] Yes
(ii) A regulation under the IPA or the Water Act 2000 [] No LI Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part K,q) This application requires assessment by the Department
of Natural Resources and Water (NRW). if NRW is not the Assessment Manager for
the application, the agency has jurisdiction as Concurrence Agency. Go to (b)
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a
drainage and embankment area (other than a wild river floodplain management area) and declared to be
assessable under that Act?
No O Yes - (Complete Form 1, Part Ki) This application requires assessment by the Department of Natural Resources and Water
(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
IPA schedtie 2. pad 1. fable 4. dems Sécits) and 3d) IP Regulation, schedule 2, table 2, dem &: iP Regulation, schedule {. part 3. tabie 4, fom JA: Water Act 2006, section 9668 (wit
Aver area}, relevant wid river dectaration; Wid Rivers Code.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.