Council archive · source document
08/0746 - Op Works - Stormwater [As Published] · 142008.746
July 2003 02682118(AD) Information Requested Reference 7. The Geotechnical Engineering Report prepared by Galder and Associates and dated October 2002 utilises soil-testing from previous testing conducted in 198] and 1990. Since this time, soil conditions may have altered, Particularly with increased development in the area. New soil testing should be conducted and utilised for the Geotechnical report, although comparisons to the previous testing and soil conditions is welcome. Sections 4,2 & 5.0 8. It is noted that the applicant intends to store sewerage and stormwater on site via holding tanks located on piles underneath Proposed Pavilion 3. The structural analysis and geotechnical report do not appear to consider the potential loads this will place on the piles. The reports should be extended to consider these impacts, This should consider the Sizing of the tanks and should consider the worst-case scenario with both the holding tanks fully loaded. Section 6.1 & 6.3 9. The Geotechnical report refers to ‘a steep incised gully runs towards Park Road through the centre of the block This gully has been formed through erosion or shallow movement in the soil (or both)’. It is noted that this area is located underneath the proposed pavilion 3 additionat Stability investigation should be carried out and should consider the potential impacts of the surface irrigation proposed under the dwelling. Section 6.3, Para 7 10. The Geotechnical report states that Slopes on the site range from 14° to 45°, please indicate the various grade ranges across the site, particularly in the vicinity of the pavilions and driveway area. Figure 1 J]. Provide the irrigation rate/hydraulic loading on the slope proposed via Section 6.1 & the surface irrigation under the proposed pavilions. This should consider the | 6.2, Para7 worst case scenario being the plants dieing and being minimal to no uptake of water and how this will affect the site Stability. 15.7 The Construction Management Plan shall be reviewed and approved by | Section 6.4, the consulting geotechnical engineer Para 2 Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.