July 2003

02682118(AD)

 

Information Requested

Reference

 

7. The Geotechnical Engineering Report prepared by Galder and Associates
and dated October 2002 utilises soil-testing from previous testing conducted
in 198] and 1990. Since this time, soil conditions may have altered,
Particularly with increased development in the area. New soil testing should
be conducted and utilised for the Geotechnical report, although comparisons
to the previous testing and soil conditions is welcome.

Sections 4,2
& 5.0

 

8. It is noted that the applicant intends to store sewerage and stormwater on
site via holding tanks located on piles underneath Proposed Pavilion 3. The
structural analysis and geotechnical report do not appear to consider the
potential loads this will place on the piles. The reports should be extended to
consider these impacts, This should consider the Sizing of the tanks and
should consider the worst-case scenario with both the holding tanks fully
loaded.

Section 6.1
& 6.3

 

9. The Geotechnical report refers to ‘a steep incised gully runs towards
Park Road through the centre of the block This gully has been formed
through erosion or shallow movement in the soil (or both)’. It is noted that
this area is located underneath the proposed pavilion 3 additionat Stability
investigation should be carried out and should consider the potential impacts
of the surface irrigation proposed under the dwelling.

Section 6.3,
Para 7

 

10. The Geotechnical report states that Slopes on the site range from 14° to
45°, please indicate the various grade ranges across the site, particularly in
the vicinity of the pavilions and driveway area.

Figure 1

 

J]. Provide the irrigation rate/hydraulic loading on the slope proposed via

Section 6.1 &

 

the surface irrigation under the proposed pavilions. This should consider the | 6.2, Para7
worst case scenario being the plants dieing and being minimal to no uptake

of water and how this will affect the site Stability.

15.7 The Construction Management Plan shall be reviewed and approved by | Section 6.4,
the consulting geotechnical engineer Para 2

 

 

Golder Associates

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.