08/0746 - Op Works - Stormwater [As Published] · 142008.746
&
art a
Lat
ifct
BM NAIL IN BIT
30°00’
RL 98054
FL 40.24
14
A sges ~RP52918
L 4949
INCOMING PIPEWORK TO HYDRAULIC
MA X, ENGINEER'S SPECIFICATION.
REFER DETAIL 1 FOR
STILLNG CHAMBER DETAILS (Derived From Réecnattion
shown on KimmorleyaSyrve ying
dwg05065-B) Oo
RPS2918
150, 150,
DECK LEVELS
4233 LOWER
4513 UPPER
Ey :
i. >
3:1 SAND: CEMENT
MORTAR
450/150) t40) 160 150
150,150,140, 160 , 150,150,
+
450) 450
900.
STORMWATER MANAGEMENT PLAN
‘ALE 1:10
|S _ STRUCTURAL SCALE 10 wor? 3 ks
CONCRETE N25 SME). MU
@i00 ROCKER PIPE
‘600 max. LENGTH
600 mox. LENGTH
I
fet @100 ROCKER PIPE
50
al @100 ROCKER pe |
600 max. LENGTH 5050
DETAIL 1 — STILLING CHAMBER SECTION ‘A’
SCALE: 1:20
SCALE: 1:20
LEGEND
30-——————. EXISTING CONTOURS
——$w—— - -- EXISTING STORMWATER
—_—— $3 - EXISTING SEWER
mcm PROPOSED STORMWATER
mmc Jemme PROPOSED STORMWATER MANHOLE
mecmmccum 8 PROPOSED STILLING CHAMBER
(INTERNAL DROP}
_/
if
L
(GENERAL NOTES:
THIS DRAWING IS BASED ON MORQ STUDIO DRAWING
No. 9404/A2.04/1 & MAX WATTERSON & ASSOCIATES
DRAWING No. 02-1318 & 02-1318BA.
JHERE (S TO BE NO UNCONTROLLED DISCHARGE OF
WATER ONTO SLOPE.
STRIPPING VEGETATION FOR CONSTRUCTION PURPOSES
SHOULD BE MINMISED, IF VEGETATION IS DESTROYED IT
SHOULO BE REINSTATED IMMEDIATELY AFTER
CONSTRUCTION IS COMPLETEO.
ADDITIONAL LOAD DUE TO FILL, CONSTRUCTION
EQUIPMENT OR STOCKPILED MATERIALS SHOULD NOT
BE LOCATEO ON THE DUNE SLOPE.
THE USE OF VIBRATORY EQUIPMENT OF ANY KIND IS
NOT PERMITTED TO BE USED, INCLUDING VIBRATING
ROLLERS, THE USE OF VIBRATING INSTALLATION
TECHNIQUES FOR SHEET PILING & OTHER
CONSTRUCTION VIBRATIONS CAUSED BY EXCAVATING,
EARTHMOVING OR DEMOLITION MACHINERY OR OTHER
SIMILAR CONSTRUCTION TECHNIQUES.
THE CONSTRUCTION MANAGEMENT PLAN !S TO BE
ADHERED TO.
COPIES OF ALL INSPECTION REPORTS BY ENGINEERS
ARE TO BE SUBMITTED TO COUNCIL WITHIN 5 BUSINESS
DAYS OF THE INSPECTION TAKING PLACE.
THE GEOTACHNICAL ENGINEER WILL BE REQUIRED TO
BE ON SITE FOR THE WHOLE OF THE TIME DURING ANY
EXCAVATION. SUCH WORKS SHALL ONLY BE CARRIED
QUT DURING ORY WEATHER CONDITIONS & IF THERE IS
A RISK OF SAND MOVEMENT OCCURING, ALL WORK
SHALL BE SUSPENDED UNTIL SUCH STEPS, APPROVED
BY THE GEOTECHNICAL ENGINEER & THE COUNCIL'S
BUILDING SURVEYOR, HAVE BEEN TAKEN TO ENSURE
THAT NO FURTHER SLIPPAGE WiLL RESULT.
ANY DAMAGE CAUSED TO ANY PUBLIC UTILITY DURING
THE COURSE OF CONSTRUCTION SHALL BE REPAIRED
TO COUNCIL'S STANDAROS & AT NO COST TO
COUNCIL.
ANY ALTERATION OF ANY PUBLIC UTILITY OR OTHER
FACILITIES NECESSITATED BY THE DEVELOPMENT OF
THE LAND OR ASSOCIATED CONSTRUCTION WORKS
EXTERNAL TO THE SITE SHALL BE AT NO COST To
COUNCIL.
. THE TRANSPORTATION OF ALL MATERIALS TO & FROM
THE SITE SHALL BE UNDERTAKEN IN A MANOR SUCH
THAT NO PARTICLE MATTER ESCAPES ONTO A PUBLIC
ROAD. ALL VEHICLES CARRYING MATERIALS EITHER TO
OR FROM THE SITE SHALL BE COVERED TO PREVENT
MATERIALS INCLUDING DUST SEING WINDBLOWN FROM
THE VEHICLE.
‘
~
commGHT ‘Aare Deer Grow ry as xz (o" mr ST Biggs )
3722 manne Pate Susp 88 15
15.04.08
CLIENT NAME AMENDED, EASEMENT BGUNDARYS SHOWN
te 0% 08
STORMWATER LINE AMENDED, PIT U2 REMOVED
10% OB
rece nerrenensocnes | | EPS SS OTE :
ioceennnice | | |menmeerne: Alliance [ 1h PARK ROAD NOOSA
ISSUEO FOR OPW APPROVAL
2803 08)
STORMWATER MANAGEMENT PLAN
[ISSUED FOR APPROVAL ortatonceoengricom.
filePer
Ome
2/0 Hovence Suess Newstead O18 1008
ORs Sos) e330. # 817 3257 SRE Consuicing Engineers
oa Gece Aer Tor Cons oo
6B GM
Vans Cr
_,
= 2
pmenamene Dt aro Caniteanon creapare AEN 17 098 113078 ALN 099 193 7
rater
Wa
Ane
“RS SHOWN “at | 07559 | “"t01 | LY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0746 - Op Works - Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.