RL 9.805,
BM NAIL IN BIT

 

66
RP52918

     

RP52918

SERVICES INSTALLED UNDER EXISTING DRIVEWAY BY DIRECTIONAL DRILLING

 

 

 

   

 

           

 

              
             

 

Kp e S
SERRE RRS
IPR ORS
oe EER Pg RRP x
y HCB L&, g IRE a —

We 1685S IU Oo ete

SL17 74 S oY,

{Derived From Ikrgprmakion 1

shown on Kimnorl os Irveying

 

alwg05065 - BD 9
” t
Qi, PROP. CONCRETE ORIVEWAY EXIST. CONCRETE ORIVEWAY
SS, FOR ORIVEWAY DETAILS

  

REFER STRUCTURAL

   

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30.5 ORAWINGS
yO
y 4 1
NOTE: So 65
STOCK PILE SPOIL ON UPSIDE OF TRENCH Pd
"peck Levels RP52918
2 4233 LOWER
45.13 UPPER
.,
SCALE: 1:125 RPSE9IE
tt 8 plan 1; 125 (Ar)
r
GENERAL_NOTES:
1. THIS ORAWING IS BASED ON WATTERSON & ASSOCIATES DRAWING No. 02-1318 & 2,
02-1318BA. ye SS E tA _ oe RPI77 > 7 ~
SEDIMENT MANAGEMENT NOTES: / m RP17755
1. ALL WORK SHALL BE IN ACCORDANCE WITH THE INSTTUTION OF ENGINEERS AUSTRALIA
{QUEENSLAND DIMSION) SOIL EROSION & SEDIMENT CONTROL - ENGINEERING ‘7
GUIDELINES FOR QUEENSLAND CONSTRUCTION SITES JUNE 1996. ( T FENCES: \ | LEGEND )
2. THERE IS TO BE NO UNCONTROLLED DISCHARGE OF WATER ONTO THE SLOPE. SEDIMEN NCES:
3. STRIPPING OF VEGETATION FOR CONSTRUCTION PURPOSES SHOULD BE MINIMISED. IF TH 30 ———~ EXISTING CONTOURS
VEGETATION 1S OESTROYED IT SHOULD GE REINSTATED IMMEDIATELY AFTER ‘ ee One UNOS SRADARD DRAWN IPREAO a etOn CE WATH SUNSHINE
CONSTRUCTION IS COMPLETED, . S¥——— EXISTING STORMWATER
4. STOCK PILED MATERIALS SHOULD NOT BE LOCATED ON THE OUNE SLOPE. ALL STOCK MULCHING: i
PILES INCLUDING SAND/ SOIL BUILDING MATERIALS SHALL BE CONTAINED WITHIN eeu F we EXISTING WATER
PILE DUAL ernment CARERS TERIAL o 1. SERVICE TRENCHES SHALL BE TOPSOLED & REVEGETATED IMMEDIATELY AFTER THE e
5, THE CONSTRUCTION MANAGEMENT PLAN IS TO BE ADHERED 10. TRENCH IS BACKFILLED. THE FINAL 100-150mm OF TOPSOIL SHALL BE UNCOMPACTED Ys mmm mem mes PROPOSED STORMWATER TRENCH/SEWER
6. THE TRANSPORTATION OF ALL MATERIALS TO AND FROM THE SITE SHALL BE & LEFT ROUGHENED & UNDULATING ,
UNDERTAKEN IN A MANNER SUCH THAT NO PARTICLE MATTER ESCAPES ONTO A 2, MULCH REINFORCED BY COVERING WITH A FINE GEOSYNTHETIC NETTING OR SPRAYING meme PROPOSED SEDIMENT FENCE
PUBLIC ROAD. ALL VEHICLES CARRYING MATERIALS EITHER TO OR FROM THE SITE WITH HYDRO MULCH TACKIFIERS. (50% GUAR 50% PVA MIX APPLIED AT A RATE OF
SHALL BE COVERED TO PREVENT MATERIALS INCLUDING DUST BEING WNDBLOWN FRON 2kg/100msq. TO 65~80kq/100msq. ORGANIC MATERIAL) SHALL BE PLACEO ACROSS | ——s———s— PROPOSED WATER (TO HYDRAULIC ENGINEERS SPEC)
THE VEHICLE. THE DISTURBED AREA TO PREVENT RUNOFF & RAIN DROP IMPACT FROM REMOVING
7. SITE DISTURBANCE SHALL BE LIMITED TO BUILDING AREAS, THEIR SURROUNDS & THE FRESHLY PLACED TOPSOIL. MULCH SHOULD BE SPREAD EVENLY WITH A MAX. 2 —e— PROPOSED READY TAP (TO HYDRAULIC ENGINEER'S SPEC)
OTHER USE AREAS. DEPTH OF SOmm.
8 TEMPORARY OR PERMANENT DOWN PIPES SHALL BE CONNECTED TO THE STORMWATER 3. ALTERNATIVES TO MULCHING SUCH AS THE APPLICATION OF PROPRIETARY EROSION E PROPOSED ELECTRICAL (TO ELECTRICAL ENGINEER'S SPEC)
SYSTEM BEFORE LAYING THE ROOF OR LOCALISED EROSION AVOIDED BY DIRECTING CONTROL MATTING, HYDRO MULCHING OR TURFING MAY BE PERMITTED AT THE 1 .
FLOW FROM DOWN PIPES TO NON EROSIVE AREAS. DISCRETION OF THE SUPERINTENDANT. ——!———— PROPOSED TELSTRA (TO ELETRICAL ENGINEER'S SPEC)
TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT KERB INLET SEDIMENT TRAPS: RRRRRY eroroseo TEMPORARY SHAKEDOWN
TRAP: 1. KERG INLET SEDIMENT TRAPS IN ACCORDANCE WITH SUNSHINE COAST REGIONAL {LS ] PROPOSED DRIVEWAY
1 IME ConstRuCTION BNTRY/ENIT SHAKEOOWH AREA SHALL BE CONSTRUCTED 4 COUNCIL'S STANDARD DRAWNG (PWEAQ D-OO4IA SHALL BE APPLIED 10 KER INLETS =
. IN THE IMMEDIATE MONITY OF THE SITE.
MAINTAINED IN ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL'S STANDARD SSS soit ov UPHILL SIDE OF TRENCH
DRAWING IPWEAO D-O040A. ALTERNATIVE 1, ALTERNATIVE 2 (S NOT SUITABLE OUE 70 tT) _=] EXISTING ORIVEWAY
\_THE NEED TO CONTROL VIBRATION FROM THE PASSAGE OF PLANT. ) SD - )
= ie
Nine -epoEpoNATOs ) Zz (Me ST Bi 5
copvecer parce Deagn Geo Pry ad ggs T I NTR
C 406 OS CLIENT NAME AMENDED. EASEMENT BOUNDARYS SHOWN = Sores < = « tre. ae < 3/21 Monee Pate Souter OAS . Propect RESIDENTIAL DEVELOPMENT SEDIMEN AND EROS ON ca OL
B_|%,06.08) TRENCH SIZE AMENDED wane: | 7008 farceOuproustyuctee | |e en, ‘ Alliance ‘ DETAILS AND NOTES
‘A |i104 06 SUED FOR OPW APPROVAL -— povanters4 ineresccn | SO Time | Comsuiting Eaguncers 14 PARK ROAD NOOSA
Dv {78.03 08 )SSUED FOR APPROVAL ae: | 7an308 Raaccosig on hy ieocoans | | DUbRreEcCg came . . 3) ee Deaped cn] ‘Approved tex Conainaean Tame treaia | Proed Ne No eae
Kno | one Arnone De PEG CERTACATION DAN CORTE ABes 17 OFF 1HRO7E ACK ONT 113 178 rroaunescanore 3) (LM GB GM i AS SHOWN Al [ 07559 | ( 03 | c)

 

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0746 - Op Works - Stormwater [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.