PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
Page 36 of 145
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
ATTACHMENT 1
proposed road improvements are not sufficient to provide the necessary safe environment
4, traffic generated by the development proposed will have significant adverse impacts on the
amenity of residents, given Top Forestry Road is unsealed and bird collection is likely to be
through the night and
5. the proposed sheds and earthworks necessary for shed construction is likely to adversely
impact on the scenic amenity of the area, as the applicant has not demonstrated that they
will integrate satisfactorily with the landform and landscape.
FINANCE AND RESOURCING
If council were to approve this development, the applicant would be required to pay infrastructure charges
for trunk infrastructure.
Council's Infrastructure Policy Branch has provided the following estimate of the infrastructure charges
required by this development (which excludes infrastructure charges to Unitywater):
isStatuSheceaket Mosse cheroe © ew) noun Paya
Allocation of adopted infrastructure charge to trunk
$156 672 |
Public Parks & Land for Community Facilities | ___s27.64a |
Stormwater (applicable to Non-Residential development | __ $500,000 |
TOTAL (June 2013 index) = $684,320 |
PROPOSAL
The application seeks approval for a Material Change of Use for Animal Husbandry Type 2 — Intensive
(Poultry Farm) and Environmentally Relevant Activity (ERA 4 - Poultry Farming), situated at 136 Top
Forestry Rd, Ridgewood.
The development involves the construction of 8 x 100m to 130m long x 16m wide sheds along the ndgeline
of the site, with each shed containing 30,000 to 38,500 chickens. On this basis, the site has the potential to
carry in the order of 250,000 birds at any one time. The applicant indicates the process involves the
rearing day old chicks to chickens for a period of 6-9 weeks, before being removed from the site for chicken
meat production (batch cycle).
Feed for the birds is brought onto the site throughout the batch cycle by 19m B-doubles, with an increase in
frequency associated with the birds’ mass. The applicant provided details for the feed requirements for an
8 shed farm, with 4 delivers in the first week, increasing to 24 delivenes dunng week 7 of the 9 week
cycle. The grown chickens are then removed from the site by truck in weeks 6, 7 and 9, most likely at night
when the bids are less active.
The applicant also proposes that, upon the completion of the bird growing cycle, the sheds are cleaned out
and prepared for the next batch cycle over a 2 week penod. Spent litter from the sheds is proposed to be
stockpiled within 2 bunded areas for a period of 4 to 5 weeks, before being spread onto the existing
avocado orchard. The bunded areas have a total lineal distance of 300m x 20m wide and are located
adjacent to the proposed sheds.
A Preliminary Operational Management Plan has been prepared by the applicant to address the operation
of the proposed poultry farm and the existing avocado farm.
The proposal plans are included as Attachment 1.
Page 36 of 145See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.