PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
Page 43 of 145
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
ATTACHMENT 1
Odour Nuisance
The proposed use of the site for intensive poultry farming, including the storage and spreading of the
manure, has the potential to affect the air quality of surrounding neighbours.
The applicant included an Air Quality Impact Assessment prepared by MWA Environmental, for the 8
poultry growing sheds. Pacific Environment reviewed the report's methodology and emissions estimations
on behalf of council. It was found the emissions estimation and modelling was calculated generally in line
with standard methods. However, there is a lack of data on the emissions from manure stockpiles and
manure spreading. Pacific Environment are, therefore, unable to support the findings by the applicant that
the farm complies with the Queensland odour guideline for rural zoned land of 2.5 odour units = C23;
are. Notably, even were the applicant to meet this guideline, the odour concentration levels would be
noticeable for nearby residents although classified as weak by the guidelines, but with the smell considered
“distinct” for at least 44 hours/year.
Pacific Environment also describe how most new poultry farms in SEQ Queensland are not approved with
litter stockpiling or spreading on site, as there is little data available about the resultant emissions.
The applicant's Preliminary Operations Management Plan details the fertiliser stockpiles and application
are an integral component of the proposed use, with a number of management practices having to be
adhered to for the development not to cause nuisance, including:
e2_Cilitter stockpiles being covered
e_Cilitter stockpiles tumed at least weekly, and only when prevailing winds are below 10km/h and
from the northeast to southeast sector
e2_applying litter within 4-5 weeks of the cleanout of the sheds to avoid stockpile odours coinciding
with high shed odours
e2—Cominimum setback of 50m is retained from spreading areas to boundanes and waterways
e_Cilitter is spread only during 6am to 6pm, and only when prevailing winds are from the northeast to
southeast and
e2_Doonly low velocity spreading equipment is used.
The applicant submits that these management practices would minimise odour emissions, yet no modelling
has been undertaken to quantify such claims. Council’s Environment Officer recommends that this practice
has the potential to be problematic and onerous on the operator, with conditions required to manage this
practice unlikely to be feasible. Furthermore, the Department of Agriculture, Forestry and Fisheries
guidelines recommend composting for a minimum of 12 weeks and, therefore, the applicant's composting
timeframes of 4-5 weeks may be unrealistic.
The applicant includes advice from an agronomist (Mynad International) detailing that all of the poultry
manure compost can be utilised by the existing orchard. Using the Department of Agnculture, Fisheries
and Forestry guidelines for applying poultry manure on farms, it is likely the modelling over-estimates the
manure application rates, and under-counts the area of trees to which the manure could be
spread. Furthermore, in discussions with the department, officers advised that the proposed application
rates may eventually kill the tree crop.
An additional shortcoming of the odour modelling report identified by Pacific Environment is the failure to
include the sensitive receiver location at 146 Top Forestry Road. This site includes a detached house and
is currently a separate freehold lot under the ownership of the applicant. As with other SEQ poultry farm
applications, it is regionally acceptable for this existing house to be included in the modelling. This
sensitive receiver site would not meet the Queensland odour guidelines for rural zoned land, based on the
predicted odour from the chicken sheds.
Water Quality
Page 43 of 145See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.