Original source · versioned page text
2014-09-16 Planning & Organisation Committee Agenda
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
Page 46 of 145
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
ATTACHMENT 1
e +. ‘.
© rg ae Me a , |
e Y
ee te | :
i % = | @ oesccras o_~
ma « s &
> rox? . \
' \ s
baba ; es * Bj * \
° , w 3 "HEN
e a @ . \
ba, .? > of eo s os \
I © 3 a \
pe See ps *
Coery nen ee? . 1
pmaner ars #, P - & ‘
! . , :
afd. £ ‘
; y Caerte'ps | 4
SS 7 re,
Seth" yoo . é i.
LS tee 5
a Read 9, out ‘ =
“se ."
¥ b 3 ” Coty,
; te oy % Naan,
‘ ~ i NS yey . ,
} Toei Fem é + > ees,
The following table provides a summary and assessment of the issues raised by submitters.
[Issues 0 Comments
Operations The Preliminary Operational Management
Broiler shed production is now a synchronized | Plan calculates the total amount of shed
operation, rather than staged. This streamlines | litter potentially generated by a full shed
production but means enormous volumes of cleanout to be 1,027m3 per batch. No
odourous shed litter require processing in huge | quantitative data has been provided to
batches at each shed clean out. estimate the odour emissions from this
source.
Noise Impacts No road improvements have been
Noise impacts on neighbouring dwelling as a suggested by the applicant to suppress
result of day and night operations, including increased sound pressure emissions from
ventilation, shed clean out and traffic. trucks travelling along the associated
roads, both day and night. All other noise
impacts from the sheds are considered to
comply with the relevant noise criteria.
Odour Impacts The odour modeling fails to account for
Odour impacts will adversely affect the the impacts associated with the
neighbouring residents. stockpiling of manure and spreading on
the existing avocado orchard. The report
also does not satisfy the QLD Odour
Guidelines of 2.5 odour units = C99.5 Thr
for the neighbouring property at 146 Top
Forestry Road.
associated wih the cleanout of th
The dust problems will adversely affect the associated with the cleanout of the sheds
Page 46 of 145See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.