Original source · versioned page text
2014-09-16 Planning & Organisation Committee Agenda
The original of this document is very large (16.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
Page 48 of 145
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
ATTACHMENT 1
The sheds and associated earthworks will and fill on the existing ndgelines to
have a visual impact to the surrounding accommodate the sheds, roads and litter
houses. storage areas. Vegetated screening is
Too many signs will have to be erected along _| unlikely to be successful due to the sites
the roads waming of trucks etc. slope and significant earthworks
The proposal is completely out of scale with proposed.
other agricultural uses.
Water Quality The water quality specialists consider the
Rainfall data has been taken from Tewantin, rainfall data used to be adequate for this
whereas the rainfall totals in the Top Forestry _| location. However, there is uncertainty
area have been a lot more in the previous regarding the water quality impacts
three years. associated with the application of spent
Impacts on the tributary to the Mary River. litter on the existing avocado orchard.
MUSIC modeling does not apply to
calculate the impacts, as this is
predominantly an urban catchment model
and assess different nutrient criteria.
Public Notification The applicant's consultant advises that he
Residents along Top Forestry Road advise that | carried out the public notification for the
there was a lack of signs along Top Forestry application in accordance with the Act’s
Road requirements and did maintain a sign to
this road frontage.
Submissions in support Were the application to be approved, the
The applicant has a proven track record and is | approval is for the site, not the operator.
a skilled operator
Significant investment in local economy The proposal is not consistent with the
The proposal will create additional employment | planning scheme as the applicant has not
Is consistent with planning scheme and satisfactonly demonstrated that the
impacts are addressed appropnate'! impacts can be mitigated appropnately.
DRAFT SUNSHINE COAST PLANNING SCHEME
The proposal is defined in the rural activity group being an Intensive Animal Industry— Poultry and located
within the Rural Zone of the draft Sunshine Coast Planning Scheme.
The application would trigger impact assessment under the draft planning scheme, as the development
involves more than 1,000 birds and would be affected by the following overlays:
e_OoBiodiversity, Waterways and Wetlands — Waterways: Stream Oder 1-2 & 34
el_COBiodiversity, Waterways and Wetlands — Ripanan Protection Area
e“_OOBiodiversity, Waterways and Wetlands — Native Vegetation Area
e_OoBiodiversity, Waterways and Wetlands — Koala Habitat Area
e2"OoBushfire Hazard — High Hazard Area
e2_CoHeight of Buildings and structures — 8.5 metres
eOOLandslide Hazard Area
e277 oRegional Infrastructure — High Voltage Electncity Line and Buffer and
e2—OOScenic Amenity — Scenic Route.
The applicant has not satisfactorily demonstrated that the potential adverse impacts can be appropriately
mitigated in accordance with the draft Sunshine Coast Planning Scheme. However, it should be noted that
on 18 March 2013 council resolved to not include the Noosa Planning Scheme area in the yet to be
finalised Sunshine Coast Planning Scheme due to de-amalgamation of the Noosa area on 1 January 2014.
Page 48 of 145See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.