PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 16 September 2014
21. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains. Landscaping plants within these clearances must be low
growing when mature and suitable Unitywater approved varieties.
22. Written approval to enter and construct must be obtained from the owners of
properties through which external water mains will traverse. This must include
approval for a 3 meter wide easement over the mains, and be submitted with
lodgment of the associated development application for Operational Works.
23. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
ADVISORY NOTES
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt of
details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or
(07) 3212 6855.
Unitywater
2. Connection to the Unitywater live water supply and live sewerage system must
be undertaken by Unitywater at the applicant’s cost.
B. Apply the following property note to new Lot 2:
1. Building Envelope/s have been specified for this property for the construction of
a house or any habitable buildings. Details can be obtained from Council.
C. Find the following are sufficient grounds sufficient to justify the decision despite the
conflict with the planning scheme:
1. The smaller lot will contain a recently constructed house and modern effluent
treatment system and has been demonstrated to be suitably sized for its use;
2. The development is consistent with the developed character of Edward Street;
and
3. The development will not negatively impact on the residential amenity or village
character of Cooran.
REPORT
PROPOSAL
The application seeks approval to Reconfigure a Lot to subdivide 1 lot into 2 and create an
access easement. The existing lot to be subdivided is 1.894ha in size and the new lots are
1,176m2 and 1.778ha. The proposed access easement over an adjacent lot (also owned by
the applicant) will provide the new lots access to the site’s Edward Street frontage. A copy
of the proposal plan is included as Attachment 1.
SITE DETAILS
Background
In 2003 the applicant applied to realign the boundaries of 4 lots, which included the subject
site (Council ref. 23033DA). The current Registered Plan for the site reflects the approved
realignment.
Page 97 of 145
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.