Structural plans inc driveway
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn .C1. Issued
. For Construction. 17.06.22.
.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: GENERAL CONSTRUCTION
NOTES
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - N .
C1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 16 pages
Page 2
·
· A B
C D E
·
·
·· B C D E
··
··
··
1 1
2 2
B C D E
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
A B C D E THE NOTES CONTAINED ON 31025-N.
C2. .Driveway Revised 27.07.22.
C1 .Issued For Construction 17.06.22
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: GROUND & LOWER GROUND
LEVELS FOOTING & SLAB PLAN
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S1.1
C2
Page 3
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
C1. Issued For Construction. 17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: GROUND & LOWER GROUND
LEVELS FOOTING & SLAB DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S2.1 C1
Page 4
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
C1. Issued For Construction 17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: GROUND & LOWER GROUND
LEVELS FOOTING & SLAB DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S2.2 C1
Page 5
Ground Level THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
. . .
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: GROUND & LOWER GROUND
LEVELS FOOTING & SLAB DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S2.3 .
Page 6
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
C1. .Issued For Construction 17.06.22
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: GROUND & LOWER GROUND
LEVELS FOOTING & SLAB DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S2.4 C1
Page 7
1
FALL
2
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
C2. .Driveway Revised 27.07.22.
C1. .Issued For Construction 17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: TIMBER DRIVEWAY RAMP
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S2.5 C2
Page 8
A B C D E
1 1
2 2
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
A B C D E
C1 Issue For Construction 17/06/22
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
® ™ Title: GROUND LEVEL WALL FRAMING
PLAN
Project 6 BOWMAN TCE
® ™ SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S3.1 C1
Page 9
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
C1. Issued For Construction. 17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: WALL FRAMING DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S3.2
C1
Page 10
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
C1. Issued For Construction. 17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: WALL FRAMING DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S3.3
C1
Page 11
D E THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
2
1 1
FALL
2 2
FALL
FALL
A B C D E
.C1. Issued
. For Construction. 17.06.22.
.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
Step web:www.scg-engineers.com
70 Soffit ABN 40 098 481 899
Title: FIRST FLOOR SUSPENED SLAB
ARRANGEMENT PLAN
Project 6 BOWMAN TCE
FALL
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S4.1 .
C1
Page 12
D E THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
2
1 1
2 2
A B C D E
.C1. .
Issued For Construction. 17.06.22.
.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: FIRST FLOOR SUSPENED SLAB
BTM REINFORCEMENT PLAN
Project 6 BOWMAN TCE
FALL
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S4.2 .
C1
Page 13
D E THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
2
1 1
2 2
A B C D E
.C1. .
Issued For Construction. .
17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: FIRST FLOOR SUSPENED SLAB
TOP REINFORCEMENT PLAN
Project 6 BOWMAN TCE
FALL
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S4.3 .
C1
Page 14
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
.C1. Issued
. For Construction. 17.06.22.
.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: SUSPENDED SLAB DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S4.4 .
C1
Page 15
A B C D E
1 1
2 2
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
A B C D E
.C1. Issued
. For Construction. 17.06.22.
.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: FIRST FLOOR WALL FRAMING PLAN
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S5.1 .
C1
Page 16
A B C D E
1 1
2 2
FALL
THIS DRAWING AND ASSOCIATED DETAILS
MUST BE READ IN CONJUNCTION WITH
THE NOTES CONTAINED ON 31025-N.
A B C D E
C1. Issued For Construction. 17.06.22.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: ROOF FRAMING PLAN
Project 6 BOWMAN TCE
FALL SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - S6.1
C1
Page 17
. C1. . Issued For Construction. 17.06.22.
.
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: STANDARD FRAMING DETAILS
Project 6 BOWMAN TCE
SUNSHINE BEACH
Rev. - 10.06.16
Rev.
Date: MAY 2021 Drg No. 31025 - FD1.1 .
C1