Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Structural plans inc driveway

of 17

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                .C1.    Issued
                                        .      For Construction.                        17.06.22.
                                                                                        .
                           Revision     Description                                     Date
                        Issue:


                                                               Unit 1/11 Project Ave,
                                                               Noosa Heads
                                                                   Ph (07) 5455 5604




                  DEBUILD T/A
                                                                   email:[email protected]
                                                                   web:www.scg-engineers.com
                                                                   ABN 40 098 481 899




                     Title:             GENERAL CONSTRUCTION
                                        NOTES
                    Project 6 BOWMAN TCE
                                       SUNSHINE BEACH




Rev. - 10.06.16
                                                                                               Rev.
                    Date: MAY 2021                    Drg No. 31025 - N                          .
                                                                                                 C1
Log in to download the original file

Structural plans inc driveway.pdf · 2.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 16 pages

Page 2

·




·            A   B


                     C   D   E
·

·

    ··                           B                                   C          D            E
    ··
    ··
    ··
         1                                                                                                           1


         2                                                                                                           2




                                 B                                   C          D            E




                                                                     THIS DRAWING AND ASSOCIATED DETAILS
                                                                     MUST BE READ IN CONJUNCTION WITH
             A   B   C   D   E                                       THE NOTES CONTAINED ON 31025-N.

                                                              C2.        .Driveway Revised                               27.07.22.
                                                              C1         .Issued For Construction                        17.06.22
                                                             Revision    Description                                     Date
                                                         Issue:


                                                                                                 Unit 1/11 Project Ave,
                                                                                                 Noosa Heads
                                                                                                 Ph (07) 5455 5604




                                                       DEBUILD T/A
                                                                                                 email:[email protected]
                                                                                                 web:www.scg-engineers.com
                                                                                                    ABN 40 098 481 899




                                                       Title:        GROUND & LOWER GROUND
                                                                     LEVELS FOOTING & SLAB PLAN
                                                       Project 6 BOWMAN TCE
                                                                     SUNSHINE BEACH




                                     Rev. - 10.06.16
                                                                                                                                Rev.
                                                       Date: MAY 2021                  Drg No. 31025 - S1.1
                                                                                                                                 C2

Page 3

                                THIS DRAWING AND ASSOCIATED DETAILS
                                MUST BE READ IN CONJUNCTION WITH
                                THE NOTES CONTAINED ON 31025-N.


                         C1.         Issued For Construction.                        17.06.22.
                        Revision     Description                                     Date
                    Issue:


                                                            Unit 1/11 Project Ave,
                                                            Noosa Heads
                                                            Ph (07) 5455 5604




                  DEBUILD T/A
                                                            email:[email protected]
                                                            web:www.scg-engineers.com
                                                                ABN 40 098 481 899




                  Title:          GROUND & LOWER GROUND
                                  LEVELS FOOTING & SLAB DETAILS
                  Project 6 BOWMAN TCE
                                  SUNSHINE BEACH




Rev. - 10.06.16
                                                                                            Rev.
                  Date: MAY 2021                   Drg No. 31025 - S2.1                       C1

Page 4

                                THIS DRAWING AND ASSOCIATED DETAILS
                                MUST BE READ IN CONJUNCTION WITH
                                THE NOTES CONTAINED ON 31025-N.

                         C1.        Issued For Construction                        17.06.22.
                        Revision    Description                                    Date
                    Issue:


                                                              Unit 1/11 Project Ave,
                                                              Noosa Heads
                                                              Ph (07) 5455 5604




                  DEBUILD T/A
                                                              email:[email protected]
                                                              web:www.scg-engineers.com
                                                              ABN 40 098 481 899




                  Title:         GROUND & LOWER GROUND
                                 LEVELS FOOTING & SLAB DETAILS
                  Project 6 BOWMAN TCE
                                 SUNSHINE BEACH




Rev. - 10.06.16
                                                                                          Rev.
                  Date: MAY 2021                  Drg No. 31025 - S2.2                      C1

Page 5

Ground Level                                   THIS DRAWING AND ASSOCIATED DETAILS
                                               MUST BE READ IN CONJUNCTION WITH
                                               THE NOTES CONTAINED ON 31025-N.


                                       .           .                                          .
                                       Revision    Description                                Date
                                   Issue:


                                                                         Unit 1/11 Project Ave,
                                                                         Noosa Heads
                                                                         Ph (07) 5455 5604




                                 DEBUILD T/A
                                                                         email:[email protected]
                                                                         web:www.scg-engineers.com
                                                                         ABN 40 098 481 899




                                 Title:          GROUND & LOWER GROUND
                                                 LEVELS FOOTING & SLAB DETAILS
                                 Project 6 BOWMAN TCE
                                                 SUNSHINE BEACH




               Rev. - 10.06.16
                                                                                                     Rev.
                                 Date: MAY 2021                  Drg No. 31025 - S2.3                   .

Page 6

                                THIS DRAWING AND ASSOCIATED DETAILS
                                MUST BE READ IN CONJUNCTION WITH
                                THE NOTES CONTAINED ON 31025-N.


                         C1.        .Issued For Construction                        17.06.22
                        Revision    Description                                     Date
                    Issue:


                                                           Unit 1/11 Project Ave,
                                                           Noosa Heads
                                                           Ph (07) 5455 5604




                  DEBUILD T/A
                                                           email:[email protected]
                                                           web:www.scg-engineers.com
                                                               ABN 40 098 481 899




                  Title:          GROUND & LOWER GROUND
                                  LEVELS FOOTING & SLAB DETAILS
                  Project 6 BOWMAN TCE
                                  SUNSHINE BEACH




Rev. - 10.06.16
                                                                                           Rev.
                  Date: MAY 2021                  Drg No. 31025 - S2.4                       C1

Page 7

1


                                    FALL
2




                                           THIS DRAWING AND ASSOCIATED DETAILS
                                           MUST BE READ IN CONJUNCTION WITH
                                           THE NOTES CONTAINED ON 31025-N.

                             C2.               .Driveway Revised                               27.07.22.
                             C1.               .Issued For Construction                        17.06.22.
                            Revision           Description                                     Date
                        Issue:


                                                                      Unit 1/11 Project Ave,
                                                                      Noosa Heads
                                                                      Ph (07) 5455 5604




                      DEBUILD T/A
                                                                      email:[email protected]
                                                                      web:www.scg-engineers.com
                                                                          ABN 40 098 481 899




                      Title:                 TIMBER DRIVEWAY RAMP

                      Project 6 BOWMAN TCE
                                             SUNSHINE BEACH




    Rev. - 10.06.16
                                                                                                      Rev.
                      Date: MAY 2021                         Drg No. 31025 - S2.5                       C2

Page 8

        A       B   C   D   E




1                                                                                                                   1


2                                                                                                                   2




                                                                THIS DRAWING AND ASSOCIATED DETAILS
                                                                MUST BE READ IN CONJUNCTION WITH
                                                                THE NOTES CONTAINED ON 31025-N.
        A       B   C   D   E
                                                         C1        Issue For Construction                        17/06/22
                                                        Revision    Description                                  Date
                                                    Issue:


                                                                                            Unit 1/11 Project Ave,
                                                                                            Noosa Heads
                                                                                            Ph (07) 5455 5604




                                                  DEBUILD T/A
                                                                                            email:[email protected]
                                                                                            web:www.scg-engineers.com
                                                                                            ABN 40 098 481 899




    ®       ™                                     Title:         GROUND LEVEL WALL FRAMING
                                                                 PLAN
                                                  Project 6 BOWMAN TCE
    ®       ™                                                    SUNSHINE BEACH




                                Rev. - 10.06.16
                                                                                                                        Rev.
                                                  Date: MAY 2021                  Drg No. 31025 - S3.1                      C1

Page 9

                                THIS DRAWING AND ASSOCIATED DETAILS
                                MUST BE READ IN CONJUNCTION WITH
                                THE NOTES CONTAINED ON 31025-N.


                         C1.        Issued For Construction.                        17.06.22.
                        Revision    Description                                     Date
                    Issue:


                                                           Unit 1/11 Project Ave,
                                                           Noosa Heads
                                                           Ph (07) 5455 5604




                  DEBUILD T/A
                                                           email:[email protected]
                                                           web:www.scg-engineers.com
                                                               ABN 40 098 481 899




                  Title:          WALL FRAMING DETAILS

                  Project 6 BOWMAN TCE
                                  SUNSHINE BEACH




Rev. - 10.06.16
                                                                                           Rev.
                  Date: MAY 2021                  Drg No. 31025 - S3.2
                                                                                             C1

Page 10

                                THIS DRAWING AND ASSOCIATED DETAILS
                                MUST BE READ IN CONJUNCTION WITH
                                THE NOTES CONTAINED ON 31025-N.


                         C1.        Issued For Construction.                        17.06.22.
                        Revision    Description                                     Date
                    Issue:


                                                           Unit 1/11 Project Ave,
                                                           Noosa Heads
                                                           Ph (07) 5455 5604




                  DEBUILD T/A
                                                           email:[email protected]
                                                           web:www.scg-engineers.com
                                                               ABN 40 098 481 899




                  Title:          WALL FRAMING DETAILS

                  Project 6 BOWMAN TCE
                                  SUNSHINE BEACH




Rev. - 10.06.16
                                                                                           Rev.
                  Date: MAY 2021                  Drg No. 31025 - S3.3
                                                                                             C1

Page 11

                                                      D   E                                   THIS DRAWING AND ASSOCIATED DETAILS
                                                                                              MUST BE READ IN CONJUNCTION WITH
                                                                                              THE NOTES CONTAINED ON 31025-N.


                                              2




                 1                                                                                                                                    1




                         FALL
                 2                                                                                                                                    2


                                FALL




                                       FALL




                     A                 B          C   D   E
                                                                                      .C1.         Issued
                                                                                                   .      For Construction.                        17.06.22.
                                                                                                                                                   .
                                                                                      Revision     Description                                     Date
                                                                                  Issue:


                                                                                                                          Unit 1/11 Project Ave,
                                                                                                                          Noosa Heads
                                                                                                                          Ph (07) 5455 5604




                                                                                DEBUILD T/A
                                                                                                                          email:[email protected]
          Step                                                                                                            web:www.scg-engineers.com
70 Soffit                                                                                                                     ABN 40 098 481 899




                                                                                Title:          FIRST FLOOR SUSPENED SLAB
                                                                                                ARRANGEMENT PLAN
                                                                                Project 6 BOWMAN TCE
        FALL
                                                                                                SUNSHINE BEACH




                                                              Rev. - 10.06.16
                                                                                                                                                          Rev.
                                                                                Date: MAY 2021                   Drg No. 31025 - S4.1                       .
                                                                                                                                                            C1

Page 12

                           D   E                                   THIS DRAWING AND ASSOCIATED DETAILS
                                                                   MUST BE READ IN CONJUNCTION WITH
                                                                   THE NOTES CONTAINED ON 31025-N.


                   2




       1                                                                                     1


       2                                                                                     2




           A   B       C   D   E
                                                           .C1.         .
                                                                        Issued For Construction.                        17.06.22.
                                                                                                                        .
                                                           Revision     Description                                     Date
                                                       Issue:


                                                                                                 Unit 1/11 Project Ave,
                                                                                                 Noosa Heads
                                                                                                 Ph (07) 5455 5604




                                                     DEBUILD T/A
                                                                                                 email:[email protected]
                                                                                                 web:www.scg-engineers.com
                                                                                                   ABN 40 098 481 899




                                                     Title:          FIRST FLOOR SUSPENED SLAB
                                                                     BTM REINFORCEMENT PLAN
                                                     Project 6 BOWMAN TCE
FALL
                                                                     SUNSHINE BEACH




                                   Rev. - 10.06.16
                                                                                                                               Rev.
                                                     Date: MAY 2021                   Drg No. 31025 - S4.2                       .
                                                                                                                                 C1

Page 13

                           D   E                                   THIS DRAWING AND ASSOCIATED DETAILS
                                                                   MUST BE READ IN CONJUNCTION WITH
                                                                   THE NOTES CONTAINED ON 31025-N.


                   2




       1                                                                                                                   1


       2                                                                                                                   2




           A   B       C   D   E
                                                           .C1.         .
                                                                        Issued For Construction.                        .
                                                                                                                        17.06.22.
                                                           Revision     Description                                     Date
                                                       Issue:


                                                                                               Unit 1/11 Project Ave,
                                                                                               Noosa Heads
                                                                                               Ph (07) 5455 5604




                                                     DEBUILD T/A
                                                                                               email:[email protected]
                                                                                               web:www.scg-engineers.com
                                                                                                   ABN 40 098 481 899




                                                     Title:          FIRST FLOOR SUSPENED SLAB
                                                                     TOP REINFORCEMENT PLAN
                                                     Project 6 BOWMAN TCE
FALL
                                                                     SUNSHINE BEACH




                                   Rev. - 10.06.16
                                                                                                                               Rev.
                                                     Date: MAY 2021                   Drg No. 31025 - S4.3                       .
                                                                                                                                 C1

Page 14

                                THIS DRAWING AND ASSOCIATED DETAILS
                                MUST BE READ IN CONJUNCTION WITH
                                THE NOTES CONTAINED ON 31025-N.


                        .C1.         Issued
                                     .      For Construction.                        17.06.22.
                                                                                     .
                        Revision     Description                                     Date
                    Issue:


                                                            Unit 1/11 Project Ave,
                                                            Noosa Heads
                                                            Ph (07) 5455 5604




                  DEBUILD T/A
                                                            email:[email protected]
                                                            web:www.scg-engineers.com
                                                                ABN 40 098 481 899




                  Title:          SUSPENDED SLAB DETAILS

                  Project 6 BOWMAN TCE
                                  SUNSHINE BEACH




Rev. - 10.06.16
                                                                                            Rev.
                  Date: MAY 2021                   Drg No. 31025 - S4.4                       .
                                                                                              C1

Page 15

    A   B   C   D   E




1                       1


2                       2




                                                            THIS DRAWING AND ASSOCIATED DETAILS
                                                            MUST BE READ IN CONJUNCTION WITH
                                                            THE NOTES CONTAINED ON 31025-N.

    A   B   C   D   E
                                                    .C1.         Issued
                                                                 .      For Construction.                        17.06.22.
                                                                                                                 .
                                                    Revision     Description                                     Date
                                                Issue:


                                                                                        Unit 1/11 Project Ave,
                                                                                        Noosa Heads
                                                                                        Ph (07) 5455 5604




                                              DEBUILD T/A
                                                                                        email:[email protected]
                                                                                        web:www.scg-engineers.com
                                                                                            ABN 40 098 481 899




                                              Title:          FIRST FLOOR WALL FRAMING PLAN

                                              Project 6 BOWMAN TCE
                                                              SUNSHINE BEACH




                            Rev. - 10.06.16
                                                                                                                        Rev.
                                              Date: MAY 2021                   Drg No. 31025 - S5.1                       .
                                                                                                                          C1

Page 16

           A   B          C   D   E




       1                              1


       2                              2


                   FALL




                                                                          THIS DRAWING AND ASSOCIATED DETAILS
                                                                          MUST BE READ IN CONJUNCTION WITH
                                                                          THE NOTES CONTAINED ON 31025-N.

           A   B          C   D   E
                                                                   C1.         Issued For Construction.                        17.06.22.
                                                                  Revision     Description                                     Date
                                                              Issue:


                                                                                                      Unit 1/11 Project Ave,
                                                                                                      Noosa Heads
                                                                                                      Ph (07) 5455 5604




                                                            DEBUILD T/A
                                                                                                      email:[email protected]
                                                                                                      web:www.scg-engineers.com
                                                                                                          ABN 40 098 481 899




                                                            Title:          ROOF FRAMING PLAN

                                                            Project 6 BOWMAN TCE

FALL                                                                        SUNSHINE BEACH




                                          Rev. - 10.06.16
                                                                                                                                      Rev.
                                                            Date: MAY 2021                   Drg No. 31025 - S6.1
                                                                                                                                        C1

Page 17

                  . C1.                  . Issued For Construction.                        17.06.22.
                                                                                           .
                  Revision               Description                                       Date
                                Issue:


                                                                  Unit 1/11 Project Ave,
                                                                  Noosa Heads
                                                                      Ph (07) 5455 5604




                  DEBUILD T/A
                                                                      email:[email protected]
                                                                      web:www.scg-engineers.com
                                                                      ABN 40 098 481 899




                                Title:   STANDARD FRAMING DETAILS

                            Project 6 BOWMAN TCE
                                         SUNSHINE BEACH




Rev. - 10.06.16
                                                                                                  Rev.
                            Date: MAY 2021             Drg No. 31025 - FD1.1                        .
                                                                                                   C1

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.