Council archive · source document
2602-50749 SRA Response with conditions · OPW25/0206
2602-50749 SRA
of use.
(b) Maintain any vegetation planted as a result of the rehabilitation work.
(c) Submit confirmation by an ecologist that part (a) of this condition has (b) In
been fulfilled to the Department of the Environment, Tourism, Science accordance with
and Innovation at [email protected] or by post to PO the
Box 15187 City East Queensland 4002. Rehabilitation
Works Package.
(c) Within 20
business days of
completing the
works.
5. Enter into an agreed delivery arrangement to deliver an environmental offset Prior to
in accordance with the Environmental Offsets Act 2014 to counterbalance commencing any
the significant residual impacts on the matter of state environmental clearing works.
significance being 37 non-juvenile koala habitat trees.
Note: Section 16 of the Environmental Offsets Act 2014 provides that when
an offset condition is imposed on an authority, a number of deemed
conditions are taken to apply. These deemed conditions are detailed in
sections 19B, 22, 24 and 25 of the Environmental Offsets Act 2014.
Contravention of a deemed condition is taken to be contravention of an
imposed condition.
More information on offset delivery can be found here:
https://www.qld.gov.au/environment/pollution/management/offsets/delivering.
Please send the notice of election to [email protected]. Provide Koala friendly measures in accordance with the Koala Sensitive Within 1 month
Design Guideline, prepared by the Department of Environment and Science of completion of
and dated December 2022, which is to include lit and unlit koala advisory clearing and
signage in accordance with the plan titled Indicative Koala Signage Plan, construction
prepared by Aspect, dated 15/05/2025, drawing No. 21- 0910_A10-12, issue works.
H.
7. Any pools to be constructed are to be designed, constructed and maintained At all times.
as koala-safe pools as described in the Koala Sensitive Design Guideline,
prepared by the Department of Environment and Science and dated
December 2022.
8. Prior to the commencement of clearing activities, notify the Department the 72 hours prior to
of Environment, Tourism, Science and Innovation at commencement
[email protected] of: of vegetation
clearing.
the expected date the clearing activity will commence;
the expected duration of the clearing activity;
the name and contact details of the koala spotter that has been
contracted for the clearing activity; and
the name, contact details and authority number of the spotter catcher
that has been contracted for the clearing activity.
State Assessment and Referral Agency Page 5 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2602-50749 SRA Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 347 KB (small file)
- File type
No other editions are linked here.