Skip to the record
Accept no substitutions.

Original source · versioned page text

ASTP-Rspns_To_RFI

Attached to the e-mail Response to Council’s Information Request - MCU21/0183 & OPW21/0292 - 9 Ruby Street Cooroy.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Response:
Please refer to the updated Stormwater Management Plan prepared by Ingeniir (Attachment 2), which
addresses Information Request Item 4.



            ITEM 5:
              Provide amended plans, prepared by a RPEQ, detailing the proposed roadworks,
              including but not limited to :
                       a) Pavement design, including connection to existing concrete pavement, thickness,
                          reinforcement, concrete strength, etc.;
                       b) Stormwater discharge details, including scour protection, cross sections, etc.

Response:
With respect to Information Request Item 5, the Information Request response prepared by Ingeniir
(Attachment 1) provides the following response to the following response:

     a.   Refer accompanying engineering plans revised to include the proposed pavement details matching that
          of the IPWEAQ standard RS-051 crossover. Details have been added for pavement connection to
          existing.

     b.   The stormwater from the site is to discharge to a kerb adapter in accordance with IPWEAQ standards.
          The scour protection is provided by the pavement widening added to opal lane. Cross sections can be
          found on the standard drawings for the outlet.



            ITEM 6:
            An amended plan detailing a 2 metre wide resumption at the Opal Lane frontage. It is important to
            note that the front setback will be measured from the existing title boundary as opposed to the
            resumed title boundary.

            ITEM 7:
            The front fence re-located so that it is setback 2.0 metres from the existing title boundary (re-located
            to new front boundary as a consequence of the resumption).

Response:
Refer to accompanying amended Proposal Plans prepared by Valentine Building Design (Attachment 3), which
demonstrates a 2 metre wide resumption along the Opal Lane frontage. As demonstrated on the amended plans,
the front boundary fence is positioned on the re-aligned property boundary.



            ITEM 8:
            An amended landscape plan consisting of native species in accordance with Planning
            Scheme Policy 2 – Landscaping.

            ITEM 9:
            The provision of landscaping between the existing dwelling and the front boundary.



                                                                                                          Page 3 of 4
Our ref: 210705
Log in to download the original file

ASTP-Rspns_To_RFI.pdf · 361 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.