Skip to the record
For the highest quality transcripts.

Original source · versioned page text

CC-3668 RFI Response

of 10

Page text shows just the words. Original shows the document exactly as it was published.

    8. The hydraulic consultant will provide details of how the rainwater tanks will be plumbed into the
       building for re-use. An overflow pipe from the rainwater tanks has been provided on the revised
       plans; please refer to CC-3668 Revision DR6 for details.




                                           Figure 1 – Bioretention Basin A




                                           Figure 2 – Bioretention Basin B

Should you have any queries please contact the undersigned at our Bundaberg office.

Yours faithfully




Sid Olive
for and on behalf of
EMPIRE ENGINEERING Pty Ltd

Att(s)   Empire Engineering Concept Plans – CC-3668 CON REV DR6
         MUSIC Model Files – CC-3668 MUSIC Revision D
Log in to download the original file

CC-3668 RFI Response.pdf · 3.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.