Skip to the record
The only place to find full transcripts.

Council archive · source document

08/1787 - Response to Information Request [As Published] · 132008.1787

of 96

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (24.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Column 1

   

LTT tai emelel en

 

works,

-11-

perme 1a 2
tiger tele roLalelgy
Pa 6s) < (= S53]

feu
Proposal

 

    

 

 

the site to avoid causing unhealthy
conditions incuding--

a) potential fire hazard;

b) ponding of water; and

Cc) breeding of vermin;

AND
$3.2 Infrastructure is disconnected, Can Comply
capped or sealed induding-- All affected infrastructure will be
a) electricity meters are removed and disconnected, capped or sealed as
electrical wires disconnected; and required
b) telephone lines are disconnected;
and
c) high speed data cables and television
provider boxes are disconnected and
removed;
AND
$3.3 A temporary crossing is provided Can Comply
to protect road reserve infrastructure A temporary crossing can be provided
induding kerb and channel;
AND
$3.4 Any damage to footpaths, street Can Comply
plantings, kerb and channel or roadways | Any damage to footpaths, street
at the removal site, the new site or plantings, kerb and channel or
“between the sites is repaired or roadways will be repaired or reinstated
reinstated, to at least pre-existing .
: conditions, :
(14.108 Amenity and envirorimental.protection™::..- Se ER EE are WL ee tat a,
O4 Waste materials are removed from $4.1 Waste materials are removed from | Can Comply

the site;

All waste materials will be removed
from the site

 

OS The potential for movement from
the site, of soils or similar materials is
minimised;

$5.1 Erosion and sediment control
measures are installed and maintained
until soils are stabilised by vegetation or
sealed.

Can Comply

Approved erosion and sediment control
measures will be installed and
maintained "

 

O06 Vacant sites do not have an
adverse impact upon the amenity of the
surrounding areas.

 

 

$6.1 If a development permit has not
been issued for the future use of the
site—

a) hard surfaced areas including
concrete slabs are removed or covered
with a minimum of 300mm of soil; and
b) disturbed areas are revegetated
using species identified in PSP3 —
Landscaping Plants and Guidelines.

Can Comply

No demolition is proposed until a
development permit has been issued for
the future use of the site

 

 

 

 

The Information and Referral Stage of IDAS has now concluded. We ask that you now provide details of
adjoining owners in order that we may commence the public notification of the application.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully

KHA DEVELOPMENT MANAGERS

    

Scott Sobey
DIRECTOR

 

 

Used in these records

About this file

File size
24.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1787 - Response to Information Request [As Published].pdf · 24.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.