Council archive · source document
08/1787 - Response to Information Request [As Published] · 132008.1787
Very large file (24.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Seahaven Development Pty Ltd- 9-19 Hastings Street Noosa QLD 4567 10 Prior to construction works, the site arborist should consult with the construction company or builder to outline appropriate tree protection methods dunng construction, to convey the importance of irce protection, and open communication channels. The builder or construction company is responsible for all tree protection procedures on the site as per this document, whenever the site arborist is not on site. [t is the responsibility of the builder to advise the site arborist of when their presence is required on site or of any breaches of the tree protection procedures. All trees being retained as specified by Sunshine Coast Regional Council on the council reserve should be appropriately marked by the site arborist. Tree Protection Fencing (where used or designated) is to consist of 1800mm high chain mesh fencing or similar appropriate fencing approved by the site arborist. TPF is to be anchored by star pickets to prevent movement during construction. TPF is to be instalied atong the northern boundary of the site to protect the whole of the council reserve. o For Tree No.57 the. TPF is to be extended onto the site to the edge of the existing in ground pool. ~ o For Tree No 48 the TPF is to be extended onto the site to a distance of 7.2 metres from the trunk, until such time that construction of the underground carpark is required. The construction workers or subcontractors working on the site are to be informed of tree protection importance by the builder. The site‘arborist and the builder should agrec upon and designate storage, dumping.and wash arcas that will riot impact on the trees during construction. The site arborist should organise soil injection treatments to improve the health and assist root regeneration in Trees No 48 & 57. At no point should a tree be removed unless approved by Sunshine Coast Regional Council (site arborist (6 document reasons for removal and contact council to organise a site meeting). During Construction The sitc arborist shall be present to supervise any excavation, trenching or tunnelling ocated on the site that may affect any tree roots, and shall keep a record of works to present to Council after completion of construction. The site arborist should supervise all excavation along the northern boundary within 7 metres of a Council reserve tree. Specifically; o Removal of the existing in ground poo! near Tree No 57. o Removal of the existing stairwell near Tree No 70. o Excavation for the underground carpark near Tree No 48. TPF then moved to the location shown in the attached diagram. Leaf and Limb Horticultural Consultancy® Prepared by Samuel Cowie 29" of January 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1787 - Response to Information Request [As Published]Related documentApplication case desk ↗
0019DFEA.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 24.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.