Page 6

Local Businesses and residents— Measures to minimise impact as follows:-
1. Any possible disruption to local businesses to be Communicated well in

advance, via methods of — Media, personal contact and/or letter drops

Traffic & Pedestrian controls as mentioned previously

Car parking controls as mentioned previously

Working hours to Council approval as mentioned previously

Dust and vibration controls as mentioned previously

Aesthetics of site controls as mentioned previously

AU RWH

Hutchinson Builders recent Projects and proven performance in
Hastings St Noosa Heads :-

Further, we would advise that Hutchinson Builders are the nominated Builder for the
project.

Hutchinson Builders have recently completed construction 2 projects in Hastings
Street Noosa Heads (being the Noosa Heads Surf Life Saving Club Redevelopment
and the Visitor information Centre Building ).

These projects were compieted at the end of January 2009.

The Visitor information centre is a Sunshine Coast Council Project. Please refer to
Adam Brown for a reference.

In order to complete these projects, Hutchinson Builders will have occupied the
highest pedestrian and vehicle traffic flow location in Hastings Street, being eastern
end directly adjacent the round about adjoining Noosa Parade, for a period no less
than 11 months. During this time, through diligent Pedestrian and Traffic control
plans and measures, we have had so incidents of safety and kept traffic impacts to
an absolute minimum through all times of the year, including peak holiday periods.

We have also managed to achieve good communication with the local Council,
Residents and Businesses in the street by regular and good communication and
development of working relationships. We ensure that any minor disruption is
notified well in advance by personal contact, media and letter drops. By adopting
these methods we have been able to achieve a harmonious environment during
construction works.

ant!

 

te
a

 

 

 

 

Used in these records

About this file

File size
24.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1787 - Response to Information Request [As Published].pdf · 24.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.