08/1787 - Response to Information Request [As Published] · 132008.1787
Very large file (24.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Page 6 Local Businesses and residents— Measures to minimise impact as follows:- 1. Any possible disruption to local businesses to be Communicated well in advance, via methods of — Media, personal contact and/or letter drops Traffic & Pedestrian controls as mentioned previously Car parking controls as mentioned previously Working hours to Council approval as mentioned previously Dust and vibration controls as mentioned previously Aesthetics of site controls as mentioned previously AU RWH Hutchinson Builders recent Projects and proven performance in Hastings St Noosa Heads :- Further, we would advise that Hutchinson Builders are the nominated Builder for the project. Hutchinson Builders have recently completed construction 2 projects in Hastings Street Noosa Heads (being the Noosa Heads Surf Life Saving Club Redevelopment and the Visitor information Centre Building ). These projects were compieted at the end of January 2009. The Visitor information centre is a Sunshine Coast Council Project. Please refer to Adam Brown for a reference. In order to complete these projects, Hutchinson Builders will have occupied the highest pedestrian and vehicle traffic flow location in Hastings Street, being eastern end directly adjacent the round about adjoining Noosa Parade, for a period no less than 11 months. During this time, through diligent Pedestrian and Traffic control plans and measures, we have had so incidents of safety and kept traffic impacts to an absolute minimum through all times of the year, including peak holiday periods. We have also managed to achieve good communication with the local Council, Residents and Businesses in the street by regular and good communication and development of working relationships. We ensure that any minor disruption is notified well in advance by personal contact, media and letter drops. By adopting these methods we have been able to achieve a harmonious environment during construction works. ant! te a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1787 - Response to Information Request [As Published]Related documentApplication case desk ↗
0019DFEA.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 24.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.