Council archive · source document
08/1787 - Response to Information Request [As Published] · 132008.1787
Very large file (24.0 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
coffey > geotechnics SPECIALISTS MANAGING THE EARTH Important information about your Coffey Report Interpretation by other design professionals Costly problems can occur when other design professionals develop their plans based on misinterpretations of a report. To help avoid misinterpretations, retain Coffey to work with other project design professionals who are affected by the report. Have Coffey explain the report implications to design professionals affected by them and then review plans and specifications produced to see how they incorporate the report findings. Data should not be separated from the report” The report as a whole presents the findings of the site assessment and the report should not be copied in part or altered in any way. Logs, figures, drawings, ete. are customarily included in our reports and are developed by scientists, engineers or geologists based on their interpretation of field logs (assembled by field personne!) and laboratory evaluation of field samples. These logs etc. should not under any circumstances be redrawn for inclusion in other documents or separated from the report in any way. Geoenvironmental concerns are not at issue Your report is not likely to relate any findings, conclusions, or recommendations about the potential for hazardous materials existing at the site unless specifically required to do so by the client, Specialist equipment, techniques, and personnel are used to perform a geoenvironmental assessment. Contamination can create major health, safety and environmental risks. (f you have no information about the potential for your site to be contaminated or create an environmental hazard, you are advised to contact Coffey for information relating to geoenvironmental issues. Coffey Geotechnics Pty Ltd ABN 93 056 929 483 Rely on Coffey for additional assistance Coffey is familiar with a variety of techniques and approaches that can be used to help reduce risks for all parties to a project, from design to construction. It is common that not all approaches will be necessarily dealt with in your site assessment report due to concepts proposed at that time. As the project progresses through design towards construction, speak with Coffey to develop alternative approaches to problems that may be of genuine benefit both in time and cost. Responsibility Reporting relies on interpretation of factual information based on judgement and opinion and has a level of uncertainty attached to it, which is far less exaci than the design disciplines. This has often resulted in claims being lodged against consultants, which are unfounded, To help prevent this problem, a number of clauses have been developed for use in contracts, reports and other documents. Responsibility clauses do not transfer appropriate liabilities from Coffey to other parties but are included to identify where Coffey's responsibilities begin and end. Their use is intended to help all parties involved to recognise their individual responsibilities. Read ail documents from Coffey closely and do not hesitate to ask any questions you may have. * For further information on this aspect reference shouid be made to “Guidelines for the Provision of Geotechnical information in Construction Contracts" published by the institution of Engineers Australia, National Headquarters, Canberra, 1987. 72520 ! 07-05 F fat ph
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1787 - Response to Information Request [As Published]Related documentApplication case desk ↗
0019DFEA.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 24.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.