220328 - Edwards Street - Slope Stability Assessment
Bev Jenner Const. 22073-001-Rev0 C/- Westera Partners 25 March 2022 Confirmatory compaction testing should be carried out at regular intervals. A minimum of two tests per vertical lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and Residential Developments. Fill embankment edges must be over-filled by 0.5 m (horizontally) and then trimmed back to well compacted material. 4.2.3 Excavations Excavations through the existing soils should be achievable using conventional earthmoving plant (e.g. small excavators) with toothed bucket attachments. It is understood that a cut of up to about 3 m depth would be required to site the garages proposed beneath the dual occupancy buildings. We would recommend that non surcharged temporary batters for the excavation do not exceed 1V:1.5H in the loose sands (to about 2 m depth at the location of the cut); and up to 1V:1H in the medium dense materials below. This assumes that groundwater, or other seepage, is not encountered and allows for a maximum batter height of 3 m. Although unlikely, if groundwater seepage is encountered, flatter batters may be required. Deeper cuts, if required, should be specifically assessed by Tectonic. Permanent cut and fill batters (e.g. for landscaped areas) up to 1 m high (vertical height) may be battered at no steeper than 1V:3H in loose sands or 1V:2H in medium dense sands. All remaining permanent cut/fill batters must be supported by engineer designed retaining walls. Any permanent soil and fill batters will require erosion protection (e.g. revegetation or surface protection). If the above temporary batter slopes cannot be achieved, due to spatial restraints, temporary shoring will be required, as per the recommendations in Section 4.4 below. Excavations in close proximity to existing footings will need to be specifically designed to prevent undermining. It is recommended that footing exposures or confirmation of foundations via certified building plans be undertaken to assess the possibility of undermining where close interaction is anticipated (possibly the pool on 166 Edwards Street). If undermining is a potential issue the existing structures may need to be underpinned or the excavation may require temporary shoring. The advice of a suitably qualified and experienced structural RPEQ must be sought regarding any potential undermining and design and construction of any underpins/temporary shoring (if required). The above recommendations do not supersede any existing safety regulations or legislation applicable to excavations (e.g. limits on personnel entry into trenches). Due to the highly permeable nature of the sands at this site, stormwater is expected to rapidly infiltrate the ground, making un-sealed surface drainage ineffective for the control of flows. Any sealed areas should be graded to ensure free drainage of stormwater away from construction areas, and to a control point(s). 4.3 Footings No design loadings were available at the time of reporting. Footings for the proposed dual occupancy buildings and ancillary structures (e.g. retaining walls etc.) must penetrate through any fill materials and unsuitable natural soils (i.e. loose sands) to found at least 0.5 m into medium dense (or denser) sands which were encountered/inferred at depths below about 2 m BGL (existing ground levels). With the scope of the basement excavation, it is likely that a mixture of normally dimensioned, conventional high-level footings and relatively short piles would be utilised for the structure. Footings founded as described above could be designed with a maximum allowable bearing pressure of 100 kPa (high level), or 300 kPa (maximum end bearing pressure for piles). Settlement under such loads is expected to be in the order of up to 20 mm or 1 % of footing width. It should be noted that excavation for high level footings may loosen the foundation subgrade. Therefore, the use of a vibrating plate would be required to densify any high-level footing bases prior to the placement of reinforcing steel. Due to close proximity to the surrounding properties, driven piles are not considered to be suitable for this site, and the presence of loose sands in the near subsurface would preclude the use of open bored piles unless the construction methodology can address sloughing (sidewall collapse) of sands by use of liners or 11/14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.