Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RFI - Att 4 - Stwtr Mngmt Plan

of 17

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                              ingeniir

8.    CONCLUSION
The proposed development has been analysed to provide design requirements to meet local and state
authority guidelines for stormwater quality and quantity outcomes.

A minimum 3,000 litres of rain water storage is to provided per dwelling and reused for non-potable purposes
to satisfy Council sustainability outcomes.

The proposed development can achieve the required design outcomes of the IPWEAQ by limiting site
discharge to Coral Tree Avenue to less than 50L/s during a 5% AEP Event and effectively maintaining site
stormwater discharge rates for all events up to and including the 1% AEP.

If you wish to discuss this report and analysis further, please contact Daniel Kenna.

Yours sincerely,



Daniel Kenna
Beng CPEng MIEAust RPEQ 15522 NER 3133685 EC 66121
for and on behalf of Ingeniir Pty Ltd




                                                 Ingeniir Pty Ltd | 221304-SMP-01
                   ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                            Page 9 | 13
Log in to download the original file

RFI - Att 4 - Stwtr Mngmt Plan.pdf · 1.8 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.