MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

 Insert Civic
Noosa   report title here
 Insert project
Engineering     name
             Report
  Insert job reference
J13041




  Prepared for
  QIC Noosa Civic Pty Ltd


  November 2014
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 155 (of 175)

Section 2

Noosa Civic
Engineering Report




Contact Information                      Document Information
Cardno (QLD) Pty Ltd                     Prepared for     QIC Noosa Civic Pty Ltd
ABN 57 051 074 992                       Project Name     Noosa Civic
                                         File Reference   O:\J13041\WP\engineering
Level 11 Green Square North Tower
                                                          report\engineering
515 St Paul’s Terrace
                                                          report.docx
Fortitude Valley QLD 4006
Locked Bag 4006 Fortitude Valley         Job Reference    J13041
                                         Date             November 2014
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 7 3369 9822

[email protected] Noosa Civic Pty Ltd             Version 1                             November 2014
engineering report_final.docx                                                    Page ii

Section 3

Noosa Civic
Engineering Report




Table of Contents
1         Introduction                                                               1
2         Water Supply and Sewerage                                                  2
3         Electricity Supply                                                         5
4         Geotechnical and Acid Sulfate Soil Issues                                  6
5         Groundwater                                                                7
6         Construction and Earthworks Management Plan                                8
7         Stormwater Management Plan                                                 9


Tables
Table 2-1            Noosa Civic Extension Equivalent Persons                        2
Table 2-2            Noosa Civic Extension Demand and Flow Projections               3



Figures
Figure 1             Electricity Reticulation
Figure 2             Detention Basins
Figure 3             Bio-retention Basins



Appendices
Appendix A                Geotechnical Report
Appendix B                Construction EMP
Appendix C                Erosion and Sediment Control Plan
Appendix D                Stormwater Management Plan
Appendix E                Civil Drawings




QIC Noosa Civic Pty Ltd                                   Version 1      November 2014
engineering report_final.docx                                                  Page iii

Section 4

Noosa Civic
Engineering Report




1                    Introduction
QIC Noosa Civic Pty Ltd (QIC) is proposing to expand Noosa Civic located at 28 Eenie Creek Road,
Noosaville, within Noosa Shire.
The site to be developed is east of the existing shopping centre, and is currently in an undeveloped natural
state.
Cardno (Qld) Pty Ltd (Cardno) has been commissioned to provide engineering and environmental
management planning services to QIC in relation to the construction and use of the proposed expansion.




QIC Noosa Civic Pty Ltd                           Version 1                                    November 2014
engineering report_final.docx                                                                         Page i

Section 5

Noosa Civic
Engineering Report




2                    Water Supply and Sewerage
There is a proposal to extend Noosa Civic. The existing centre is located on Eenie Creek Road, Noosaville,
and is within Unitywater’s water supply and sewerage service area. All water and sewer planning for the
proposed extension will be undertaken in accordance with Unitywater’s design criteria as detailed in the 2013
South East Queensland Design and Construction Code - Design Criteria.
The proposed extension to the centre will include the approximate increases in Gross Floor Area – Retail
given in Table 2-1 below. As per Unitywater’s design criteria an Equivalent Person (EP) is used for water
and sewer planning. Unitywater prescribes a density for both water and sewer EPs, as per its Schedule of
Works (Version 1.0, 25 June 2014). The adopted densities for water and sewage respectively are:
            1.32 EP per 100m2 Gross Floor Area (GFA); and
            1.54 EP per 100m2 Gross Floor Area (GFA).
A summary of the projected EP’s is detailed in Table 2-1. It is noted that GFA figures are not currently
available, and that GLA (Gross Leasable Area) has been used as a close analogue.
Table 2-1            Noosa Civic Extension Equivalent Persons

    Development Type                   GLA (m2)                     Equivalent Persons (EP)

                                                                 Water                   Sewer

   Discount Department                  5,400                    71.3                     83.2
          Store
         Supermarket 1                  1,550                    20.5                     23.9

         Supermarket 2                  4,000                    52.8                     61.6

           Mini Major                   3,550                    46.9                     54.7

               Food                      310                      4.1                     4.8

           Restaurant                    900                     11.9                     13.9

               Retail                   5,840                    77.1                     89.9

               Kiosk                     250                      3.3                     3.9

          Gymnasium                      460                      6.1                     7.1

         Multi-Use Area                  430                      5.7                     6.6


             TOTAL                      22,660                   299.5                   349.4




QIC Noosa Civic Pty Ltd                              Version 1                                   November 2014
engineering report_final.docx                                                                           Page ii

Section 6

Noosa Civic
Engineering Report



The projected peak flows developed as per Unitywater’s Desired Standards of Service (DSS) are detailed in
Table 2-2 below. Average Day demands are based on a projected use of 230 L/EP/day for water, and 210
L/EP/day for sewer.
Table 2-2            Noosa Civic Extension Demand and Flow Projections

     Service                     EP     Average Day     Mean Day     Peak Day     Peak Hour (PH – L/s)
                                         (AD – kL/d)    Maximum     (PD – kL/d)
                                                         Month
                                                        (MDMM –
                                                          kL/d)
       Water                    299.5       69            103          137                2.2

     Service                     EP     Average Dry Weather Flow    Peak Wet Weather Flow (PWWF – L/s)
                                             (ADWF – kL/d)
      Sewer                     349.4              73                              4.23



A report recently prepared previously by Cardno for a nearby development (Noosa on Weyba, Cardno 2013)
in the same service area was used to gain an understanding of the network capacity within the vicinity of the
proposed Noosa Civic expansion. This review ascertained network capacities in both the water and sewer
service networks. It was determined that sufficient capacity is currently available in each network for the
proposed expansion without the need for significant enhancement.
This finding will need to be confirmed with Unitywater prior to planning approval being granted. A relevant
application for assessment has been lodged with Unitywater but Cardno was still awaiting a formal response
at the date of lodgement of this current with Council.
The report prepared by Cardno for a nearby development is publically available on
http://www.paulsummersplanning.com.au/ClientPage_files/FoLW_files/Documents/20131028Att15ReportWa
terSupply&Sewerage.pdf.
Water Supply
Noosa Civic is located within the Noosa Industrial DMA water supply zone. An existing 600 mm diameter
trunk main along Eenie Creek Road, is the primary service main for Noosa and is in close proximity to the
proposed expansion. For the 2013 Cardno report referenced above (Noosa on Weyba), the external supply
network was assessed by MWH for additional growth. The relevant conclusions of the MWH report were:
Under maximum hour demand conditions Unitywater DSS were met at the proposed development site and
within Noosa Industrial DMA during the 2038 planning horizon.
Under fire flow demand conditions Unitywater DSS were met at the proposed development site and within
Noosa Industrial DMA during the 2038 planning horizon.
No augmentation of the existing network is required.
Sewerage
The proposed development site is within the Noosa Coastal sewerage scheme. The Noosa Coastal
sewerage scheme flows are treated at the Noosa Heads Sewage Treatment Plant (STP).
Noosa Civic is within the Noosaville Industrial sewerage catchment area. This catchment is primarily a
residential catchment discharging to a larger pump station (NVL011) which discharges via a 200 mm
diameter rising main into the trunk gravity mains along Eenie Creek Road. Twin gravity trunk mains convey
flow from the Noosaville Industrial and other catchments to a large pump station, NVL040. NVL040 captures
flow from all catchments to the west of Eenie Creek and conveys flow via a 450 mm diameter rising main to
the Noosa Heads STP.




QIC Noosa Civic Pty Ltd                                 Version 1                                  November 2014
engineering report_final.docx                                                                            Page iii

Section 7

Noosa Civic
Engineering Report



NVL011 is located to the south of the existing Noosa Civic along Rene Street. The 2013 Cardno report noted
the capacity at NVL011 is limited. The NVL011 catchment has projected growth of approximately 2,060EPS
to 2,900EPS (+840EP). Current capacity of the installed pump units is approximately 34L/s (or 2,797EPS).
The Noosa Civic expansion will include an additional 350 EP. It is not expected the inclusion of the proposed
expansion will significantly impact the operation of NVL011.
Review of the 2013 Cardno report referenced above indicated the Noosa Coastal catchment has limited
capacity for growth within the zone. However, the downstream trunk network has capacity. It is noted that
Unitywater has previously advised that the Noosa heads STP is operating within its licence limits and has
capacity to accommodate growth within the existing catchments, up to Planning Horizon 2015. Beyond 2015
it is expected a programmed augmentation will enable further capacity.
In conclusion, the analysis and our understanding of the network supports the finding that sufficient capacity
exists within the existing water supply and sewerage service networks to cater for the expansion of Noosa
Civic. It is recommended that further detailed analysis be undertaken to confirm the network capacities and
infrastructure requirements to service the expansion and any impact on the network external to the proposed
expansion.




QIC Noosa Civic Pty Ltd                            Version 1                                     November 2014
engineering report_final.docx                                                                          Page iv

Section 8

Noosa Civic
Engineering Report




3                    Electricity Supply
The proposed development is within the Energex electricity distribution area. Based on the area of the
proposed development, the maximum demand for the proposed development will be approximately 3-4MVA.
Therefore, approximately four 1MVA 11kV/400V transformers will be required to serve the proposed
development. Since the maximum demand is over 1MVA, Energex will require the site to connect via the
Energex Large Customer Connection process. There is an Energex pre-feasibility enquiry form that can be
completed to determine the impacts on existing Energex infrastructure. This enquiry will be undertaken at an
appropriate time prior to planning approval being granted.
Based on a desktop audit of the DBYD Energex maps, it seems that conduits have been installed in the
current Noosa Civic centre for future electricity cabling to serve the proposed development (see sheets 4 & 5
in the attached Figure 1). Potentially there is scope to take an 11kV supply from the existing transformer
SG765138, and reticulate through existing conduits to serve new 11kV transformers as required for the
proposed development. If the existing 11kV reticulation in the area is close to its maximum loading, a new
11kV circuit may be required from a 33/11kV distribution substation. The closest distribution substation is
located on Eumundi Road approximately 1.3km from the proposed development site.
Based on this desktop audit, there are no major issues in providing electricity to the site, subject to
confirmation from Energex.
Discussions on the project have commenced with Energex, but no formal response has yet been received.




QIC Noosa Civic Pty Ltd                           Version 1                                     November 2014
engineering report_final.docx                                                                         Page v

Section 9

Noosa Civic
Engineering Report




4                    Geotechnical and Acid Sulfate Soil Issues
A detailed sub-surface geotechnical investigation was completed by Golder Associates prior to the
development of the existing Noosa Civic site in August 2004 (Report on Geotechnical Investigation – Noosa
Business Centre – Stage 1, Golder Associates Pty Ltd, August 2004). 21 test pits and boreholes with depths
varying from 2.50 to 5.00 m were excavated across that part of the site west of the OS7 area. The results for
the testing showed a consistent profile across the area of investigation, with silty and clayey sand at the
surface generally overlying silty and sandy clays grading at depth into low strength sandstones. A copy of
the previous report in included herein as Appendix A.
GA15, GA11, GA17 and GA18 are located generally close to the western boundary of the proposed
development. The logs for each of these test pits show consistent stratigraphy with sands overlying sandy
clays. No evidence of sandstone was found in these eastern pits which were excavated to depths of 2.50 to
3.00 m. Test pits GA11, GA17 and GA18 were terminated at levels of 3.50, 2.00 and 1.50 m AHD
respectively.
At this stage, no test pits have been dug on the development area, since to do so will require significant
removal of vegetation and other land disturbance. However, surface investigation provides no sign that sub-
surface conditions will vary from that found on the western part of the Noosa Civic site. Golder Associates
concluded that all materials should be excavatable using conventional earthmoving equipment, and that the
sand and clays soils won by excavation would be suitable for reuse as structural fill. It is noted that the
extent of fill required for the development is significantly less than on the western part of the Noosa Civic site,
primarily because of the presence of the undercroft carpark. A significant volume of material excavated from
the site will need to be disposed of as spoil external to the project.
It is proposed that a level of geotechnical investigation to confirm the above findings will be undertaken prior
to the commencement of construction. This will include excavation of test pits across the site east of OS7.
Golder Associates also undertook an acid sulfate soils investigation for the existing Noosa Civic site (Section
7 of the Geotechnical Investigation Report). According to acid sulfate soil mapping prepared by the
Department of Natural Resources, the site is defined as “land >5 m AHD with a low to negligible probability
of ASS occurrence”. Both field and laboratory tests were undertaken on soil samples collected from test pits
GA17 and GA18, albeit at levels below 5.0 m AHD. It was determined that there was negligible probability
for the occurrence of Potential Acids Sulfate Soils (PASS) on the site, which was expected since the tested
layers were above the water table level, i.e. soils on the site are likely to have already been oxidized by
exposure to the atmosphere. Correspondingly, the soils displayed slight actual acidity. Surface soils in
these tests (at 5.0 m AHD) required a minimal liming rate of about 5 kg of lime per tonne of soil. The
proposed floor level of the undercroft carpark is 5.5 m AHD. Allowing for excavation for concrete slab
construction purposes, the minimum level of excavation generally over the site will therefore be
approximately 5.2 m AHD. There will be a small basin adjacent to the undercroft carpark associated with a
stormwater detention and bio-retention basin that will include excavation below 5.0 m AHD. The State
Planning Policy for Queensland specifies that acid sulfate investigations should be undertaken where
disturbance takes place below 5.0 m AHD, and the volume of excavation is at least 100 m 3. In this case, the
volume of excavation below 5.0 m AHD is likely to exceed 100 m 3, and an acid sulfate soils investigation will
therefore be required.
It is noted that the previous testing was undertaken at a time when no distinction was drawn between sulfidic
and organic acidity. The source of the actual soil acidity in this case is not known, but may in fact be organic
since no sulfur content was detected during testing.
Council’s Planning Scheme (Natural Hazards Overlays Code) also requires acid sulfate soils assessment
when earthworks are undertaken below 5.0 m AHD. Given the small area of disturbance in the proposed
detention basin (see Figure 2) the requirement for acid sulfate soils investigations will be relatively minor. In
addition, it is unlikely that extensive treatment of acid sulfate soils will be required because of the low acid
generating capacities of the existing soils. These investigation works will be undertaken prior to
commencement of any earthworks on site after relevant site clearing has taken place.


QIC Noosa Civic Pty Ltd                              Version 1                                       November 2014
engineering report_final.docx                                                                              Page vi

Section 10

Noosa Civic
Engineering Report




5                    Groundwater
Previous geotechnical assessment across the site (Report on Geotechnical Investigation – Noosa Business
Centre – Stage 1, Golder Associates Pty Ltd, August 2004), particularly on the eastern boundary of the
existing development, disclosed no presence of groundwater down to levels of 1.5 m AHD. Given that the
plans for the proposed development require earthworks down to 5.2 m AHD, it is expected that groundwater
issues will not be significant during the construction phase of the project.
It is expected that the presence or otherwise of groundwater on the development site will be determined
during the geotechnical investigation proposed for that area prior to commencement of construction.
However, existing information indicates that it is quite unlikely that groundwater will be encountered during
the construction phase.




QIC Noosa Civic Pty Ltd                           Version 1                                     November 2014
engineering report_final.docx                                                                         Page vii

Section 11

Noosa Civic
Engineering Report




6                    Construction and Earthworks Management Plan
This project will be constructed using standard construction materials and methods. The first stage of the
project will involve the clearing of vegetation across that part of the site designated for development.
Suitable erosion and sediment control measures (see the Erosion and Sediment Control Plan, Appendix C)
should be implemented on site prior to removal of vegetation.
It is proposed that that the part of site designated for earthworks is be stripped and cleared in one stage.
However, it is noted that various stands of native vegetation on the site are to be retained, and it is important
that the Construction Management Plan recognise this so that appropriate measures are adopted to protect
this vegetation. It is proposed that areas of vegetation to be retained be fenced off from other areas so that
there is a physical barrier to prevent damage/destruction of this vegetation during the construction phase.
Areas of vegetation to be retained are shown on drawing no J13041-CI-C02.
Prior to the commencement of earthworks, any topsoil will be stripped and removed from the construction
area. An average stripping depth of 200 mm should be achieved to allow removal of any organic material in
the surface layer. Large tree roots may require selective removal during site preparation.
Earthworks are expected to be undertaken using conventional equipment such as scrapers, large excavators
and trucks.
Fencing is to be installed prior to any earthworks commencing on the site to ensure that the covenant area
remains unaffected by construction activity. It is noted that some minor earthworks associated with road
construction will batter down into the covenant area at its southern end (see drawing no J13041-CI-C03). It
has been confirmed by expert site inspection that these works will not have a detrimental impact on any
existing vegetation of high value.
Earthworks construction will minimize dust emissions off-site by reducing earthwork activity during periods of
high winds, and ensuring that an on-site water cart is available at all times. A Construction Environmental
Management Plan has been prepared to control site activities during the construction phase and is included
as Appendix B.
A detailed Erosion and Sediment Control Plan is shown on drawing no J13041-CI-C05.
The preliminary earthworks for the site are shown on drawing nos J13041-CI-C03 and C04.




QIC Noosa Civic Pty Ltd                             Version 1                                      November 2014
engineering report_final.docx                                                                           Page viii

Section 12

Noosa Civic
Engineering Report




7                    Stormwater Management Plan
A Stormwater Management Plan (see Appendix D) has been prepared to support the proposed Noosa Civic
expansion. The key findings of the investigation are detailed below.
            Regional Flooding
The Regional flood and storm tide mapping indicates that the proposed development will be above the
regional flood events.
            Stormwater Quantity
Without active mitigation, the proposed development is predicted to increase the peak rate of stormwater
runoff from the site. Various detention basins utilising the surface car park areas and at the south-western
corner of the site have been formulated to mitigate these increases in flow, as shown in Figure 2. Based on
this analysis (see Appendix D), sufficient storage volume is available to adequately mitigate peak rates of
stormwater discharge flows from the site. No adverse flooding impacts will occur external to the site.
            Stormwater Quality
It will be necessary to treat runoff from the site to satisfy the water quality objectives defined by the State
Planning Policy (DSDIP, July 2014) and Noosa Shire Council (Water Sensitive Design Code).
Modelling of two approaches for the treatment of runoff was completed using the industry-standard MUSIC
software.
o            Bio-basin Treatment
For this scenario, runoff from the entire site was considered to be treated by a series of bio-retention systems
as shown on Figure 3.
o            Water Re-use Tank and Bio-Basin Treatment
For this scenario, a 300 kL rainwater tank capturing runoff from roof surfaces for suitable re-use purposes,
with the remaining water to then be treated by bio-basins to the required standards, was considered.
Both treatment scenarios were found to satisfy the applicable water quality objectives. A decision will be
made at detailed design in relation to the solution to be ultimately adopted.
Given the results obtained with respect to stormwater quality and quantity, it is considered that the site can
be developed from a stormwater management perspective without producing unacceptable impacts.




QIC Noosa Civic Pty Ltd                             Version 1                                     November 2014
engineering report_final.docx                                                                           Page ix

Section 13

Noosa Civic
Engineering Report




Noosa Civic




FIGURES




Figure 1 Electricity Reticulation
Figure 2 Detention Basins
Figure 3 Bio-retention Basins




QIC Noosa Civic Pty Ltd             Version 1   November 2014
engineering report_final.docx                          Page i

Section 14

PAPER SIZE A3

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on ft (EX shall ontacted immediately.

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

 

 

 

 

For Emergency Situations
Please call 18 19 62

 

 

UNCONTROLLED COPY

eet ey

energex

GIS
DBYD

Date: 20 Aug 14 Time: 13.52.59
Requested By: DBYD

NOT TO SCALE

250m

Enquiry No: 41126703
KEY MAP

Enquiry Area

 

 

LOCALITY DIAGRAM
5D
{v0 5
re ©
( \
NOOSAVILLE _ m=
-
/
—

7

 

PAPER SIZE A3

 

 

Section 15

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately.

4700

4800

For Emergency Situations
Please call 13 19 62

4900

 

8600

707 500m N

7
4

  
 

P2086s4i f

\ }

\ SK

\ 40
504700m

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

 

       
  
   
   

   

P20591 B4A a
S
=F

4800

P1417227 ere)
Tt~
@ ~
/
/

N P14229

8600

      

/ OS

eo -~
s) ~ pidit228
fs

 

<3/ Fragees

8500

 

UNCONTROLLED COPY

att
. os
=o

“VD
energex
GIS

DBYD

Date: 20 Aug 14 Time: 13.53.11
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 1

—-+ Cable Voltage

A Ground Transtormer less Than 33k
Cubicle Transformer Mi Cable Voltage
33kV or Higher
t= Ring Main Unit
@) Metering Unit © Direer-Lay
Wi Link Pillar Q. Conduit
[Service Pillar Multi-Section
Junction Pillar Duct
. ”\ Trench
J Pit —
mi Cable Joint Cable Tray
b> Cable Termination LE] Tunnel
Cable Marker
x} Street Light Pole
li Earth
Works Order
Polygon

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCALITY DIAGRAM

i~ a 5

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 16

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately.

5000

8600

   
   
    
     
       

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented

5100

  

5200

    
 

For Emergency Situations
Please call 13 19 62

8600

att
. os
=o

“VD
energex
GIS

DBYD

Date: 20 Aug 14 Time: 13.53.51
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 2

Cable Voltage

(A Ground Transformer ~~ Less Than 33k
Cubicle Transformer Mi Cable Voltage
33kV or Higher
t= Ring Main Unit
@) Metering Unit © Direer-Lay
Wi Link Pillar Q. Conduit
[Service Pillar HH Multi-Section
Junction Pillar Duct
. ”\ Trench
J Pit —
mi Cable Joint Cable Tray
b> Cable Termination LE] Tunnel
Cable Marker
x} Street Light Pole
li Earth
Works Order
Polygon

 

 

8500

 

 

 

 

 

 

[sla] s|
6 | 7 | 8
9 | 10

 

 

 

 

 

 

 

 

 

 

|

 

 

 

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

 

®
I~ P1431853
-s-=
/ e|
<
o*
oc
iano8 -- P454797
- =--|
e |
SN B|
XS Ye ea
@ /
/
p45A798
I
z l
§ \
0
z \ @ // I
s \ ON A I
N p4p4zs9
P§417230 5 P1422629
\ OY * ro U76)292
SQ L_
co SA \
P1422994 ~nL \ \
Pro ~~ _Pa5a791 \ |
/ \\
81422627
S&S (So
P1422627-A, go SSO /
\ fe)
Se Se 2 ?
8Q95000m E 5100

5200

UNCONTROLLED COPY

 

LOCALITY DIAGRAM

\ 5
A
ao

 

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

Section 17

 

 

 

 
 

     
     

 

  

 

  

 

 

 

 

 

504600m

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

 

PAPER SIZE A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is not represented For Emergency Situations oon:
on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately. Please call 13 19 62 aces, yy
4600 4700 4800 ; V4
77 PROBS 151-4 P2059157-A energex
4
} \ GIS
P2086861, | DBYD
-* | SS P2059154-A — | Date: 20 Aug 14 Time: 13.54.30
Se a Requested By: DBYD
— - SCALE 1:1000
20 Oo 20m
Enquiry No: 41126703
STRIP No: 3
—- Cable Voltage
(Al Ground Transformer Less Than 33k
Cubicle Transformer WU Gable rege .
8400 ———} 8400 fm Ring Main Unit
@) Metering Unit © Direer-Lay
wv Link Pillar O Conduit
I [Service Pillar Multi-Section
ay Duct
I Junction Pillar
. ”\ Trench
I [| Pit —
I mi Cable Joint Cable Tray
| b> Cable Termination LE] Tunnel
I “Cable Marker
! <4 Street Light Pole
| li Earth
Works Order
| Polygon
I
I
I
I
I
I
2 I a
= I 5S A —
8 oe
co r —/
5 I
I #300 INDEX TO SHEETS
$G765139
‘ Ts
\ 3 | 4 |
© \
OQ 7
Keo \
‘ \ 9 | 10
‘ [1 |
\ 11
\ LOCALITY DIAGRAM
\ & ----7-> pa
\ aa SG765187 ie 3
o 6 > |
20 \
prOseMs-a uyes145_ oO ;? CO .
= XN NOOSAVILLE >
a\ O XN /
4700 4800 ? (
SN 7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNCONTROLLED COPY

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

Section 18

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

4900
P2059757-A | S|

 

_— | ~

p91 cA ~ NC .

—— Nn

8400 |}

707 8300m N

 

5000
P1422988
oN
N
@

ON

    
 

P1422627-A

For Emergency Situations
Please call 13 19 62

5100

8400

Lt

o> yea On@age

[]

Rees

SgQyD
energex

GIS
DBYD

Date: 20 Aug 14 Time: 13.55.02
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 4

Cable Voltage

Ground Transformer Less Than 33k

Cubicle Transformer ™@™ Cable Voltage
33kV or Higher
Ring Main Unit

. . @  Direct-Lay
Metering Unit Cable

Link Pillar Conduit

O

Service Pillar HH Multi-Section

Junction Pillar Duet

’ Trench

Cable Tray
Cable Termination LE] Tunnel
Cable Marker

Pit

Cable Joint

Street Light Pole
Earth

Works Order
Polygon

 

 

‘8300

INDEX TO SHEETS

 

1 2
34 5 |

6 | 7 | 8
9 | 10

[|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

894900m

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

 

5000

5100

 

UNCONTROLLED COPY

LOCALITY DIAGRAM

\ 5
Ns
C

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 19

PAPER SIZE A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is not represented

 

on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

5200

5300

    

9 ~ P1422624
8400 | ~ ©
s, ey

  

   
  
   

Braaze2t

oy of
——/

707 8300m N
-”

 

©
P1422613

—

 

 

niszaaean
805200m £

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the

accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

5300

 

 

5400

5400

For Emergency Situations
Please call 13 19 62

8400

8300

o> yea On@age

Lt

[]

alee
*

SgQyD
energex

GIS
DBYD

Date: 20 Aug 14 Time: 13.55.31
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 5

Cable Voltage

Ground Transformer Less Than 33k

Cubicle Transformer ™@™ Cable Voltage
33kV or Higher
Ring Main Unit

Direct-Lay

. . e
Metering Unit Cable

Link Pillar Conduit

O

Service Pillar FA Malti: Section
Junction Pillar Duet

Pit a ’ Trench
Cable Joint || Cable Tray
Cable Termination LE] Tunnel
Cable Marker

Street Light Pole

Earth

Works Order
Polygon

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNCONTROLLED COPY

 

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

Section 20

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

For Emergency Situations
Please call 13 19 62

 

 

 

 

  
   
  
   
  

 

   

  

 

 

 

4600 4700 4800
r v
\ \
@Q \ O =-
r@2_ MN \ % --oocT™
\<% L $G765187
; 2 ©
A o &0 \
Gs 9145-0 Uves145_ = c /
7 \
XL
4 oS \
\
\
\
P2059138-A \
\
\ \
\ /
8200 \ 7 8200
\ > ¥
P2059137A 4% /
7 u765iéo.
SA
s
SA
SA
S
42
N
y2059120-A
2 P2059140-A
3
0
z
2
8100
504600m 4700 4800

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

UNCONTROLLED COPY

alee
*

SgQyD
energex

GIS
DBYD

Date: 20 Aug 14 Time: 13.56.06
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 6

Cable Voltage
Less Than 33k

A Ground Transformer

Cubicle Transformer ™@™ Cable Voltage

33kV or Higher
fm Ring Main Unit

@) Metering Unit © Direer-Lay
wv Link Pillar Conduit

O
[Service Pillar Multi-Section
Junction Pillar Duct

’ Trench

Cable Tray
b> Cable Termination LE] Tunnel
“Cable Marker

J Pit

ms = Cable Joint

Street Light Pole
Ig!
il Earth

Works Order
Polygon

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCALITY DIAGRAM

\ 5
Ns
C

/- . \
NOOSAVILLE _ a

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 21

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

4800

For Emergency Situations
Please call 13 19 62

 

 

 

 

 

 

 

4900 5000 5100
pee"?
\
/
N\
N
N
|
\
\
\
\
\
/
8200 | ————~] 8200
2
s
re)
6K
8
| 8100
50.4800m 4900 5000 5100

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

UNCONTROLLED COPY

 

energex

DBYD

Date: 20 Aug 14 Time: 13.56.41
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 7

Cable Voltage

A Ground Transtormer less Than 33k
Cubicle Transformer Cable Voltage
33kV or Higher
t= Ring Main Unit
@) Metering Unit © Direer-Lay
wv Link Pillar O Conduit
[Service Pillar Multi-Section
Junction Pillar Duct
. ”\ Trench
J Pit —
mi Cable Joint Cable Tray
b> Cable Termination LE] Tunnel
Cable Marker
x} Street Light Pole
li Earth

Works Order
Polygon

[]

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 22

 

 

 

  
 

 

   

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PAPER SIZE A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is not represented For Emergency Situations oon:
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately. Please call 13 19 62 aces, Dp
5100 5200 5300 5400 f WZ
energex
GIS
Date: 20 Aug 14 Time: 13.57.06
Requested By: DBYD
ALE 1:1
, P1422609. 20 SC 0 000 20m
Q oe
Enquiry No: 41126703
STRIP No: 8
—- Cable Voltage
7 | e200 (Al Ground Transformer Less Than 33k
Cubicle Transf Cable Voltage
ubicle Transformer WE ORV or Higher
fm Ring Main Unit
@) Metering Unit © Direer-Lay
wv Link Pillar O Conduit
[Service Pillar Multi-Section
Junction Pillar Duct
. ”\ Trench
J Pit —
|
| mi Cable Joint Cable Tray
| > Cable Termination [| Tunnel
| * Cable Marker
| x} Street Light Pole
li Earth
Works Order
Polygon
P1442606
2
—
8
0
5 —
~*~ }———_ ——— 8100
INDEX TO SHEETS
1 2
[34] 5]
6 7
9 10
11
LOCALITY DIAGRAM
OD
{v0 ‘
P1422604 CO a
7
F ( Lay
I NOOSAVILLE \
| L | >)
5Q05100m E 5200 5300 5400 [{
This it ides details of the ENERGEX electrical network. A. jiatic ist ibility is it sd by ENERGEX for thi 7
recuracy or completeness ofthe information proved. ect postions of cables ond ooctrical conneatviy should ba santrmed onsite. UNCONTROLLED COPY ae
PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 23

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented

on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

8000

707 7900m N

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

4800

4900

5000

For Emergency Situations
Please call 13 19 62

 

 

  
 

\ P2059143-A
059121-A

)

oe

————} 8000

———} 7300

P1428

 

 

 

504800m E

4900

5000

UNCONTROLLED COPY

 

 

DBYD

Date: 20 Aug 14 Time: 13.57.37
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 9
—+ Cable Voltage
Ground Transformer lass Than ook
Cubicle Transformer Cable Voltage
33KV or Higher
Ring Main Unit
Metering Unit © Direer-Lay

Link Pillar OQ) Conduit

VU

Multi-Section
Junction Pillar Duet

| ”\ Trench

Pit

Cable Joint Cable Tray
Cable Termination LE] Tunnel

“Cable Marker

h
v
[1 Service Pillar
a

(
=

>

x} Street Light Pole

li Earth

Works Order
Polygon

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

—~

i / S

C - a
ve &
NOOSAVILLE \
> /
{i ¢

ND

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 24

PAPER SIZE A3 Map has been designed to be reproduced in colour

5200

5300

For Emergency Situations —
Please call 13 19 62 want ee
“VW
energex
GIS

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented

on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.
5100

   
  

   

8000 ;——

2 oo

5 —

2 P1422597

7 j - \

!
Pig 2590 \
-

/
7 P1422592
——

P1422589

®

/
P1422593

e

/
tings
my

 

   

/
wl Ff,
I |
!

I
I
P1422604

P

 

I
!
I
I
!
|

J

P1422603

 

P1422598
ny

F

   
 

DBYD

Date: 20 Aug 14 Time: 13.58.02
Requested By: DBYD

SCALE 1:1000

° 20m

20

 

Enquiry No: 41126703

STRIP No: 10

7 8000
Cable Voltage
Less Than 33k

(A Ground Transformer
Cubicle Transformer | Cable Voltage
33kV or Higher

tm Ring Main Unit
© Direct-Lay

@) Metering Unit Coble
Wi Link Pillar QO Conduit
[Service Pillar Multi-Section
Junction Pillar Duct
’ Trench

[| Pit
ma Cable Joint Cable Tray

b> Cable Termination [| Wanner

“Cable Marker
x} Street Light Pole

li Earth

Works Order
Polygon

7300

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| | 16 ‘N yo
| SS P142 of
L J se Xe
1422581 a=
ey
K
XN }
Z x >)
5Q5100m £ 5200 5300 {
This output provides details of the ENERGEX electrical network. As variations may exist no responsibility is incurred by ENERGEX for the UNO \OLLED (COPY NL DS
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site. ) \ \ -
PAPER SIZE A3 Map has been designed to be reproduced in colour

 

Section 25

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.

For Emergency Situations
Please call 13 19 62

 

4900 5000 5100 5200
| [Be ‘ f42d504
| GO
| N
1118 \ ¢

7800

707 7700m N

 

 

ill

P1422588

    

——— 7800

———} 7700

 

 

504900m E 5000

This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.

5100

5200

UNCONTROLLED COPY

alee
*

SgQyD
energex

GIS
DBYD

Date: 20 Aug 14 Time: 13.58.36
Requested By: DBYD

SCALE 1:1000

20 ° 20m

 

Enquiry No: 41126703

STRIP No: 11

Cable Voltage

(A Ground Transformer ~~ Less Than 33k
Cubicle Transformer Mi Cable Voltage
33kV or Higher
t= Ring Main Unit
@) Metering Unit © Direer-Lay
Wi Link Pillar Q. Conduit
[Service Pillar HH Multi-Section
Junction Pillar Duct
. ”\ Trench
J Pit —
mi Cable Joint Cable Tray
b> Cable Termination LE] Tunnel
Cable Marker
x} Street Light Pole
li Earth
Works Order
Polygon

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

 

 

LOCALITY DIAGRAM

AN a

fo a
Ce \

NOOSAVILLE \

Co

7

 

PAPER SIZE A3 Map has been designed to be reproduced in colour

 

 

Section 26

Noosa Civic Shopping Centre Development
Stormwater Management Plan




 Cardno All Rights Reserved 2014.                                                                                                 Scale 1:1,250 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media,
to any person other than by agreement with Cardno. This document is produced by Cardno
solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno
                                                                                                                                     FIGURE 2
                                                                                                       Concept Stormwater Quantity Management
does not and shall not assume any responsibility or liability whatsoever to any third party arising
out of any use or reliance by third party on the content of this document.
Aerial imagery courtesy of Nearmap, 2014




QIC GLOBAL REAL ESTATE

Section 27

Noosa Civic Shopping Centre Development
Stormwater Management Plan




                                                                       RUNOFF                          RUNOFF
                                                                         FLOW                          FLOW

                        EXTENDED DETENTION 200 mm
                        DEPTH                                                                                   WHEEL STOP

                        FILTER MEDIA                                         400 mm


                        TRANSITION LAYER                                     100 mm

                        DRAINAGE LAYER                                       200 mm




 Cardno All Rights Reserved 2014.                                                                                                                      Scale 1:1,250 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media,
to any person other than by agreement with Cardno. This document is produced by Cardno
solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno
                                                                                                                                                          FIGURE 3
                                                                                                                             Concept Stormwater Quality Management
does not and shall not assume any responsibility or liability whatsoever to any third party arising
out of any use or reliance by third party on the content of this document.
Aerial imagery courtesy of Nearmap, 2014




QIC GLOBAL REAL ESTATE

Section 28

Noosa Civic
Engineering Report




Noosa Civic




APPENDIX



A
Geotechnical Report




QIC Noosa Civic Pty Ltd         Version 1   November 2014
engineering report_final.docx                      Page ii

Section 29

A.B.N. 64 006 107 857

Golder Associates Pty Ltd €. A A Golder
Associat

Unit 1 Dalton Centre, Newspaper Place, Maroochydore, Qid 4558 Australia
(PO Box 5569, Maroochydore BC, Qld 4558 Australia)
Telephone (07) 5443 3511

Fax (07) 5443 6645
http:/Awww.golder.com
REPORT ON
GEOTECHNICAL INVESTIGATION
NOOSA BUSINESS CENTRE —~ STAGE 1
EENIE CREEK ROAD
NOOSAVILLE, QUEENSLAND
Submitted to:
Stockwell Building & Developmient
PO Box 3144
SOUTH BRISBANE QLD 4101
DISTRIBUTION:
2 Copies - Stockwell Building & Development (Mr Tony Stevens)
2 Copies - MPN Consulting Pty Ltd (Mr Rick Godfrey)
1 Copy - Golder Associates Pty Ltd
August 2004

1 bound & 1 CD
1 bound & 1 CD

04682104(AB)

Section 30

a

August 2004 -i- 04682104(AB)

TABLE OF CONTENTS

 
 
 
 
 
   
  
  
 
 
   
  
 
  
 

SECTION PAGE
1.0 INTRODUCTION
2.0 SITE DESCRIPTION
3.0 PROPOSED DEVELOPMENT tee
4.0 METHOD OF INVESTIGATION ”
4.1 Preliminary Assessment...
4.20 Field Work.......seccsssssssssessssssssssssssessssssssseseece.
4.3 Laboratory Testing ......cccccssssecssesseesesecoeeess.
5.0 INVESTIGATION FINDINGS.
5.1 Preliminary Assessment
5.2 Subsurface Conditions ......secssssiseiessnsnsastrtustvusteneccn.,
5.3 Results of Geotechnical Laboratory Testing ..........ccsscccscsssssscssssessseseoses
6.0 GEOTECHNICAL ASSESSMENT...
6.1 Earthworks...
6.1.1 Site Preparation................
6.1.2 Excavation...
6.1.3 Filling...
6.1.4 Pond Construction.
6.1.5 Batter Slopes..........
6.2 _ Retaining Structure Design
6.3 Preliminary Footing Design
6.4 Preliminary Pavement DESIGN oo. ceesssescessececueseeccuseecens
6.5 GOMerAl ooo eeeccccesssssssssseeeesseccssssessisessnstenscsssesessessssesess.
7.0 ACID SULFATE SOILS... sssssssstocttiesiinesinntiviinen
7.1 Investigation AIMS .......ssecssssssesssseesnsstesssinnsttiusasssieeeccc..
7.2 Soil Sampling ......cccccecsescssecsssccseeseeesees.
7.3 Field pH (pH) and Peroxide PH (pHrox)...
7.4 Summary of Soil Analysis Results.....
7.5 ASS Extent and Severity ....00....
7.6 Recommendations
8.0 IMPORTANT INFORMATION

 

Golder Associates

 

Section 31

August 2004

-ii- 04682104(AB)

 

LIST OF TABLES

Table 1
Table 2
Table 3

LIST OF FIGURES

Figure 1
Figure 2
Figure 3

Retaining Structure Design Parameters
Preliminary Pavement Design Parameters
ASS Action Criteria

Site Plan
Section A-A
Section B-B

LIST OF APPENDICES

Appendix A

Appendix B
Appendix C

Appendix D

Reports of Test Pits & Boreholes

Explanation of Notes, Abbreviations & Terms Used on Borehole and
Test Pit Reports

Method of Soil Description Used on Borehole and Test Pit Reports
Terms for Rock Material Strength & Weathering and Abbreviations
for Defect Descriptions

Table B1 — Summary of Geotechnical Laboratory Testing
Geotechnical Laboratory Test Results

Table Cl — Summary of ASS Testing

Environmental Laboratory Test Results (Soil)

Important Information About Your Geotechnical Engineering Report

Golder Associates a

 

Section 32

August 2004 -1- 04682104(AB)

 

1.0 INTRODUCTION

This report details the results of a geotechnical and acid sulfate soil (ASS) investigation
undertaken for Stage 1 of the proposed Noosa Business Centre at Eenie Creek Road, Noosaville
(‘the site’).

The investigation was carried out for Stockwell Building & Development and MPN Consulting
Pty Ltd (MPN) are the consulting engineers for the project. The proposed development includes
substantial cut and fill earthworks together with construction of commercial buildings and
pavements for car parking and access roads.

The ASS component of the investigation was undertaken in order to assess the extent of ASS
below RL 5 m AHD in the southern part of the site which may be at risk of disturbance.

This report details the results of the investigation and includes geotechnical advice regarding
earthworks, footing design, retaining walls and pavements together with recommendations
relating to the extent and management of ASS.

2.0 SITE DESCRIPTION

The site is described as Lot 2 on SP 110885 and the Stage 1 area is 15.47 ha. The site is
bounded to the north and north-east by Eenie Creek Road and the road reserve for Walter Hay
Drive (currently a gravel track) respectively. There are existing commercial properties to the
east and the land to the south is currently vacant, being the proposed future stages of the Noosa
Business Centre development. .

At the time of investigation, the site was mostly covered by open dry forest with a dense
undergrowth of shrubs and saplings. An existing easement containing overhead power lines _
along part of the western site boundary had been recently cleared. The north-western comer of
the site contained a disused borrow pit across which excavations appear to extend up to about
3 m below the previously existing ground level. Low strength sandstone was exposed across
the floor of the borrow pit area at a number of locations.

The site surface falls from a low ridge in the northern part of the site (maximum RL 12 m AHD)
down towards the site boundaries at ground slopes ranging between about 1° and 3°. The south-
eastern and south-western site boundaries approximately trace drainage paths that direct surface
water towards the south, where the ground surface falls below RL 5 m AHD. There are some
confined cut batter slopes in the borrow pit area with gradients of up to about 20°.

Ground surface contours and the proposed development layout are shown in Figure 1, Site Plan.

Golder Associates

Section 33

August 2004 -2- 04682104(AB)

 

3.0 PROPOSED DEVELOPMENT

A drawing showing the proposed development layout and site profiling plan for Stage 1 has
been provided to us by MPN (Dwg. No. 4024, 55, Rev. B). We understand that the proposed
bulk earthworks will include cutting up to about 3.5 m depth across the northern ridge and
filling around the perimeter to depths of up to about 3 m. The finished surface level across the
site will range between about RL 6 mand RL 10 m AHD.

The proposed buildings will comprise low-rise structures located primarily in cut around the
northern part of the site and on a fill platform around the southern part. We understand that
Tetaining walls up to about 3 m in height may be constructed around the southern edge of the fill
platform. The central part of the site will contain pavements for car parking and access roads,
together with areas of landscaping. It is understood that excavations are proposed in the
southern part of the site (below RL 5m AID) to form detention basins / ponds.

4.0 METHOD OF INVESTIGATION
41 Preliminary Assessment

To assist with planning the level of detail required for the ASS component of the investigation a
desktop study was undertaken. ‘

The desktop assessment comprised a review of available published reports and plans on geology
and acid sulfate soil distribution. The findings from this preliminary assessment are presented in
Section 5.1.

4.2 Field Work

Eighteen test pits (designated GA1-18) and three boreholes (GA19-21) were conducted across ,
the site. The test pits were dug using a 6 tonne excavator with 350 mm toothed bucket, whilst
the boreholes were drilled using a 4WD-mounted flight auger rig. The test pits and boreholes
were generally extended to depths of between 3 m and 5 m, with the depth investigated
dependent upon the extent of cut or fill proposed at each location.

The ASS component of the investigation program was planned in accordance with State
Government policies! and legislation to cover the areas of significant filling and excavation
below RL 5 m AHD in the southern part of the site. The formulation of our scope of work is
discussed in Section 7.2,

 

' State Planning Policy SPP2/02 “Planning and Managing Development Involving Acid Sulfate Soils,

Golder Associates

 

Section 34

ro

oe

August 2004 -3- 04682104(AB)

 

Samples for ASS testing were recovered from test pits GA16 to 18 at 250 mm intervals to 3 m
depth. ASS sampling protocols in the field were conducted to minimise oxidation prior to
laboratory testing and followed the Queensland Sampling Guidelines’ October 1998 (Revision
4.0) of the “Guidelines for sampling and analysis of lowland Acid Sulfate Soils (ASS) in
Queensland 1998” produced by QASSIT (Queensland Acid Sulfate Soils Investigation Team).

In addition, disturbed and undisturbed (U50 tube) samples were recovered from the test pits and
boreholes for geotechnical laboratory testing (ref. Section 4.3).

Following positioning using a compass and tape survey from the flagged metes and bounds
boundaries, the approximate location of each borehole was recorded using a differential GPS
unit. However, due to the dense tree canopy, the GPS mapping was found to be inaccurate and,
consequently, the E / N coordinates have not been reported herein. It should be noted that each
test pit / borehole location was marked with a stake and flagging tape for later survey pick up,
which we recommend be undertaken, Reduced levels shown on the test pit / borehole report
forms have been interpolated from survey data supplied.

The fieldwork was carried out by a Senior Geotechnician on 21 and 22 July 2004.

Test pit and borehole locations are shown in Figure 1. Results of the fieldwork are presented in
the Reports of Test Pits & Boreholes in Appendix A, along with explanatory notes.

4.3 Laboratory Testing

Geotechnical classification testing was carried out on a number of the soil samples recovered in
accordance with the procedures described in AS 1289 “Method of testing soils for engineering
purposes”. The results are given in Appendix B and are summarised in Table Bl.

Tests to assess field pH and pH after oxidation (with 30% hydrogen peroxide solution buffered
to pH>4.5) were conducted as an initial screening procedure to help select samples for
laboratory analysis. A total of 36 pH>/pHrox tests were conducted on samples from test pits
GAI16-18.

Based upon our assessment of the pH test results, a total of 10 samples were tested at the
Highvale laboratory of Bio-Track for ‘Chromium’ suite of tests in accordance with the ASS
Method 23 laboratory procedures.

The ASS laboratory test reports from ALS are given in Appendix C and the results are
summarised in Table C1 (Appendix C). Observations and discussion on the laboratory findings
are given in Section 7.4.

 

? Guidelines for Sampling and Analysis of Lowland ASS in Queensland, Qid ASS Investigation Team
(QASSIT), Revision 4.0, October 1998.

Golder Associates

Section 35

August 2004 -4- 04682104(AB)

 

5.0 INVESTIGATION FINDINGS
5.1 Preliminary Assessment

Available geological information’ indicates that the site is underlain by the late Triassic to
Jurassic age Tiaro Coal Measures comprising sandstone, siltstone, shale and coal. Quaternary
age flood plain alluvium comprising “clay, silt, sand and gravel” is indicated to overlie this
formation along the drainage lines and across the low-lying land in the southern part of the site.

Published ASS information’ classifies the majority of the site as “/and > 5 m AHD with a low or
negligible probability of ASS occurrence”, whilst the southern part is described as “land < 5 m
AHD with a low probability of ASS occurrence” (all based upon a “limited field assessment’).

5.2 Subsurface Conditions

The subsurface conditions across the elevated ridge area typically comprise up to about 0.5 m
depth of mostly non-plastic sand, or low plasticity material, underlain by low to medium
plasticity, very stiff sandy clay. The depth of non-plastic sand increases up to about 1 m in the
southern part of the site.

Medium to high plasticity clays were intersected below the low to medium plasticity clays at all
of the test locations, except test pit GA7. It is anticipated that these medium to high plasticity
clays may be exposed at the proposed cut subgrade level at test locations GA9, GA10, GA12,
GA14, GA15 and GA20 (ie. mostly in the east and partly across the ridge).

The results indicate that between about 0.5 m and 1.5 m of medium to high plasticity clay is
likely to be intersected in proposed excavations at test locations GAS, GA6, GA12, GA13 and
GA19-21 (ie. mostly across the ridge).

Extremely weathered, extremely low strength sandstone was intersected below depths of about
1.5 m to 2.5 m at test locations GA2, GA4, GA6 and GA7 (ie. south-western part of site) and at
test locations GA19 and GA21 below 1.5 m to 4.5 m depth (ie. across the ridge). The sandstone
will probably be encountered in the proposed excavations in the vicinity of test locations GA6
and GA21, where excavator bucket refusal was noted at 1.7 m and 3 m depth respectively.

Low rates of ground water seepage were noted in test pits GA2-4 (ie. western part of site) at
depths of between 2.2 m and 2.7 m. Ground water was not observed at the other test locations.
Moist to wet soil conditions were noted from close to ground level down to depths of 1 m to
1.5 m in test pits GA2 and GA3. It should be noted that the fieldwork was carried out following
a prolonged period of relatively dry weather.

 

> 1:100,000 Geological Map, GYMPIE SPECIAL, Sheet 9445 & Part 9545, DME, 1999
* 1:100,000 Redcliffe to Teewah ASS Map 2, DNR, 1999

Golder Associates

Section 36

oa

August 2004 -5- 04682104(AB)

 

Based upon our experience with similar subsurface conditions, we anticipate that ground water
seepage will probably develop at the interface between the near surface sandy soils and
underlying clays during periods of heavy or prolonged rainfall. Some seepage may also be
encountered from sandy or gravelly zones within the clay and sandstone strata. Considering the
topography of the site, we anticipate that the rates of ground water seepage will probably be
greatest around drainage lines and the low-lying southern area, particularly where the depth of
surficial sand increases up to about 1 m depth.

Sections A-A and B-B shows the subsurface conditions encountered in selected test pits and
boreholes.

5.3 Results of Geotechnical Laboratory Testing

Full laboratory reports for the geotechnical testing are presented in Appendix B together with a
summary Table B1. In summary:-

> Four single point CBR tests (four day soak) indicate a range of 7-16%, the lower and higher
parts of the range being representative of medium and low plasticity soils respectively.

> Eleven Atterberg tests generally confirm our visual classifications of soil type and plasticity.
When combined with the results of percent fines testing, the Atterberg results indicate that
the high plasticity silty clay soils have high a Shrink-Swell capacity.

> Two Shrink-Swell tests returned values of 2.9% (high plasticity sandy clay) and 3.3% (high
plasticity silty sandy clay), being in the moderate Shrink-Swell range. Four Shrink-Swell
tests were originally proposed, however two were replaced with Atterberg Limits and
percent fines testing due to difficulties encountered on site in attempting to recover
sufficient undisturbed (U50) tube samples.

> Six Emerson Class tests conducted on the range of clay soils encountered at the site all
returned values of six (ie. non-dispersive soil).

> Insitu soil density was estimated by measuring the soil weight and volume in four
undisturbed tube samples. Values of 1.92 and 1.96 t/m? were recorded for two high
plasticity sandy clay samples, whilst values of 2.03 and 2.12 t/m? were recorded for two
medium plasticity sandy clays.

Golder Associates

Section 37

August 2004 -6- 04682104(AB)

 

6.0 GEOTECHNICAL ASSESSMENT
6.1 Earthworks
6.1.1. Site Preparation

Prior to any earthworks activities, organic rich topsoil must be stripped and removed from the
construction area. The test pits indicate trace (5%) or some (5-12%) root matter, together with
large tree roots, to depths of up to about 200 mm across the site. This organic matter is
generally coarse material contained within surface sands. Dependent upon the method of site
preparation employed, we believe that it should be possible to achieve an average stripping
depth of about 200 mm. Large roots will require selective removal during site preparation, in
conjunction with ‘grubbing out’ of stumps. Organic material must not be used in fill to support
any structural loads, however it may be used in landscaping areas.

It should be noted that firm clayey / silty soils were encountered in test pits GA2 and GA4 (ie.
western part of site near a drainage line) to depths of 0.2 m and 0.4 m respectively. At the time
of our investigation, these soils were noted to be moist. In this condition, the proposed filling
should be achievable without requiring any additional surface treatment.

However, following stripping, proposed fill areas should be proof rolled by several passes of a
heavy (minimum 10 tonne) vibrating compactor to densify loose, near surface sandy soils and
confirm suitable subgrade strength. Dependent upon the prevailing weather conditions at the
time of site preparation (ie. should earthworks commence following a period of heavy or
prolonged rainfall), it may be necessary to construct a ‘bridging layer’ over clayey / silty soils
that occur across the low-lying parts of the site. Such a ‘bridging layer’ could be necessary to
prevent wetting up and ‘heaving’ of the initial fill layers.

If necessary, we suggest that a ‘bridging layer’ could comprise the placement of geotextile filter -
fabric overlain by a minimum 200 mm thickness of coarse aggregate or clean sand having less
than 3% fines content. Alternatively, a geotextile filter layer may not be required if the clayey /
silty layer is removed altogether; ie. down to the upper interface of an underlying stiff (or
stronger) clay, if present at reasonable shallow depth.

6.1.2 Excavation

Our investigation results indicate that the proposed bulk excavations (ie. up to about 3.5 m
depth across the ridge) should encounter a shallow layer of sand overlying very stiff to hard clay
and extremely weathered sandstone. We anticipate that such materials should be excavatable
using conventional earthmoving equipment, possibly with the assistance of ‘ripper’ attachments
for excavations in the sandstone.

The investigation results indicate that ground water seepage may emanate from sandy zones
overlying, and interlayered with, the clay strata. The rate of ground water seepage will be

Golder Associates

Section 38

co

August 2004 -T- 04682104(AB)

 

dependent upon the prevailing weather conditions prior to, and during, construction. Care
should be taken with open excavations as any surface water that ponds on the site soils may
cause rapid softening.

We anticipate that ground water seepage should controllable by the installation of up slope
diversion drains (swales), and possibly shallow subsurface drains, graded to discharge away
from the work area and possibly temporary sump pumps. Any ‘wet’ areas should be
permanently drained and connected to external drainage outlet points.

In order to minimise potential shrink-swell soil movements beneath buildings and pavements
across the proposed fill areas, it would be prudent to separate sand and low to medium plasticity
sandy clay materials won from proposed excavations (generally upper 1 m of soil profile) from
the medium to high plasticity clay soils and then stockpile these materials separately. These
lower plasticity materials should then be placed in the upper layers of any fill. We suggest a
minimum 1 m depth cover of sand and / or low to medium plasticity materials in fill.

6.1.3 Filling

The sand and clay soils won from the proposed excavations should be suitable for re-use as fill
subject to placement in accordance with the following guidelines.

Other than for clay pond / basin liners (ref. Section 6.1.4), fill should be compacted at moisture
contents within the range of -2% to +0.5% of optimum moisture content for Standard
Compaction. Confirmatory testing must be carried out at regular intervals. Further details for
control and testing of fill are given in Australian Standard AS 3798-1996 “Guidelines on
Earthworks for Commercial and Residential Developments". +

Select fill should have a maximum particle size of 100 mm for an uncompacted layer thickness
of 200 mm and should be compacted by repeated rolling to achieve a dry density ratio of at least -
98% of the Maximum Standard Dry Density for cohesive soils, or 75% Dry Density Index for
cohesionless soils. ‘Level 1’ earthworks control in accordance with AS3798-1996 is
recommended.

In accordance with good construction practice, fill embankments should be ‘over built’ then
trimmed back to the well compacted material.

Subject to fill placement as specified above, we estimate that total long-term settlement of fill
platforms (up to about 3 m height) should not exceed 10 mm.

Based upon our experience with similar materials, we anticipate a bulking factor range of 0.95
to 1.05 for the fill. This bulking factor is a ratio of in situ soil density to compacted soil density,
at 98% Standard Compaction, and does not include allowance for handling losses (eg. from
wind and rain),

Golder Associates

Section 39

August 2004 -8- 04682104(AB)

 

6.1.4 Pond Construction

It is understood that stormwater ponds / basins will be constructed in the vicinity of the existing
drainage lines. Should bund walls be proposed, the walls should include a clay ‘core’,
preferably medium to high plasticity silty clay, compacted at moisture contents within the range
of -1% to +3% of optimum moisture content for Standard Compaction to achieve a dry density
ratio of at least 98% of the Maximum Standard Dry Density. In order to prevent shrinkage
cracking and leakage through the clay core, it is recommended that the core should be overlain
by a 600 mm to 800 mm cover of low plasticity material, including a ‘topsoil’ surface which
should be grassed. Areas likely to be subject to erosion may require additional protection using
appropriate ‘rock armour’ materials.

Where sand or low plasticity clay material is encountered in the walls or floor of pond
excavations, such material should be over-excavated and replaced with a low permeability clay
liner (preferably medium to high plasticity silty clay). The liner should be placed as a 300 mm
thickness loose layer and compacted in accordance with the specifications for pond clay core
construction, as described above. The use of a low plasticity cover. to prevent shrinkage
cracking should also be considered within, and above, the water level fluctuation zone around
the pond walls.

6.1.5 Batter Slopes

For short-term construction periods, excavated unsurcharged faces could be battered at 1V:2H
in the sand and 1V:1H in the clay. Flatter batters may be required if significant ground water
seepage is encountered. Permanent batters in the sand and natural clay / compacted clay fill
should not be steeper than 1V:3H and 1V:2H respectively, or supported by an engineer designed
retained structure (ref. Section 6.2) where steeper slopes are required.

6.2. Retaining Structure Design

Retaining structure design should be carried out using a triangular pressure distribution applicable
to the wall type (ie. active pressures for a cantilever wall or at rest pressures for a
propped/anchored wall) and based on the parameters in Table 1. The values in Table 1 assume
that the walls are fully drained and no allowance is included for construction loading, up-slope
foundation loadings, the effect of sloping ground, or backfill compaction stresses.

Golder Associates

Section 40

2

oN

August 2004 -9- 04682104(AB)

 

Table 1 — Retaining Structure Design Parameters

 

 

 

 

 

Retained Material Unit Friction Lateral Earth Pressure Coefficient

 

 

 

 

 

 

Weight Angle
(tim) | (Degrees)

 

 

 

 

 

 

K, Ky K,
Medium Dene Sand L7 34 0.3 0.5 3.5
Stiff a Stffer) Clay 18 27 0.4 0.6 2.6
: ee i : : * * * * *

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note:

*: Variable dependent upon the type of material used and the degree of compaction achieved.

Positive permanent drainage must be. installed behind retaining walls unless they are designed
for development of full hydrostatic pressures.

6.3 Preliminary Footing Design

The investigation results indicate that the soils in the proposed excavation area should mostly
comprise low to medium plasticity sandy clay and, therefore, the resultant site classification
across the cut areas should typically be ‘M’ in accordance with AS2870-1996. An ‘M’
classification should also be achievable across the fill areas subject to the placement of any high
plasticity soils at least 1 m below the finished fill surface level.

High plasticity clays may be exposed at the cut subgrade level in the eastern part of the site and
partly across the ridge, these areas being primarily where pavements are proposed.

Building loads were not available at the time of reporting, however we are advised that the
proposed development will comprise low-rise commercial structures. The advice given below
is based upon the anticipated order of building loads together with site conditions following
proposed bulk earthworks.

Following earthworks to form the proposed site profile, the exposed building subgrade should
comprise mostly very stiff (or stronger) natural sandy clay or compacted fill. Conventional high
level strip or pad footings founded at least 600 mm below the finished ground level in the very
stiff natural clay or compacted fill may be designed using a preliminary allowable bearing
pressure of 150 kPa, for resultant total settlements of less than 25 mm.

Golder Associates

Section 41

August 2004 -10- 04682104(AB)

 

o™.

Based upon the laboratory test results, footings for one or two storey residential style buildings
(eg. for offices) may be designed using a preliminary site classification of ‘M’ in accordance
with Australian Standard AS2870-1996 “Residential Slabs and Footings”.

Heavy column loads from buildings or wind-loaded pylons (eg. for signage) may require
support by piled foundations. Our investigation results indicate that the most suitable piling
option is likely to comprise bored piles which socket into very stiff to hard clay or weathered
sandstone.

The founding depth for such piles will be dependent upon building loads and the variability in
stratigraphy over the piling depth. For preliminary design purposes, bored piles founded in very
stiff natural clay may be proportioned in accordance with an allowable end bearing pressure of
400 kPa and allowable side adhesion of 30 kPa. These values assume that the pile bases are
cleaned of any loose or water-softened material and that there is intimate contact between the
pile shaft and foundation. Side adhesion should be neglected for the upper 1.5 m length of
socket (below ground level).

At the completion of bulk earthworks, it is recommended that Golder Associates should carry
out further investigation of the proposed building areas in order to confirm the advice given
above for conventional (ie. high level) footings. This would comprise inspection by an
experienced Geotechnical Engineer together. with borehole probing (4WD auger rig), DCP
testing and laboratory Shrink-Swell testing.

6.4 Preliminary Pavement Design

Design parameters for pavements will be dependent upon the ‘subgrade materials present after
earthworks and the type, depth and quality of new fill used to bring the site to design levels.
The test pit / borehole and laboratory test results from this site indicate that the subgrade
materials exposed/formed following earthworks may vary dependent upon the location. CBR -
values assessed from the results of this investigation, and from previous experience, are
provided in Table 2. It should be noted that these values assume that the subgrade is well
drained during construction and operation.

Golder Associates

Section 42

August 2004 -11- 04682104(AB)

 

Table 2: Preliminary Pavement Design Parameters

 

 

 

 

 

 

 

 

Subgrade Material Type’ | _—- Design CBR (%)
Imported Select FILL) 5-15
SAND Be 10

Low to Medium Plasticity 7
(CL-C).CLAY

Medium to High Plasticity, 5
(CI-CH) CLAY _ :

 

Detailed subgrade evaluation should be undertaken during construction following bulk
earthworks to confirm design CBR values. This should include CBR testing and inspection by
Golder Associates.

6.5 General

It is recommended that ‘good’ construction practices are adopted so that moisture variations are
minimised in the high plasticity clays which have an estimated moderate to high potential for
shrink-swell movements. In particular the following recommendations should be followed:-

> Site drainage should be designed to readily remove surface water and to prevent ponding of
water on subgrade areas during construction and also adjacent to foundations and perimeter
slabs once construction is completed.

> Construction methods involving subgrade preparation for earthworks, foundation .
excavation and service trenching should be such that the clay soils are not subjected to
continued exposure, as this may result in excessive drying followed by moisture
readjustment (with associated expansive movements) when areas are overlaid by pavements
or slabs. :

> Trees or moisture drawing shrubs should not be planted in close proximity to movement
sensitive building elements.

Golder Associates

Section 43

August 2004 -12- 04682104(AB)

 

7.0 ACID SULFATE SOILS

The development of potential acid sulfate soils (PASS) is commonly the result of marine or
estuarine deposition of sulfate and iron bearing sediments in the presence of an abundant source
of readily decomposable organic matter resulting in the deposition of pyrite. This pyrite is
stable within the soil so long as anoxic conditions prevail. Oxidation of this material produces
acidic conditions and oxidation typically occurs as the material is exposed above the water table
by excavation.

Previous experience and available guidelines indicate that Potential Acid Sulfate Soils (PASS)
are normally restricted in extent to recent (Holocene to Pleistocene age) soil horizons deposited
in a saline environment below RL 5m AHD. The State Planning Policy SPP2/02 Planning and
Managing Development Involving Acid Sulfate Soils applies to land, soil and sediment at or
below 5m AHD where the natural ground level is less than 20m AHD. Within such areas the
SPP applies to development involving any of the following:

> Excavating or otherwise removing 100 m’ or more of soil or sediment; or

> Filling of land involving 500 m’or more of material with an average depth of 0.5 m or
greater.

The southern part of the site is consistent with the above criteria and the proposed development
in this area involves placing fill up to about 3 m deep together with excavation for stormwater
ponds / basins. Where the ground surface elevation falls below RL 5 m AHD, the proposed
development covers an area about 150 m in total length by 15 min width. SPP2/02 is therefore
applicable to this part of the site and an assessment of potential disturbance of ASS is required.

7.1 Investigation Aims

The aims of this investigation were to:

> Conduct an ASS assessment in accordance with SPP 2/02 and Queensland Sampling
Guidelines;

> Identify the presence or absence of ASS in the proposed disturbance area; and

> Provide an indication of the likely location of ASS, and treatment methodology.

The results of the ASS investigation follow.

It should be noted that ground water was not encountered in any of the three ASS investigation

test pits. Consequently, a ground water investigation (in accordance with SPP2/02) was not
conducted.

Golder Associates

Section 44

 

August 2004 -13- 04682104(AB)

 

7.2 Soil Sampling

Tn accordance with SPP2/02 a test pit sampling program was defined based on the broad scale
information obtained from the desktop assessment (Section 4.2) and calculations from the extent
of the proposed disturbance. The Queensland Sampling Guidelines Section 4.2 indicate a
minimum of 1 borehole per 50 m for linear disturbances. The depth of investigation was
established at 3 m, being 1 m below the anticipated ground water level. ASS samples were
recovered from three test pits (GA16-18) to 3 m depth where the proposed development area
extends below RL 5 m AHD.

Soil sampling, handling and testing was conducted as described in Section 4.2.

7.3 Field pH (pH,) and Peroxide pH (pHeox)

A typical consequence of the oxidation of pyrite in soils and the formation of sulfuric acid is a
drop in soil pH. Measuring field pH (pH;) as soon as possible after sampling and then
measuring pH following oxidation of the soil in suspension with a strong oxidising agent
(hydrogen peroxide) provides a simple, relatively conservative test procedure to detect soils
which are not likely to be acid sulfate soils. The test simulates extreme natural conditions and
PH drops following this test may not be entirely attributable to pyrite oxidation.

pH; was measured at the analytical laboratory (Bio-Track). Soil pH; and pHrox are summarised
in Table C1 attached in Appendix C.

Soil field pH was found to range between about pH4 and pH5, being moderately acidic.

‘

7.4 Summary of Soil Analysis Results

Table 3 shows the ASS action levels adopted by Queensland authorities based on three broad“
texture categories (QASSIT Guidelines - October 1998). These categories have been used to
highlight significant results in Table C1, based on the Action Criteria for greater than
1000 tonnes of disturbed soils.

Golder Associates

Section 45

—™

August 2004 -14- 04682104(AB)

 

Table 3: ASS Action Criteria

of: teria if more.

tonnes disturbed.
exture range rtrail =| Acid trail
MeDonald et al. clay oxidisable mol H* / tonne
(1990) . Content ven-dry basis) -| (oven-dry basis)
, TPA
Coarse Texture <5 . 0.03 18

Sands to loamy sands
Medium Texture . 0.03 18
Loams to light clays

Cc.

 

Fine Texture . 0.03 18
Medium to heavy
and cla’

The data quantifying the acid generating potential for soils sampled within the site have been
collated and are summarised in Table C1, with the laboratory reports, in Appendix C.

Samples with pH drops of 2.0 or more pH units or pH <3 after oxidisation are highlighted in
Table Cl. From the laboratory test results, Scr and TAA values above the action levels are also

highlighted.
The following observations are made regarding the investigation results as presented in
Table C1:-

> None of the 36 samples show pH after oxidation of pHr — 2.0, or pHrox of less than 3.0.

> All ten samples selected for laboratory testing returned Sc, results less than the laboratory
detection limit (0.01%S), which is less than the Action Criteria (0.03%S).

> All ten samples tested for TAA returned results above the Action Criteria (18 mol H+/t),
with 9 of 10 results ranging between 31 mol H+/t and 83 mol H+/t (indicating a slight to
moderate existing acidity hazard. The sample from 1.5 m depth in test pit GA18 returned a
TAA value of 147 mol H+/t.

Golder Associates

Section 46

August 2004 -15- 04682104(AB)

 

7.5 ASS Extent and Severity

The results from this investigation indicate that there is a negligible probability of ASS having a
potential to generate sulfidic leachate where the proposed development extends below RL 5 m
AHD. However, there is generally a slight to moderate existing acidity variably distributed
throughout the soil profile.

The SPP2/02 Guideline requires that the level of treatment for management of excavated ASS is
based on treatment of all existing and potential acidity. The results of the laboratory testing
have been accumulated in an Acid-Base Account to give a Net Acidity Value for each sample in
units of mol H”/tonne as presented in Table C1. This value has been calculated from sulfur trail
potential acidity (Sc, or Spos) plus actual acidity (TAA).

Assuming a bulk density of 1.7 tonne/m’ (for the sandy soils likely to be excavated), and using
the maximum TAA value recorded from test pits GA16 and GA17 (GA18 is located beneath a
proposed fill area) the indicated liming rate for excavated soil is 10 kg.Lime/m’.

It is our assessment that filling for the proposed development should not cause an environmental
impact due to mobilisation of existing acidity. The fill utilised for the development will be
predominantly clayey soils providing a low permeability capping that will restrict rainfall
infiltration and therefore limit the ground water flux.

In summary, the investigation has identified that there is a negligible probability for the
occurrence of PASS material. The existing acidity identified is within both sandy and clayey
soils at a level unlikely to be disturbed by filling. It is therefore considered that there should be
no requirement for specific management of existing or potential acidity within soils in the fill
area. Excavated soil from below RL 5 m AHD (eg. for pond / basin construction) will require
lime treatment to neutralise existing acidity (ref. Section 7.6).

7.6 Recommendations

Based upon the foregoing, the anticipated minimal volume of disturbance and the level of
treatment required indicates that management of existing acidity (not PASS) at this site would
be classified as Category H (high level) treatment in accordance with SPP2/02 Guideline - Table

4 (between 1 and 5 tonne of aglime required),

SPP2/02 Guideline requires that for Category H treatment, the management should ensure a
number of strategies as follows.

> Treat all soil excavated from below RL 5 m AHD ata rate of 10 kg lime/m’.
> Manage site runoff through bunding.

> Ensure that lime is thoroughly mixed with the soil.

Golder Associates

Section 47

oo

August 2004 -16- 04682104(AB)

 

Such measures could be incorporated into an Environmental Management Plan (EMP) for the
site which we understand will be required for the proposed construction works.

8.0 IMPORTANT INFORMATION

Your attention is drawn to the document - “Important Information About Your Geotechnical
Engineering Report”, which is included in Appendix D of this report. This document has been
prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which Golder
Associates is a member. The statements presented in this document are intended to advise you
of what your realistic expectations of this report should be, and to present you with
recommendations on how to minimise the risks associated with the groundworks for this
project. The document is not intended to reduce the level of responsibility accepted by Golder
Associates, but rather to ensure that all parties who may rely on this report are aware of the
responsibilities each assumes in so doing.

Yours faithfully
GOLDER ASSOCIATES PTY LTD

Ashley Davey Geoff Hurley MSc DIC C.Geol RPEQ 5716
Geotechnical Engineer Office Manager

\\MARI-S-FILEO1VOBS\2004\GEOTECENICAL\04682 104\CORRESPONDENCE\AB04682104R.DOC
ACD/GAH/acd ’

Golder Associates

Section 48

§

 

ockwell Building & Developmen: Noosa Business Centre — Stage 1
JM 10/08/04

Denotes test pit/borehole locations

FROM MPN CONSULTING PTY LIMITED, Piste

/. Be Ag 04682104

SITE PLAN

 

Section 49

 

psd

ogsit6a2{08 FENCE GP) GAPS, 1.607

> Lis! Unauthorised ase ot eproducion of Ing plan elite wholly o in part without writin permission infringes copyright Copytight Golder Associaes

z
‘Fesociales

NEC
Fence ny gasoeceoreciny

 

ERMC SOT A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

  

  

 

  

 

 

 

 

 

 

 

 

 

 

ooN —
=100 9 400 200 300 400 500 800
13)-- $ +13
42) : 12
GAQS
“a9
GA21
f= W3
ny. o bocce M4
jo
10) $ 3 M0
E 9 a de
2
$
&
a
Ei
a § i
8
8
a
G
@
7 7
GA02
“8
él. : 6
a} 5
Apso Lcessscsenesseccenenee 4
afro 3
“100 3 700 OO 700 300 600
LeGeNnD DISTANCE (m)
omeyox Bi
so cnt & Sandy Silty CLAY & Silty CLAY
vests Clayey SAND . Silty SAND
ee
EE secon ESonrsur = a
SZ Stockwell Building & Developmeyt Noosa Business Centre - Stage 1
ween | = SANDSTONE sie
pe pe" ACD P™ 4e/0e/2004 |™ SECTION A-A
pe BBB sondy Gravely CLAY a os
conta Sane oo rR
~*| H 1:2000 V 1:50 A3 04682104. Figure 2

 

 

 

 

 

 

 

Section 50

 

“roby o€ in parl without writen permission inringes copyright Copyright Golder Associates Pty. Lid
REDUCED LEVEL (m- AHD71)

“cele plan ether hoy

produc

2081

tan

th

ogsingsa2i04 FENCE GP! a)
Unauthorised use of Fe

 

RE_COLOURGLB FENCE At J{JenGEOTECHWNCAL OgEZIONFELDWOR
ianullon Gortaired on in drawrng sw eupyrai Gonder Aeaocans Py Le.

APS.1 MOD

 

 

~100 o 400 200 300 400 500

16)

 

444 . soesesseneeesvesnessdeveensensnenens cisseeesestesesaeessssisseaedissnesnseaseresseeaserensecen sessed

 

    

   

 

 

 

 

700 7 Too 200 300 00 S00 5

 

 

 

 

 

 

LEGEND oIsT. (m)
Clayey SAND Ea Clayey SILT
EBB sony clay
B Sandy Gravelly CLAY cor aoe
Stockwell Building & Development” Noosa Business Centre - Stage 1
SANDSTONE
3 "ACD ps" 46/08/2004 |" SECTION B-B
Silty SAND eae Bae
/ SAE PROIEGT Na FoR Wa
EB sangy sity cay H 1:2000 V 1:100 A3 04682104 Figure 3

 

 

 

 

 

 

Section 51

GAPS_1_MDORE.GLB FULL PAGE J:\2004\GEOTECHNICAL\04682104\FIELDWORK_LOGS\04882\uaTPBH.GPJ_GAPS_1.GDT_06/08/2004_12:41:25 PM

 

REPORT OF TEST PIT: GA02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POSITION: Refer to Site Plan SHEET: 1 OF 1
CUENT: Stockwell Building & Development COORDS: 504760 mE 7078480mN MGAS4 MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 6.5m DATUM: AHD7‘1 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.50 m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
b
a Lu ° = 1O
ey z w iG STRUCTURE AND
aks z SAMPLE OR Q/e SOIL/ ROCK MATERIAL DESCRIPTION S be ADDITIONAL
Ra} ih | Es FELD TEST a 5 Bs OBSERVATIONS
Sale Re | oePnH| 813 3 be
= fie} 2] o& | re @} oS|3 2 8
0 Fe] Cl | Sandy Sty CLAY
4 "= medium plasticity, light grey, trace of root matter shu
xt
0.20 *
6.30 Clayey SAND.
4 fine to medium grained, light grey and light brown
7 ps040050n
054 4
z 4
0.90
‘5.60 ‘Sandy CLAY
104 medium plasticity, pale grey and light brown, some red mottling J
a
4200 | eyed po |}
% 530 ‘becoming medium ta high plasticity, pale grey and red
g 4
2] 184 DS 1.501.60n 7
a . =
g 4
3 wo}o0t—(ité‘iYidi 6
8 480 becoming medium plasticity, trace of gravel (sandstone) ?
8
¢ 4
3 4
i
$| 204 ; 4
z=
5 4
3 220
ic 2.30 SANDSTONE
4 extremely low strength, pale grey, light brown and red, some clay,
highly fractured, extremely weathered
250
4.00 TEST PIT DISCONTINUED @ 250m
J REFUSAL
304 4
PJ Las

 

 

 

 

 

 

 

 

 

 

 

 

 

 

attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or
absence of soil or groundwater contamination. GAP gINT FN. FOte!
Ri2)

 

 

 

Section 52

a

Appendix A

Reports of Test Pit & Boreholes
Explanation of Notes, Abbreviations & Terms Used on
Borehole and Test Pit Reports
Method of Soil Description Used on Borehole and Test Pit
Reports
Terms for Rock Material Strength & Weathering and
Abbreviations for Defect Descriptions

Section 53

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAP5_1_MDORE.GLB FULL PAGE_J:\2004\GEOTECHNICALI04682104\FIELDWORK_LOGS\04682104TPBH.GPJ GAP5_1.GDT 06/08/2004 12:41:22 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
ENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROT Noosa Business Centre - Stage 1 SURFACE RL: 7.5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation ‘Sampling Field Material Description
Bs 81, 1k B
a w STRUCTURE AND
a Re 3 SAMLEOR ig) | & SOIL /ROCK MATERIAL DESCRIPTION 5 be ADDITIONAL
Sele |x FIELD TEST zl¢é aa
aS Be 8 eg 3 & Be OBSERVATIONS
= lie| = we RL x BS 3 3 5
O50 b= Tea] Sity SAND
4 . fine to medium grained, light grey, trace of root matter 4
0.20
7.30 CLAY |
4 medium plasticity, light grey and light brown, some red
BDS030050n
os 4
0.70
680
g
a 4
#
ZS) yotemp Ys fA Pd 4
g| pe CH [becoming high plasticity, ight grey and red, trace of ight brown
5 4 DS 110420
5 4
= 4 oy
a _
5 140
2 6.10
oO
i 187 DS 150-160 2 7
4 ’ g
204 4
24 4
1 DS270280m
3.00.
450 TEST Pit [email protected]
oct 3 tL ---'
“Tis repato est pk mustbe readin conjunction wih aocornpanying notes and abbrevaions, ithas been prepared for geotechnical purposes only, without
attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or
absence of soil or goundwater contamnaton. GAP gINT FN. Fote|
RL2

 

 

 

Section 54

ae

GAPS_1_MDORE,GLB FULL PAGE JA2004\GEOTECHNICAL(04682104\FIELDWORK_LOGSI046821047FBH.GPJ GAPS_1,GDT 06/08/2004 12:41:28 PM

 

REPORT OF TEST PIT: GA03

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: ‘Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 6m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE:_350 mm Toathed CHECKED: DATE:
Excavation Sampling Field Material Description
68 B18 y e STRUCTURE AND
g ke z SAMPEQR GT] SOIL / ROCK MATERIAL DESCRIPTION 5 be ADDITIONAL
e| x3 Fewest [att 1a ee ose
5 oe | 83 | pen Ql ests 8 be /ATIONS
= lie} =] o& | a «| o2}5 2 Bs
00m P= TEM] Sty SAND
4 1 fine to medium grained, light grey, some root matter
sl]
0.30,
B70 Sily Sandy CLAY
4 medium plasticity, light grey
05 4
4 =|,
10-4 = 4
| DS 1.101.20m
i 154 4
1.60 Pot
440 becoming high plasticity, light grey and light brown, some red
4 matting
£ 4
£ | 204 4
a
g 4
a > ee Se |
Ss 380 becoming light grey, trace of ight brown and red motting
i
rs 7 Ds 240:250m
=| 254 4
&
5 4
a
rc 4
ag—| 3.00
3.00 TEST PIT [email protected]
ee by ~L----~-~-i4ij--I_d—-~---_--____- LIL

 

absence of soil or groundwater contamination.

 

 

 

This report of test pit must be read in conjunction with accompanying notes and abbreviations. Ithas been prepared for geotechnical purposes only, without
aitempt fo assess possibie contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

GAP gINT FN. Fote|
Ri

 

 

Section 55

—~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POSITION: Refer to Site Plan SHEET: 1 OF 1
CUENT: Stockwell Building & Development COORDS; 504730 m E 7078!40mN MGA94 MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 6m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 270m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
bE
Io) a =< (Oo
I56O itt S a
ake z SAVPLEOR Q }e SOIL/ ROCK MATERIAL DESCRIPTION & b> STADOTIONA,
2 eo &| £8 FIELD TEST e p @e
EBsle| bs be g 5 2g OBSERVATIONS
= fie} =] aE |e Zz} oS|$ £ Be
00
6.00 PJM | Cayey Sandy SLT
4 z 7} | iow plasty, dark ore, trace of root matter
—
4 uw
0.40 |_|
5.60 Silty Cayey SAND
os fine grained, ight grey a
4 a
=
280 }
5.20 ‘Sandy CLAY
4 medium plasticity, light grey, light brown
194 ° 4
4.10 ||
420 Sity CLAY .
4 high plasticity, light grey and red, trace of fine sand
=
s 7 BS 130-140n
2 4
2 154 4
3 tot | Fy Lee
3 430 becoming light grey and red, trace af light brown
a 7 g
z| &
3 : | 2.00
2 3 >a1)!OUlUté‘(COé‘U;#;CWRSSD Ree 4
g 2 20 4,00 becoming medium plastiaty, some gravel
5 u 220
8 2 3.80 ‘Sily Sandy CLAY
qi Gi J medium plasticity, pale grey, red and light brown motiled, some clay
8 a
4 oe
Z = 250
d [>| 25-350 >| | SANDSTONE 7
z J extremely low strength, fine to medium grained, some lay, highly
5 fractured, extremely weathered
8 270
3 3.30 TEST PIT [email protected]
3 J REFUSAL
qi
g 4
8
3 305 4
: 4
d 4
3 4
g 4
8
41 tej Ld Jt ae Poo Jo
2 ‘This report of test pit must be read Conjunction with aocompanying notes and abbreviations. thas been prepared for geotechnical purposes only, without
a altempt to assess possible contamination. ‘Ary references to potential contarrination are for information only and do not necessarily indicate the presence or
absence of soll or groundwater contamination, GAP gINT FEN, Fote,
RiQ|

 

 

 

 

Section 56

 

REPORT OF TEST PIT: GA05

SHEET: 1 OF 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS_1_MDORE.GLB FULL PAGE J:\2004\GEOTECHNICAL04682104\FIELDWORK_LOGS\04682104TPBH.GPJ GAPS_1.GDT 06/08/2004 12:41:35 PM

 

‘@tiempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

 

 

 

 

Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
Noosa Business Centre - Stage 1 SURFACE RL: 11.5m DATUM: AHD71 CONTRACTOR: IBS
Eenie Creek Road PIT DEPTH: 3.00 m LOGGED: PGH DATE: 21/7/04
04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
‘Sampling Fleld Material Description
SO B 3 w B STRUCTU
3 ia UCTURE AND
SRele| oe SER & & SOIL / ROCK MATERIAL DESCRIPTION 5 be ADDITIONAL
Ee | es 9] &.| 2 raced OBSERVATIONS
3 oe] S| BE PR @ 3 2 88
W755 CL | Gravely Sandy CLAY
low plasticity, light brown
Test pit commenced at ground level above
0.30.
7120 | BDS0300.60n Siy CLAY
medium to high plasticlty, pale grey, red and ight brown, trace of
gave
4
a
a
&
E g
3 4
8
a
5
g
oe
§
2
3
&
1.60 +
350} DS 4.60-.70m Sily Sandy CLAY
medium to high plasticity, pale grey, some red brown and red motting
1.90 |_|
360 San CLAY
medium plasticty, pale grey and red, some gravel 4
z
g 4
3.00 J
850 TESTPIT DISCONTINUED @ 300m
PRACTICAL REFUSAL

 

absence of sail or groundwater contamination.

 

 

 

 

GAP gINT FN. F0te}
Ri

 

 

Section 57

 

REPORT OF TEST PIT: GA06

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAP5_1_MDORE.GLB FULL PAGE _J:\2004\GEOTECHNICAL\04682104\FIELDWORK_LOGS\04682104TPBH.GPJ GAP5_1,GDT_06/08/2004_ 12:41:47 PM

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 4
‘Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
Noosa Business Centre - Stage 1 SURFACE RL: $m DATUM: AHD71 CONTRACTOR: IBS
Eenie Creek Road PIT DEPTH: 1.70m LOGGED: PGH DATE: 21/7/04
04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
Lew s IB
IS z w |G STRUCTURE AND
8 Ez z SAVPLE OR g 2 |e SOIL ROCK MATERIAL DESCRIPTION Sb ADDITIONAL
obo) zs FELDTeST | é
Bele | ES loon 8] E013 & BS OBSERVATIONS
2 aw] S| BE RL wi 6913 285
00 —~S0 =] cL] Sandy Clay
4 low plasticity, light grey, trace of root matter
O20, Tt
880 Becoming light brown and light grey
4 8
os 4
0.80 |__|
820 Sandy Sly CLAY
g 4 high plasticity, red and light brown, some gravel
E
3) DS 1.004.10m 7
ai x
4 a
3 g
é 4
§ 4
a
5 1.40
2 7.60 SANDSTONE
| as extremely iow strenghh, pale grey red and ight grey, some cay, 4
. highly fractured, extremely weathered
170 pine
7.20 TEST Pil [email protected]
] REFUSAL
2044 4
254 4
30-4 4
LyjJ —-L—_____ Jette eee po

 

 

This report of test pit must be read in conjunction with accompanying notes and abbreviations. [thas been prepared for geotechnical purposes only, without
alternpt to assess possible contamination. ‘Any references to potential contamination are for information only and do not necessarily indicate the presenos or

absence of soll or groundwater contamination.

GAP gINT FN. FOte}
Ri2|

 

 

Section 58

~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Stockwell Buikding & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 6.5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.70 m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
ew 3
a wi STRUCTURE AND
8 Ee = sume [E Q ie SOIL/ ROCK MATERIAL DESCRIPTION 5 foe ADDITONAL
Si x3 FIELD TEST z la 5 lo
= Ka bi Ee Zold & Bs OBSERVATIONS
2 hse S | BE [OR zo} 3 = 84
9 —Fa TSC | Cayey SAND
4 ‘ fine to medium grained, ight brown, light grey, trace of root matter
7 Oo
a
4 =
os 4
0.70 ||
580 CL | SandyClaY
4 CI | low to medium plasticity, red, ight brown, trace of light grey
a
a 4
E
3] 104 4
8
ai 4
a
2
BL =
S 4
| 8
3 4
oO
a 167 DS 150-160 4
3 1 , =
5 $80) 00 ame mp
g 4.70 becoming low plasticity, ight grey, red and light brawn motiled, some
3 : ae
3
2 20 200 4
& 450 Gravely Sandy CLAY
a q low plasticity, pale grey, ight brown and red mated
Ez
3 4
_| 250 - 4
é 25a SANDSTONE
s 4 extremely low strength, light brown, red and light grey, some clay,
5 highly fractured, extremely weathered
g 270
5 3.80 TEST PIT DISCONTINUED @ 270m
3 J PRACTICAL REFUSAL
é
E 4
g
3| 30 4
4 4
s J
3 4
g 4
3
~PJI-L_ Lagat —L——_-~~--4 JjJ-—te4---~-_-_— ~~ + ~~~ ~~ -Ld-4t---—------~--~--J-4
g This report of test pit must be read in conjunction with accompanying notes and abbreviations. ithas been prepared for geotechnical purposes only, without
6 attempt to assess possible contamination. Any references to potential contarrination are for information only and do not necessarily indicate the presence or
absence oF soil or groundwater contamination. GAP GINTFN Fate]

 

 

 

Section 59

—

 

Gx.

REPORT OF TEST PIT: GA08

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS5_1_MDORE.GLB FULL PAGE JA2004\GEOTECHNICAL\04882104\FIELDWORK_LOGS\04652104TPBH.GPJ_GAPS_1.GDT_08/08/2004_12:41:44 PM

SHEET: 1 OF 1
Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROUCT: : Noosa Business Centre - Stage 1 SURFACE RL: 7m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.70 m LOGGED; PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation ‘Sampling Field Material Description
be
[2 us a = Oo
IOS a 3 w iG STRUCTURE AND
3 ke = at sik a 5 SOIL/ROCK MATERIAL DESCRIPTION = be ADDITIONAL
E BBE | ES locem 818.| 8 3 Bs OBSERVATIONS
= fie| S|] OE |e a $ Easia}
W755 SM] Sity SAND
4 fine to medium grained, light grey, trace of root matter
2
0.30 =
670 ‘Cayey SAND
| fine to medium grained, fight grey and light brown
05-4 t ‘ 4
J ae °
g 0.90 |__|
Fa 610 Sandy CLAY
3} 10-4 low plasticity, light grey and light brown J
3 | 1
Zz q B
5 >
g
é 4
$ a0) | fee LEU ||
zB a 5.70 becoming pale grey and red motiled light brown el<z
g ;
3 4 a
z >
° 15 1.50 4} 4
ST550 ‘Sily Sandy CLAY
J high plasticity, pale grey, some red and light brownmotting
20-4 4
200 gh PO
490 Besorring medium plastly, pale gray, Fable =
2544 4
270
430 TEST PIT DISCONTINUED @270m
3044 4
LJ _ Lat -Lo-~-~-_-_dj eet LESS

 

 

 

 

 

‘This repatt of test pit must be read in conjunction with:

 

 

 

 

absence of soll or groundwater contamit

 

 

 

 

accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without
attempt to assess possible contamination. ‘Ary references to pclentl ca tarinafon ae far infomation only and do nctnenessariy ncicale

‘the presence or
GAP gINT FN. FO‘e}
Ri2

 

 

Section 60

oN,

GAPS_1_MDORE.GLB FULL PAGE JA\2004\GEOTECHNICALI04652104\FIELDWORK_LOGS\046821047PEH.GPJ GAPS_1.GDT 06/08/2004 12:41:47 PM

 

REPORT OF TEST PIT: GA09

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

absence of soil or groundwater contamination.

SHEET: 1 OF 1
CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 9m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toathed CHECKED: DATE:
Excavation Sampling Field Material Description
b
lew a - s
8 8 3 w |G STRUCTURE AND
8 Ea = SAMAEOR |G) 2 | SOIL/ ROCK MATERIAL DESCRIPTION 5 [oe ADDITIONAL
eb xs FIELD TEST a
= pale ES | oon £0| 8 ae OBSERVATIONS
2 ae] S| Be pon 2] 53/38 3/85
00-00 Su] Sity SAND
4 | fine to medium grained, light grey, race of root matter zlo
aAs=
0.20
880 | BDS020060n CL | Sandy CLAY
4 low plasticity, light grey, light brown,
05 4
a
g 4
gE
3 | 104 4
a 1.10 |_|
5 790 Cr SiySandy CLAY
z | medium plasticity, light grey, trace of light brown and red motting
5
2
2 ] >
1.50
i 15750 CH Sity CLAY [_] 7
4 high plasticity, pale grey, lightred and light brown motting
DS 160-1:70m
20-28 4
g
7 DBs 230240n
2544 +
4 be
4 x |
4
4 —
—
a9} 300 se
600 TEST PIT DISCONTINUED @ 300m
pteL —L3s L--____tj__J-t_-_ LL

 

 

 

 

attempt fo assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

GAP gINT FN. FOte|
Ri2

 

 

Section 61

 

Cisitiin

REPORT OF TEST PIT: GA10

SHEET: 1 OF 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS_1_MDORE.GLB FULL PAGE JA2004\GEOTECHNICAL\046821 04\FIELDWORK_LOGS104882104TPBH.GPJ_GAPS_1.GDT_06/08/2004 12:41:50 PM

 

 

 

 

 

 

 

 

 

 

absence of soll or groundwater contamination.

 

Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PRORCT Noosa Business Centre - Stage 1 SURFACE RL: 95m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.50 m LOGGED: PGH DATE: 21/7104
JOB NO: 04682104 BUCKET TYPE:_350 mm Toothed CHECKED: DATE:
Excavation ‘Sampling Field Material Description
=
Iz a - 1
bo g 3 w STRUCTURE AND
ate 3 SWWRECR Jl | E SOIL/ ROCK MATERIAL DESCRIPTION 5 be ADDITIONAL
SISS| a] 2 Feptest jalz | 5B OBSERV
E Bale | he [oom 313219 8 Be TIONS
3 fr] S| BE fa Zz} 62/5 2 ba
00 o50 5 ML] Sauy Str
4 low plasticity, light grey, trace of root matter
0.20
930 CL | Sity Sandy CLAY
4 low plasticity, light grey, light brown
] g
os 4
=
4 |
2A
x |
070 r= ||
8.80 fx —7 CH | Silty CLAY
4 high plastily, pale grey, some red matting
DS080090n
g
a 4
Z
2} to4 4
8
a 4.10
5 840 becoming pale grey, some red and light brown matting
2 4
Fal E
s 4
2
3 4
5
154 4
4 ’ x
7 DS 4.80-1.90n
2044 _
2.50
700 TEST Pit [email protected]
304 4
ptt —bLs Poo LL

 

 

“This report of test pit must be read h conjunation with aocornpanyhg notes and zbbrevions. Ithas been prepared for geotechnical purposes only, without
attempt fo assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

 

GAP gINT FN. FOte}
Ri2|

 

 

Section 62

 

REPORT OF TEST PIT: GA11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAP5_1_MDORE.GLB FULL PAGE JA2004\GEOTECHNICAL\04682104\FIELDWORK_LOGS\046821041PBH.GPJ_GAPS_1.GDT_06/08/2004_12:41:52 PM

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 6m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH; 2.50 m LOGGED: PGH DATE: 21/7/04
JOB NO: 04682104 BUCKET TYPE; _350 mm Toothed CHECKED: DATE:
Excavation Sampling Fieki Material Description
=
BS cowie elo [3 w is STRUCTURE AND
8 Is =e FIELD TEST 2 ys SOIL/ ROCK MATERIAL DESCRIPTION 5 ioe ADDITIONAL
a a Ee
= Bale | es g0/9 3 BB OBSERVATIONS
= lie] 2 |] SE | Z| 59]3 $ 8
700 PT aM] Sity SAND
J el fine to medium grained, ight grey, trace of root matter
g
0.30 |__|
5/0 Cayey SAND
4 fine to medium grained, light grey and light brown
05 l'. 4
a] a
0.80 |_|
5.20 Sandy CLAY
g J low to medium plasticity, red, ignt grey and light brown motting
5 10 J
2 | 4
z g
a 4
2
& 4
i} 1s 130 =|
5 470 Sity Sandy CLAY
5 J medium to high plasticity, pale grey, trace of red matting
8
15 4
1.80
420 Sity CLAY
a high plasticity, pale grey, trace of red and light brown mottiing, trace z
offine sand
20 4
2.50 zz]
3.50 TEST PIT [email protected]
30 4
ee

 

 

 

 

This report of test pit must be read in conjunction with accompanying notes and abbreviations. It as been prepared for geotechnical purposes only, without
aitempt tp assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

absence of soll or groundwater contamination.

GAP gINT FN. FOte|
Ri2)

 

 

Section 63

a

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 105m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.50 m LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
jz - iO
bo a
SKEle| 23 SAMPLEOR B Q é SOIL/ ROCK MATERIAL DESCRPTION & E. STADOTTONAL
= [52] zs 8 Ee 2 5 Be OBSERVATIONS
2 Bz] S| BE [PR «| 69 | 3 $ 8
9a > Tu] Sily SAND
J . e fine to medium grained, light grey, trace of root mattter a
=
0.20
10.30 Clayey SAND
4 fine to medium grained, light grey and light brown
a
0 0.50 |_| 4
° 10.00 ‘Sandy CLAY
4 medium to high plasticity, light grey and light brown
1 ps070080n
o
a 4
#
2] 4910 4
8 “ 9.50 ‘Sandy CLAY
a 4 medium to high Pasi, light grey, some red and ight brown
5 matting
2
x Fy 7 Ds 1204.30n zlz
= 4
2
2 3 7
$ &
15 4
8 4
5 4
>I 200
g 20-55 eG |_| a
a q medium plasticity, pale grey, trace of red and light brown mottling
Ei
i | =
8
x 4
g es
a 250 =
a 8.00 TEST PIT [email protected]
& 4
g 4
g
Z| 4
a
o 4
3
g 30 4
g
g 4
q J
al
& 4
2
“pt—i_— LoyJ —L—-~~~-4 Jet ee Le
& “Tis report of test pit must be readin conjuncion wth accompanying notes and abbreviations, tthas been prepared for geotechnical purposes only, without
3 attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or
absence of soil or groundwater contarnination. GAP gINTEN FOle

 

 

 

Section 64

oa,

 

Gist.

REPORT OF TEST PIT: GA13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS_1_MDORE.GLB FULL PAGE J\2004tGEOTECHNICAL\04882 {04\FIELDWORK_LOGS\046521047PBH.GPJ_GAPS_1.GDT_96/08/2004_12:41:58 PM

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT. Noosa Business Centre - Stage 1 SURFACE RL: 105m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.70 m LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
b
BS g 2 w ki STRUCTURE AND
8 ke <F opie & 2 ]& SOIL/ ROCK MATERIAL DESCRIPTION 5 be ADDITIONAL
= Be| Es 8 ee 2 & ga OBSERVATIONS
2 ee} S| BE [a zoo |S 2 88
5% ==]S6 | Cayey SAND
4 4 fine to medium grained, light grey, trace of root matter
g
030 |__]
10.20 ‘Sandy CLAY
J medium plasticity, light grey, light brown and trace of red motiling
05s 4
7 U500600.70m
4 PR=>600kKPa 4
g 2.90 EE
Gi 960 be ‘Sandy Sy CLAY
z +0 7 medium to high plasty, pale grey, some red, ace of brown d
3 “ x = 1 motting
a 4 a,
& 4 co
5
5 4 la
in} 2 149 bea] =
2 9.10 fe —f Cl | Sity CLAY
9 1s medium plasticity, light grey, trace of red mottirg, some gravel x 4
7 DS 1604.70
J ro
204 4
254 4
4 a |
270 ie
7.80 TEST PIT [email protected]
304 4
Jt _ LyJ3 —-L—~~_~___tij Ji EL IL

 

 

 

 

This report of test pit must be read in conjunction with accompanying notes and abbreviations. Ithas been prepared for geotechnical purposes only, without
altempt to assess possible contamination. Any references to potential contamination are for information only and do not necessaaily indicate the presence or

absence of soil or groundwater contamination.

GAP gINT FN. FOte|
RZ

 

 

Section 65

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CUENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 8.5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
b
iz o 3B w E
STRUCTURE AND
8 Es <3 anes i QE SOIL/ROCKMATERIAL DESCRIPTION & be ADDITIONAL
= Saf | Es R o 5 jaa OBSERVATIONS
BOSE | bs lon 8} 2818 Sha
= fic} | of | re wz} oS{3 = [ba
90550 Mt] Sty SAND
4 fine to medium grained, light gray, trace of root matter
=
4 4 2
8.30,
B20 Sandy CLAY
J low plasticity, light brown and light grey
Ds040050n
05 4
=
4 a
g
8 0.90 |__|
fa 7.60 CH] Sity CLAY
5 40-4 high plastictty, light grey, some red mottling J
a | 1
a| J
=
2
z 4
a DS 1204.30n
s 4
a
= 5 wo} = | ey Ed
a g 7.40 becoming pale grey, some red and light brown matting
8] 154 4
3 1 2
t
3 4
g| 4
& =
g 2 ;
B
z 4
3
g 4
Wf | | |
3 4
3 4
3
z 4
&
g 4
g
Z| 39} 300
g ww] 850 TEST Pit [email protected]
8 4
4 J
3 4
& 4
2
“-J_L_ Lot -L—_____J JjJ—-t—--—____—— —--—----~--—~—-—Lij_t-—
@ This repot of test pit must be read in conjunction with acoompanying notes and abbreviations. Ithas been prepared for geotechnical purposes only, without
6 attempt to assess possible contamination. Any references to potential contamination are far information only and do not necessarily indicate the presence or
absence of soil or groundwater contaminaton, GAP GNTFN Fite

 

 

 

Section 66

 

REPORT OF TEST PIT: GA15

 

 

 

 

 

oN.

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS_1_MDORE,GLB FULL PAGE J\2004\GEOTECHNICALI04652104\FIELDWORK_LOGS\04682104TPBH.GPJ GAPS_1.GDT 06/08/2004 12:42:04 PM

 

SHEET: 1 OF 1
CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 8.5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 2.80m LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
Ww ay
BS SAVPLEOR g 3 w i STRUCTURE AND
8K z 5 SOIL/ ROCK MATERIAL DESCRIPTION 3 be ADDITONAL
2B big} zs FIELD TEST oO eB
Ea] | ES loom 8 & a OBSERVATIONS
3 ie] S| GE | t 3 $8
Oa SM] Sity SAND
4 fine to medium grained, light grey, trace of root matter
1 a
0.30 =
820 Clayey SAND
4 fine to medium grained, light grey, light brown,
o5—[ 280 } | J
8.00 ‘Sandy CLAY
J high plasticity, ight grey, light brown, trace of red matting
150060070
J PP=400iPa
a
a 4
8
2 | 104 4
8
a 4.10
5 740 Silty CLAY ,
2 J high plasticity, pale grey and red, trace of ight brown molting
G
u
= 4
g
a 2 7 DS 140-.50m =
1s 4
g
1.90
660 ‘Sandy Sty CLAY
20-4 high plasticity, pale grey, some red and light brown motting J
240
6.10 ‘Sandy CLAY
2 medium plasticity, pale grey, trace of red and light brown matting 4
2.80
5:70 TEST PIT DISCONTINUED @ 280m
30— 4
Poets +l KKK JjJ—Hle t e e Pat

 

 

 

 

 

 

 

 

 

 

 

 

 

‘This report of test pit must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purposes only, without
altempt fo assess possible contamination. Any references to potential contamination are for information only and do nat necessarily indicate the presence or
absence of sof or groundwater contamination. GAP gINT FN. FOte
Ri2)

 

 

Section 67

f -

GAPS_1_MDORE.GLB FULL PAGE JA2004tGEOTECHNICAL\04882104\FIELOWORK_LOGS\04652104TPBH.GPJ_GAPS_1.GDT_06/08/2004_12:42:08 PM

 

REPORT OF TEST PIT: GA16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CUENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 4.5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation ‘Sampling Field Materia! Description
p-
Iso 3g ia STRUCTURE AND
ake = SAVPLECR f g/t SOIL / ROCK MATERIAL DESCRIPTION & lag: ADDITIONAL
OBbl Ss] z8 FIELD TEST a 2
= bale 5S on g »|2 aes OBSERVATIONS
= fie| =] OE |r 6913 2 ba
Wa PT aM] Sity SAND
: [-, 8] | fine to medium grained, ight grey, trace of root mater
ASS sampies taken
4 everyy025mib
30mdeph
4 =
a5 4
0.60 ||
330 SAND
J fine to medium grained, light grey, light brown, slightly cemented
8 2.90 8
fa 3.60 Clayey SAND
Zt, o4 fine to medium grained, light grey, light brown, 4
a] 1
Zz 4.10 ||
5 340 Sity CLAY .
z J high icity, light gray, light brown, trace of fine sand
E
s 4
a
5
3 4
oO
5 15-4 = 4
7 Ds 1.80420 =
q g
20-589 Pol haa 4
: _ ing light grey, trace of ight brown and red motied
7 4
4 Lx |
|_—$
4 pe —F
254 4
2.60 | |
TH Cl | Sandy CLAY
J medium plasticity, light grey, some red and light brown matting
4 z
a
>
3.00
1.50 TEST PIT [email protected] m
+ Jt L 35 LP LLL LL EL IL

 

 

 

 

 

 

 

 

 

 

 

 

 

“This repot of test pi rust be retin conjunction wih accompanying notes and abbreviations, Ithas been prepared for geotechnical purposes only, without
altemnpt to assess possible contamination. Any references fo potential contamination are for infomation only and do not necessarily indicate the presence or
absence of soil or groundwater contamination. GAP gINTEN. Ff

 

 

Section 68

 

REPORT OF TEST PIT: GA17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SHEET: 1 OF 1
CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED; PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: 350 mm Toothed CHECKED: DATE:
Excavation Sampling Field Material Description
b
es 3 wy E STRUCTURE AND
3 k= 2 SAMPLE OR 2/5 SOIL /ROCK MATERIAL DESCRIPTION 5 lor ADDITIONAL
SBE xg FIELD TEST
& Sg é 8 | oem bo 9 2 BS OBSERVATIONS
2 oe] S LSE |e #] So] 3 2 8
0-75 DT a] Sity SAND
J [;, %] | fine to medium grained, ight grey, trace of root matter
ASS sampies taken *)
4 evey025mio 4
30mdegh:
0.40 |_|
460 ysP|sanD
os ‘ fine to medium grained, light grey oO 4
0.60 ||
440
a g
a 4
5
3] 4
a 4.10 __
5 3.90 Ped Cl | SandyClay :
z 4 4 medium plasticity, light grey, light brown
& v2
g 4.30 4
8 370 Sity Sandy CLAY
= 5 J medium to high plasticity, light grey, trace of red and light orown
z= g matting
al is 154 = 4
3 g
E
8 4
g 4
ql 205 7]
5
| 4
5 20} | Pry LLU |__|
g 2.80 becoming medium plasticity, pale grey, trace ofred motting
3 4
x 4
yt je |
3 4 =
3
3 4
3
£ 4
&
5 4
g 3.00
3 200 TEST PIT [email protected]
4 4
a A
2
3 4
z 4
3
=
“oo hist —b A tt A
3

aftempt to assess possible contamination. ‘Any references to potential contamination are for information only and do not necessarily indicate the presence or

aasence of soil ar groundwater contamination.

GAP gINT FN. Fote
RQ)

 

 

Section 69

 

REPORT OF TEST PIT: GA18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

  
 

 

 

 

1_MDORE.GLB FULL PAGE JA2004\GEOTECHNICALI04682104\FIELDWORK_LOGS\04682104TPBH.GPJ_GAPS_1.GDT_06/08/2004_12:42:14 PM.

GAPS _

SHEET: 1 OF 41
CUENT: Stockwell Building & Development POSITION: Refer fo Site Plan MACHINE: 6 Tonne Excavator
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 4.5m DATUM: AHD71 CONTRACTOR: IBS
LOCATION: Eenie Creek Road PIT DEPTH: 3.00 m LOGGED; PGH DATE: 22/7/04
JOB NO: 04682104 BUCKET TYPE: _350 mm Toothed CHECKED: DATE:
Excavation ‘Sampling Field Material Description
Bs 3 3
w ia STRUCTURE AND
8 ea «| <3 Seer € SOIL/ ROCK MATERIAL DESCRIPTION & be ADDITIONAL
z | = a 5 |e OBSERVATIONS
66a] 2 | hs | on 3 3 6a
= fir] =] o& | ew 3 2 8
9-5 SV] Sty SAND
4 | fine to medium grained, ight grey, traoe of root mater
ASS sampes taken
J every025mib
30mdeph
0.30.
42 ‘Clayey SAND
4 fine to medium grained, light grey and pale brown,
: 2
05 Som 4
070
3.80 ‘Sandy CLAY
4 low plasticity, light grey, pale brown
a 2.90 =
itd 360 Sity Sandy CLAY
2] 1] high plasticty, ight grey, pale brown 4
3 | 1
Zz | =
a
2
é 4
$ wo) | Be Lou
3 30 becoming pale gy, iraoe of pale brown and red matting
3 4
oO
is 154 = 4
1 g
2044 4
25-250 Ee 4 Loe |__| 4
2.00 [=H contains ferruginous cobbles/boulders.
74
4 ie]
4 ae 5
J PA g
aS
—.
3.00 cs
1.50 TEST PIT [email protected]
pod —Las— Po LLL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

attempt to assess possible contamination. Any references tp potential contamination are for information only and do not necessarily indicate the presence or
absence of soll or groundwater contamination. GAPQINTFN. FOte

 

 

Section 70

 

REPORT OF BOREHOLE: GA19

 

 

 

 

 

oo

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAPS_1_MDORE.GLB FULL PAGE JJ.\2004\GEOTECHNICAL04682104\FIELDWORK_LOGS\046821047TP3H.GPJ_GAPS_1.GDT_06/08/2004_12:42:18 PM

 

 

 

 

SHEET: 1 OF 1
Stockwell Building & Development POSITION: Refer to Site Plan DRILL RIG: Edson CP1
Noosa Business Centre - Stage 1 SURFACE RL: 11m DATUM: AHD71 DRILLER: Contract Drilling
Eenie Creek Road INCLINATION: -90° LOGGED: PGH DATE: 22/7/04
04682104 HOLE DIA:_100 mm HOLE DEPTH: 5.00 m CHECKED: DATE:
Orilling Field Material Description
iz p=
Ww 1
ES g 3 w a STRUCTURE AND
8 EE s E SOIL/ ROCK MATERIAL DESCRIPTION 5 ee ADDITIONAL,
= 2|f| es 8 5p OBSERVATIONS
GES|—) 8 |ocen 9 3 be
= fr} = {o£ | ee iz 3 = |6a
99-750 SM] Sity SAND
7 | fine to medium grained, light grey, trace of root mater 9
1 0.30
10.70 Clayey SAND
7 fine to medium grained, light grey and light brown
g | 05—- 4
Gi 4
E 070
3 10:30 Sity Sandy CLAY =
FA 4 high plasticity, ight grey and light brown g
bE 4
21 104 4
fl 4
= 4
2 wo} ti si=iYYiCUT LL ||
3 q 3.70 becoming pale grey, trace of red mottling
oO
15 4
2044 4
7 220 | Peep LPL Lt
1 880 becoming medium plasticity, pale grey =
a] | |= :
7 x
30 4
s_| 350 4
35750 Sandy CLAY
4 medium plasticity, pale grey
404 4
45 ‘| 450 J
650 SANDSTONE
4 extremely low strength, pale grey and red, fine to medium grained,
4 extremely weathered
| 500
6.00 END OF BOREHOLE @ 500m

 

 

 

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. [thas been prepared for geotechnical purposes only, without
attempt i assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

absence of sof or groundwater contamination. GAP INT FN. Ota

 

 

Section 71

 

Gis.

REPORT O

F BOREHOLE: GA20

SHEET: 1 OF 1

 

 

 

 

 

 

GAPS_1_MDORE.GLB FULL PAGE J:\2004\GEOTECHNICALI046821041FIELDWORK_LOGS\04882104TPBH.GPJ_GAPS_1.GDT_06/08/2004_12:42:22 PM

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan DRILL RIG: Edson CP1
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 12m DATUM: AHD71 DRILLER: Contract Drilling
LOCATION: Eenie Creek Road INCLINATION: -90° LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 HOLE DIA: 100 mm_HOLE DEPTH: 5.00 m CHECKED: DATE:
Drilling ‘Sampling Field Material Description
Ee
iow 9 s g
Eo Z w ho STRUCTURE AND
|. | 3 eater Qe SOIL/ ROCK MATERIAL DESCRPTION 5 be ADDITIONAL
bf Es 8 Be a 5 Ba OBSERVATIONS
Bs] s | BE [Pa 3] 88/8 2 Be
007550 Te ]SM] Sity SAND a
4 020 . fine to medium grained, light grey, trace of root matter =
7780 | BDS0.20-050m ML | Oayey SIT |
7 low plasticity, light grey, trace of light brown
g | 95 4
4 &
E 070 =
3 "39 Sey CAT sch .
a 7 1U50.0.80-0.90m medium to high plasticity, light grey and light brown
8 1 4.00
2] 10-4 ba =~ — — —  — — —___ _-_____— 4 4
& | 106 becoming medium plasticty, pale grey
$s 4
3
Zz 4
& 4 ve
° iJ
154 —~- 4
4 nay
7 a4
204 4
3 5. | 250 :
7 DS260270n high plasticity, pale grey and red
2.80
9.20
304 = 4
5: 3.50. 4
3s 32
40—| 4
45 DS450460m q
e9_| 500 =
8700 END OF BOREHOLE @ 500m

 

absence of soil or groundwater contamination.

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purpases only, without
attempt to assess possible contamination. Any references tp potential contamination are for information only and do not necessarily indicate the presence or

GAP gINT FN. F0ta]
Ri2|

 

 

Section 72

 

Gisx..

REPORT OF BOREHOLE: GA21

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GAP5_1_MDORE.GLB FULL PAGE JA2004\GEOTECHNICAL\04662104\FIELDWORK_LOGS\046521047PBH.GPJ GAPS_1.GDT_06/08/2004_12:42:24 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

‘This repart of borehole must be read in conjunction with accompanying notes and abbreviations. Ithas been prepared for geotechnical purpases only, without
attempt to assess possible contamination. Any references to potential contamination are for information only and do not necessarily indicate the presence or

absence of soil or groundwater contamination.

SHEET: 1 OF 1
Stockwell Building & Development POSITION: Refer to Site Plan DRILL RIG: Edson CP4
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 11m DATUM: AHD71 DRILLER: Contract Drilling
LOCATION: Eenie Creek Road INCLINATION: -90° LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 HOLE DIA:_ 100 mm_ HOLE DEPTH: 3.00 m CHECKED: DATE:
Drilling Sampling Field Material Description
iz >
Eg SAMPLEOR g 2 yw E STRUCTURE AND
gk a we Fé SOIL/ ROCK MATERIAL DESCRIPTION B foe ADDITIONAL
ais) zs FIELD TEST z 1a 5 OBSERVATIONS
GB) 2 | BE [oom glag|8 3 Ba
= ite] }| o£ | re e| 53} 8 Ba
0000 P= Tau] Sity SAND
7 te ‘| fine grained, light grey, trace of root matter
| Q
5 bj
0.40. =
10.60 ‘Sandy CLAY
8 05 Jow plasticity, light brown and red 7
i 4
z 4
8 0.80 =
6 40.20 [> =] CH | Sity Sandy CLAY
5 q high plasticity, pale grey and red, trace of gravel a
z| 104 g 4
o 4
= 4
8
g 4
g 4 -
> ° 1.50 2
4 15: 4
2 250 SANDSTONE
7 DS 4160-170 extremely low strength, pale grey, trace of red, exiremely weathered
204 4
254 , 4
7 Ds260270n
a 7 3.00
800 END OF BOREHOLE @ 300m
7 REFUSAL
354 4
4044 4
454 4
50 4

 

GAP gINT FN. FOta|

Ri2

 

 

Section 73

o™

 

EXPLANATION OF NOTES, ABBREVIATIONS & TERMS
USED ON BOREHOLE AND TEST PIT REPORTS

 

DRILLING/EXCAVATION METHOD

AS Auger Screwing RD Rotary blade or drag bit HQ Diamond Core - 63 mm

AV Auger V-Bit RT Rotary Tricone bit NMLC Diamond Core - 52 mm
ATC Auger TC-Bit RAB Rotary Air Blast NQ Diamond Core - 47 mm

HA Hand Auger RC Reverse Circulation BH Tractor mounted backhoe
WB Washbore or Bailer PT Push Tube EX Tracked hydraulic excavator
JET Jetting CT Cable Tool Rig EE Existing Excavation

 

PENETRATION/EXCAVATION RESISTANCE
L Low resistance. Rapid penetration possible with little effort from the equipment used.

M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used.

H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires
significant effort from the equipment.

R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to

the digging implement or machine.

These assessments are subjective and are dependent on many factors including the equipment power, weight, condition

of excavation or drilling tools, and the experience of the operator.

 

WATER

Ww Waiter level at date shown <j Partial water loss

ce Water inflow | Complete water loss
GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling
OBSERVED water, surface seepage or cave in of the borehole/test pit.
GROUNDWATER NOT The borehole/test pit was dry soon after excavation, however groundwater could be
ENCOUNTERED present in less permeable strata. inflow may have been observed had the borehole/test pit

been left open for a longer period.

 

SAMPLING AND TESTING

 

 

 

 

 

 

 

SPT Standard Penetration Test to AS1289.6.3.1-1993

4,7,11  N=18 4,7,11 = Blows per 150mm. _N = Blows per 300mm penetration following 150mm seating

30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported

RW Penetration occurred under the rod weight only

HW Penetration occurred under the hammer and rod weight only

HB Hammer double bouncing on anvil

DS Disturbed sample

FP Field permeability test over section noted

FV Field vane shear test expressed as shear strength sy

PID Photoionisation Detector reading in ppm

PM Pressuremeter test over section noted

PP Pocket penetrometer test (expressed as instrument reading in kPa)

U63 Thin walled tube sample - number indicates nominal sample diameter in millimetres

Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects)
R=0 No visible evidence of contamination R=A No non-natural odours identified
R=1 Slight evidence of visible contamination R=B Slight non-natural odours identified
R=2 Visible contamination R=C Moderate non-natural odours identified
R=3 Significant visible contamination R=D Strong non-natural odours identified

ROCK CORE RECOVERY

TCR = Total Core Recovery SCR = Solid Core Recovery RQD = Rock Quality Designation

— Length of core recovered 100% Y Length of ovlindsical 4 _ > Axial lengths of core > 100mm long e100

Length of core run =~ . 1 “ ¢ «100 Length ofcore run

 

ROCK STRENGTH TEST RESULTS

 

v Point Load Strength Index (Isso) (Axial test - MPa)
4 Point Load Strength Index (Isso) (Diametral test - MPa)
@ Uniaxial Compressive Strength (UCS) test result (MPa)

 

 

 

GAP Form No. 6

RL2

Section 74

 

Piscine

METHOD OF SOIL DESCRIPTION

USED ON BOREHOLE AND TEST PIT REPORTS

 

GRAPHIC LOG - TYPICAL SYMBOLS FOR SOILS

 

| FILL

| GRAVEL (GP OR GW}

 

 

SAND (SP OR Sw}

S| SILT (ML OR MH)

 

 

 

 

TCLAY ICL, COR CH)

 

 

 

“4 ORGANIC SOILS
{(OLOR OH OR PY

 

 

2°42] COBBLES OR BOULDERS

 

 

 

Combinations of these basic symbols may be used to indicate mixed materials such as sandy clay.

 

CLASSIFICATION AND INFERRED STRATIGRAPHY

Soil and Rock is classified and described in Reports of Boreholes and Test Pits using the preferred method given in
AS1726 - 1993, Appendix A. The material properties are assessed in the field by visual/tactile methods.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Particle Size Plasticity Properties
Major Division |Sub Division |Particle Size
40
BOULDERS > 200 mm cH
el High plasticity
COBBLES 63 to 200 mm Medium ciay
@ 30 ch “oy
‘Coarse 20 to 63 mm = Low plasticity
GRAVEL Medium 6.0 to 20 mm 5 oy
5 = 20 MH
Fine 2.0 to 6.0 mm . High liquid
2 Timit silt
Coarse 0.6 to 2.0 mm =
SAND Medium 0.2 to 0.6 mm z 10 edi igus
= Lindt silt
Fine 0.075 to 0.2 mm Ci Clays ™
ML - Low liquid Umit silt
SILT 0.002 to 0.075 mm 0
0 10 20 30 40 50 60 70 80
CLAY < 0.002 mm ? Liquid Limit (%
MOISTURE CONDITION AS1726 - 1993
Symbol Term Description
D Dry Sands and gravels are free flowing. Clays & Silts may be brittle or friable and powdery.
M Moist Soils are darker than in the dry condition & may feel cool. Sands and gravels tend to cohere.
Ww Wet Soils exude free water. Sands and gravels tend to cohere.

 

 

CONSISTENCY AND DENSITY

AS1726 - 1993

 

 

 

 

 

 

 

Symbol Term Undrained Shear Symbol Term Density Index % SPT “N” #
Strength
VS Very Soft 0 to 12 kPa VL Very Loose Less than 15 Oto4
Soft 12 to 25 kPa L Loose 15 to 35 4to 10
F Firm 25 to 50 kPa MD | Medium Dense 35 to 65 10 to 30
St Stiff 50 to 100 kPa D Dense 65 to 85 30 to 50
VSt Very Stiff 100 to 200 kPa VD Very Dense above 85 Above 50
H Hard above 200 kPa

 

 

 

 

 

# SPT correlations are not stated in AS1726 — 1993, and may be subject to corrections for overburden pressure and

equipment type.

In the absence of test results, consistency and density may be assessed from correlations with the observed behaviour

of the material.

 

 

GAP Form No. 5

RIA

Section 75

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMS FOR ROCK MATERIAL STRENGTH & WEATHERING
AND ABBREVIATIONS FOR DEFECT DESCRIPTIONS
STRENGTH
Symbol Term Point Load Field Guide
Index -Isso
(MPa)
EL Extremely < 0.03 Easily remoulded by hand to a material with soil properties.
Low
VL Very 0.03 to 0.1 | Material crumbles under firm blows with sharp end of pick; can be
Low peeled with knife; too hard to cut a triaxial sample by hand. Pieces
up to 30 mm can be broken by finger pressure.

L Low 0.1 to 0.3 | Easily scored with a knife; indentations 1 mm to 3 mm show in the}
specimen with firm blows of pick point; has dull sound under hammer.
A piece of core 150 mm long by 50 mm diameter may be broken by|
hand. Sharp edges of core may be friable and break during handling.

M Medium 0.3 to 1 Readily scored with a knife; a piece of core 150 mm long by 50 mm
diameter can be broken by hand with difficulty.

H High 1to3 A piece of core 150 mm long by 50 mm diameter can not be broken by
hand but can be broken with pick with a single firm blow; rock rings
under hammer.

VH Very 3 to 10 Hand specimen breaks with pick after more than one blow; rock rings
High under hammer. ,
EH Extremely >10 Specimen requires many blows with geological pick to break through
High intact material; rock rings under hammer.
ROCK MATERIAL WEATHERING
Symbol Term Field Guide
RS Residual Soil developed on extremely weathered rock; the mass structure
Soil and substance fabric are no longer evident; there is a large change
in volume but the soil has not been significantly transported.
Ew Extremely Rock is weathered to such’an extent that it has soil properties - i.e. it
Weathered either disintegrates or can be remoulded, in water.
HW Distinctly Rock strength usually changed by weathering. The rock may be
pw Weathered highly discoloured, usually by iron staining. Porosity may be
MW increased by leaching, or may be decreased due to deposition of
weathering products in pores.
Sw Slightly Rock is slightly discoloured but shows little or no change of strength
Weathered relative to fresh rock.
FR Fresh Rock shows no sign of decomposition or staining.
ABBREVIATIONS FOR DEFECT TYPES AND DESCRIPTIONS
Defect Type Coating or Infilling ‘Roughness
B Bedding parting Cn Clean SI Slickensided
xX Foliation Sn Stain Sm Smooth
L Cleavage Vr Veneer Ro Rough
J Joint Ct Coating
SZ Sheared zone (Fault) Planarity Vertical Boreholes - The dip
cs Crushed seam (Fault) Pl Planar (inclination from horizontal) of the
DS Decomposed seam Un Undulating defect is given.
Is Infilled seam St Stepped Inclined Boreholes - The
Ss Schistocity inclination is measured as the
Vv Vein acute angle to the core axis.

 

 

 

 

a oy

Section 76

Appendix B

Table B1 — Summary of Geotechnical Laboratory Testing
Geotechnical Laboratory Test Results

Section 77

August 2004

TABLE B1 - SUMMARY OF GEOTECHNICAL LABORATORY TESTING

   

Test Results

 
   
  

 
 
   

  

      
      
  

   
  
 

   
   

    

  
   

Dry Density {t/cum.)
Moisture Content (%

 

       

    

    

    

      

Test Location
Sample Depth (m)
Liquid Limit (%)
Plastic Limit (%)}
Plastic Index (%)
Linear Shrinkage (%)
Percent Passing 0.075 mm
Moisture Content (%)
Shrink-Swell Index (%)
CBR Value (%)

In Situ Density (t/cum.)
Emerson Class No.

Golder Associates

04682104

Comments

Section 78

 

 

 

California Bearing Ratio Report

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

arenrdance with its tarms of accreditation. This

Client: Golder Associates Pty Ltd Report Number : G4004 - 48
Job Number: 4004 Report Date : 09/08/2004
Project : Laboratory Testing Order Number :
Location : Project No:04682104,Commercial Dev.Eenie Greek Rd. Test Method - AS1289.6.1.1
Lab No: 56886 Sample ID: - Sample Location
| Date Sampled: 21/07/2004 GM
Date Tested: 28/07/2004 MC Method : AS 1289.2.1.1 Depth 0.3 - 0.5m
Sampled By: Client
Sample Method: =~
Material Source: Site
For Use As: - Lot Number. -
Remarks: Item Number: :
Maximum Dry Density - MDD (t/m*) = 1.77
Optimum Moisture Content - OMC (%) = 16.5
Compactive Effort : Standard
Nominated % Maximum Dry Density Compaction : 100.0
Nominated % Optimum Moisture Content Compaction : 100.0
Achieved Dry Density before Soak (t/m*) : 1.77
Achieved Percentage of Maximum Dry Density (%) : 100
Achieved Moisture Content (%) : 16.3
\|Achieved Percentage of Optimum Moisture Content (%) : 99
Test Condition (Soaked/Unsoaked) / Soaking Period (Days) : Soaked / 4.
Swell (%) / Surcharge (kg): 05 / 45 kg
Dry Density after Soak (t/m*) : 1.76
Moisture Content after Soak (%) : 17.5
Density Ratio after Soak (%) : 100
Field Moisture Content (%) : 48.0
Moisture Content (Top) after Penetration (%) : 18.2
Moisture Content_(Remainingl) after Penetration (%) : 16.9
CBR 2.5mm (%) : 8
CBR 5.0mm (%) : 8
Minimum Specified CBR Value (%) :
CBR Value (%) : 8
Soil Description: Sandy Clay(Cl)-medium plasticity, fine to medium sand
. APPROVED SIGNATORY Form Number:
This Laboratory is accredited by the National
Association of Testing Authorities, Austratia. The UN =
test(s) reported herein have been performed in REP CBR-1

Mei Burnett

 

Section 79

 

 

 

California Bearing Ratio Report

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Client: Golder Associates Pty Ltd Report Number : G4004 - 49
Job Number: 4004 Report Date : 09/08/2004
Project : Laboratory Testing Order Number :

Location : Project No:04682104,Commercial Dev.Eenie Creek Rd. Test Method : AS1289.6.1.1
Lab No: 56887 Sample ID: - Sample Location

Date Sampled: 21/07/2004 GAS

Date Tested: 28/07/2004 MC Method : AS 1289.2.1.1 Depth 0.3 - 0.6m

Sampled By: Client

Sample Method: 7°

Material Source: Site

For Use As: - Lot Number: -
Remarks: {tem Number: :
Maximum Dry Density - MDD (t/m®) : 41.69
Optimum Moisture Content - OMC _(%) : 20.0
Compactive Effort : Standard
Nominated % Maximum Dry Density Compaction : ' 100.0
Nominated % Optimum Moisture Content Compaction : 400.0
Achieved Dry Density before Soak (t/m*) : 4.69
Achieved Percentage of Maximum Dry Density (%) : 100
Achieved Moisture Content (%) : 19.5
Achieved Percentage of Optimum Moisture Content (%) : 98
Test Condition (Soaked/Unsoaked) / Soaking Period (Days) : Soaked / 4
Swell (%) / Surcharge (kg): 2.0 / 4.5 kg
Dry Density after Soak (t/m*) : 1.65
Moisture Content after Soak (%) : 22.3
Density Ratio after Soak (%) : 98
Fietd Moisture Content (%) : 15.0
Moisture Content (Top) after Penetration (%) : 24.4
Moisture Content (Remainingl) after Penetration (%) : 21.8
CBR 2.5mm (%) : 6
CBR 5.0mm (%) : 7
Minimum Specified CBR Value (%) :

CBR Value (%) : 7

 

 

Soil Description: Silty Sandy Clay(CH)-high plasticity,orange brown/grey, fine to medium sand

 

 

This Laboratory is accredited by the National
Association of Testing Authorities, Australia. The
test(s) reported herein have been performed in
anrardanra urith ite farme nf accreditation This

 

 

APPROVED SIGNATORY

Form Number:

REP CBR-1

 

Section 80

 

 

 

California Bearing Ratio Report

 

 

 

Client : Golder Associates Pty Ltd Report Number : G4004 - 50
Job Number: 4004 Report Date : 09/08/2004
Project : Laboratory Testing Order Number :

Location : Project No:04682104,Commercial Dev.Eenie Creek Rd. Test Method : AS1289.6.1.1
Lab No: 56888 Sample ID: - Sample Location

Date Sampled: 21/07/2004 GAS

Date Tested: 28/07/2004 MC Method : AS 1289.2.1.1 Depth 0.2 - 0.6m

Sampled By: Client

Sample Method: =~
Material Source: Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For Use As: i. Lot Number: -
Remarks: item Number: =
Maximum Dry Density - MDD (t/m®) : 1.77
Optimum Moisture Content - OMC (%) : 16.0
Compactive Effort : Standard
Nominated % Maximum Dry Density Compaction : 100.0
Nominated % Optimum Moisture Content Compaction : 100.0
Achieved Dry Density before Soak (t/m*) : 1.77
Achieved Percentage of Maximum Dry Density (%) : 100
Achieved Moisture Content (%) : 16.3
Achieved Percentage of Optimum Moisture Content (%) : 102
Test Condition (Soaked/Unsoaked) / Soaking Period (Days) : Soaked / 4
Swell (%) / Surcharge (kg): 10 / 4.5 kg
Dry Density after Soak (t/m®) : 1.76
Moisture Content after Soak (%) : 18.2
Density Ratio after Soak (%) : 100
Field Moisture Content (%) : 1.2
Moisture Content (Top) after Penetration (%) : 18.1
Moisture Content (Remaining!) after Penetration (%) : 16.1
CBR 2.5mm (%) : 9
CBR 5.0mm (%) : 10
Minimum Specified CBR Value (%) :
CBR Value (%) : 10
Soil Description: Sandy Clay(Cl)-medium plasticity,grey brown fine to medium sand

N This Laboratory is accredited by the National APPROVED SIGNATORY Form Number:

A Association of Testing Authorities, Australia. The

T test(s) reported herein have been performed in
a

ananrdanna utith ite tarme nf arcroditatinn Thic

 

OE) REP CBR-1
Me! Burnet

 

Section 81

 

 

 

California Bearing Ratio Report

 

 

 

Sampled By: Client
Sample Method: ~
Material Source: Site

Client : Golder Associates Pty Ltd Report Number : G4004 - 54
Job Number: 64004 Report Date : 09/08/2004
Project : Laboratory Testing Order Number :

Location : Project No:04682104,Commercial Dev.Eenie Creek Rd. Test Method : AS1289.6.1.1
Lab No: 56896 Sample ID: - Sample Location

Date Sampled: 22/07/2004 GA 20

Date Tested: 28/07/2004 MC Method : AS 1289.2.1.1 Depth 0.2 - 0.5m

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For Use As: - Lot Number: -
Remarks: Item Number: -
Maximum Dry Density - MDD (t/m?} : 1.77
Optimum Moisture Content - OMC (%) : 13.5
Compactive Effort : Standard
Nominated % Maximum Dry Density Compaction : 100.0
Nominated % Optimum Moisture Content Compaction : 100.0
Achieved Dry Density before Soak (t/m*) : 4.77
Achieved Percentage of Maximum Dry Density (%) : 100
Achieved Moisture Content (%) : 13.8
‘Achieved Percentage of Optimum Moisture Content (%) : 101
Test Condition (Soaked/Unsoaked) / Soaking Period (Days) : Soaked / 4
Swell (%) / Surcharge (kg): 05 / 45 kg
Dry Density after Soak (t/m*) : 1.76
Moisture Content after Soak (%) : 15.7
Density Ratio after Soak (%) : 100
Field Moisture Content (%) : 8.9
Moisture Content (Top) after Penetration (%) : 15.6
eee mm Sew Rs co ints 4149
CBR 2.5mm (%) : 12
CBR 5.0mm (%) : 16
Minimum Specified CBR Value (%) °
CBR Value (%): 16

 

 

Soil Description: Silty Clayey Sand(SC)-fine to medium grained,dark grey, yellow mottied,low plastic fines

 

This Laboratory is accredited by the National
Association of Testing Authorities, Australia. The
test(s) reported herein have been performed in

aa etn nn ek A tae AE Ann eaditntian Thin

 

APPROVED SIGNATORY Form Number:

AS REP CBR-4

Mal Rurnatt

 

Section 82

 

 

 

Shrink Swell Report

 

 

 

 

 

 

 

 

 

 

Client: Golder Associates Pty Ltd Report Number : G4004 - 52
Job Number: ©4004 Report Date : 09/08/2004
Project : Laboratory Testing Order Number :
Location : Project No:04682104,Commercial Dev.Eenie Creek Rd. Test Method : AS1289.7.1.1
_ |Lab No: 56898 Sample ID Sample Location
{Date Sampled: 22/07/2004 SANS
Date Tested: 23/07/2004 Pepin og -oum
Sampled By: ° Client
Sample Method:
Materia! Source: Site
For Use As: Lot Number:
Remarks: ttem Number:
Page 1 of 1
Shrinkage Moisture Content (%) 24-6 Swell MC Betore(%) 25-4 swellmc Atier(%) 22-2
Shrinkage (%) A6 Swell (%) + 1.4
Unit Weight (tim*) 2.03 PP (kPa) Before PP (kPa) After
Shrink-Swell Index (Iss %) 2.9

 

Visual Classification Sandy Clay(CH)-high plasticity,pale grey/yellow brown,fine to medium sand

 

 

 

leet Matestat Pattenata vor. O
Cracking No Cracking
Crumbling No Crumbling

 

 

Ta

This Laboratory is accredited by the National
Association of Testing Authorities, Australia. The
test(s) reported herein have been performed in
accordance with its terms of accreditation. This

APPROVED SIGNATORY

Mel Burnett

Form Number:

REP SHSW-1

 

 

Section 83

_

 

 

 

Shrink Swell Report

 

 

 

 

 

 

 

 

 

 

Client : Golder Associates Pty Ltd Report Number : G4004 - 53
Job Number: 4004 Report Date : 09/08/2004
Project : Laboratory Testing Order Number :
Location : Project No:04682104,Commercial Dev.Eenie Creek Rd. Test Method : AS1289.7.1.1
Lab No: 56919 Sample ID Sample Location
bate Sampled: 22/07/2004 GA?
Date Tested: 26/07/2004 Depmmoe oem
Sampled By: Client
Sample Method:
Material Source: Site
For Use As: Lot Number:
Remarks: ltern Number:
Page 1 of 1
Shrinkage Moisture Content (%) 17-6 Swell MC Before(%) 23-8 swetcatter%) _ 31-0
Shrinkage (%) 2.8 Swell (%) + 6.4
Unit Weight (t/m*) 1.94 PP (kPa) Before PP (kPa) After
Shrink-Swell Index (Iss %) 3.3

 

Visual Classification

Sandy Clay(CH)-high plasticity,grey/yellow brown,fine to medium sand

 

*>|inert Material Estimate (%): 0

 

 

 

 

 

 

Cracking No Cracking
Crumbling No Crumbling
APPROVED SIGNATORY Form Number:
N This Laboratory is accredited by the National
A Association of Testing Authorities, Australia. The

Ta

test(s) reported herein have been performed in
accordance with its terms of accreditation. This

Mel Burnett

REP SHSW-1

 

Section 84

\

on,

 

 

 

Quality of Materials Report

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Client: Golder Associates Pty Ltd Report Number: G4004 - 54
Job Number: 64004 Report Date: 09/08/2004
Project: Laboratory Testing Order Number:
Location Project No:04682104,Commercial Dev.Eenie Creek Rd. Page 1 of 1
Lab No: 56886 Sample ID: Sample Location
Date Sampled: 21/07/2004 Item No: GA1
Date Tested: 27/07/2004 Depth 0.3 - 0.5m
Sampled By: Client
Sample Method:
Material Source: Site
For Use As: Lot Number:
Remarks: Spec Number:
AS. Sieve Sizes Specification Percent Specification
. Minimum Passing Maximum
Test Method: AS1289.3.6.1
75.00 mm :
53.00 mm -
37.50 mm =
26.50 mm >
49.00 mm , -
43.2 mm -
9.50 mm. -
6.70 mm -
4.75 mm “
2.36 mm =
1.18 mm -
0.600 mm =
0.425 mm -
0.300 mm =
0.150 mm -
0.075 mm 66
Atterberg Tests Test Method Specification Result Specification
Liguid Limit (%) AS 1289.35.11 st
Plastic Limit (%) AS1289.3.2.1 16
Plasticity Index AS1289.3.3.1 21
Linear Shrinkage (%) AS1289.3.4.1 12.0
PL. x % Passing 0.425 mm
L.S. x % Passing 0.425 mm
Ratio of % Passing (0.075 / 0.425)
APPROVED SIGNATORY Form Number:
N This Laboratory is accredited by the National
A Association of Testing Authorities, Australia. The

 

Ta

test(s) reported herein have been performed in
accordance with its terms of accreditation. This

Mel Burnett

REP QUAL-1

 

Section 85

 

 

 

Oualitv of Materials Report

 

 

Client: Golder Associates Pty Ltd Report Number: G4004 - 55
Job Number; G4004 Report Date: 09/08/2004
Project: Laboratory Testing Order Number:
Location Project No:04682104,Commercial Dev.Eenie Creek Rd. Page 1 of 1
Lab No: 56887 Sample ID: Sample Location

/ Date Tested: 2710712004 Depth 0.3 - 0.6m

u . |Sampled By: Client

Sample Method:
Material Source: Site
For Use As:

AS. Sieve Sizes Specification
Minimum

Test Method: AS1289.3.6.1_

Lot Number:

Percent Specification

Passing Maximum

 

75.00 mm

 

 

 

37.50 mm
26.50 mm
19.00 mm

13.2 mm

 

 

 

 

9.50 mm

 

4.75 mm

 

2.36 mm

 

1.18 mm

oo

 

0.425 mm

 

0.300 mm

 

0.150 mm

 

 

 

NATE cam

Liquid Limit (%) | AS 1289.3.1.1 |

[L.S. x % Passing U¥.425 mm { L
i i

 

 

71

1 BB ™aw. FP AD accordance with its terms of accreditation. This | Mier murnece 1

 

a 3

Section 86

 

 

Job Number: “7vY™

Bab awndnns Tanbinn

a

Repu vai.

 

 

 

 

 

 

Piant
A.S. Sieve Sizes Specification | Percent | Specification

t 37.50 mm | ] - j 4
k T t T 1
| 4.12 TTT j 1 4 een}
F ae T T 7 1
r~ 9150 mm ] ] - |

[eiquid Limit (%) [_AS 1289.3.1.1 | | 34 | |
[ES x % Passing 0.425 mm | | | f |
1 BN EF AW accordance with its terms of accreditation. This | Met burnett

Section 87

C

Job Number:

iSamnled Rv:

wore

 

LD nhanuatams Tartine

Clinnt

AS. Sieve Sizes

37.50 mm

era,

Specification

 

Report vee.

Percent

 

Specification

Section 88

Appendix C

Table C1 — Summary of ASS Testing
Environmental Laboratory Test Results (Soil)

Section 89

August 2004

TABLE C1 - SUMMARY OF ACID SULFATE SOIL FIELD AND LABORATORY ANALYSIS RESULTS

04682104

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1. Shaded pHrox results are those pHr- 2.0 Units‘or pH <3 at

 

2. Shaded TAA, Spos & % So, results are those exceeding the QASSIT action levels of 18 mol H'it or 0.03 %S.
3, Acid-Base Account = Total Acidity (ie. Potential + Actual + Retained) - Total ANC, but not less than TSA.

4, Required Lime Rate is calculated from the net Acid-Base Account with a factor of Safety = 1.5

IGA16 0.25 |Silty SAND, light grey 42 3.4 4
0,50 |Silty SAND, light grey 46 3.8 4 46 <0,04 4
0.75 |SAND, light grey, light brown 46 40 1
4.00 |Clayey SAND, light grey, light br 45 39 4 45 <0.01 4
1.25 |Silty CLAY, light grey, light brown 45 40 1
1,50 |Silty CLAY, light grey, light brown 44° 39 1 4.0 <0.01 7
1,76 |Silty CLAY, light grey, light brown 45 38 4
2.00 |Silty CLAY, light grey, light brown 44° 38 1
2.25 |Silty CLAY, It grey, it br, red 44° 3.8 4
2.80 |Silly CLAY, It grey, It br, red 45 38 1
2.75 |Sandy CLAY, It grey, red, it br 46 4.0 1
3.00 |Sandy CLAY, it grey, red, It br 49 40 1
GAI7 0.25 |Silty SAND, light grey 45 34 2 38 <0.07 5
0.80 |SAND, light grey 46 43 4
0.75 |SAND, light grey, pale brown, 46 39 4 AS <0.01 3
1.00 |SAND, light grey, pale brown 46 42 4
1.25 |Sandy CLAY, light grey, light br 47 39 1 40 <0.01 7
1.50 |Silty Sandy CLAY, It grey, red, It 49 39 2 41 <0.01 5
1.75 |Silty Sandy CLAY, It grey, red, It 46 39 1
2.00 |Silty Sandy CLAY, It grey,red,It} 4.7 4.0 1
2.25 |Silty Sandy CLAY, p grey, red 45 39 1 .
2.50 |Silty Sandy CLAY, p grey, red 43° 42 1
2.75 |Silty Sandy CLAY, p grey, red 47 42 1
3.00 |Silty Sandy CLAY, p grey, red 45 40 1
IGA18 0.25 [Silty SAND, light grey 62 42 1
0.50 |Clayey SAND, light grey, pale br 49 31 2 39 <0.01 8
0.75 |Sandy CLAY, light grey, pale br 50 42 1
1.00 | Silty Sandy CLAY, it grey, p br 5.0 39 1 39 <0.01 7
1.25 |Silty Sandy CLAY, It grey, p br 50 39 1
1.50 |Silty Sandy CLAY, p grey, red 51 4.0 2 37 <0.01 42
1.75 |Silty Sandy CLAY, p grey, red 5.0 4.1 1
2.00 {Silty Sandy CLAY, p grey, red 5.0 44 1
2.26 |Silty Sandy CLAY, p grey, red 49 45 1
2.50 |Silty Sandy CLAY, p grey, red 48 43 1
2.75 {Silty Sandy CLAY, p grey, red 48 42 1
3.00 |Silty Sandy CLAY, p grey, red 48 44 1
Notes:

 

 

Golder Associates

Section 90

Noosa Civic
Engineering Report




Noosa Civic




APPENDIX



B
Construction EMP




QIC Noosa Civic Pty Ltd         Version 1   November 2014
engineering report_final.docx                      Page i

Section 91

Noosa
 Insert Civic
        report title here
Construction
 Insert projectEnvironmental
                name
Management Plan
  Insert job reference
J13041




  Prepared for
  QIC Noosa Civic Pty Ltd


  November 2014

Section 92

Noosa Civic
Construction Environmental Management Plan




Contact Information                               Document Information
Cardno (QLD) Pty Ltd                              Prepared for     QIC Noosa Civic Pty Ltd
ABN 57 051 074 992                                Project Name     Noosa Civic
                                                  File Reference   O:\J13041\WP\engineering
Level 11 Green Square North Tower
                                                                   report\Appendices\Appendi
515 St Paul’s Terrace
                                                                   x B - Construction
Fortitude Valley QLD 4006
                                                                   EMP.docx
Locked Bag 4006 Fortitude Valley
                                                  Job Reference    J13041
Telephone: 07 3369 9822                           Date             November 2014
Facsimile: 07 3369 9722
International: +61 7 3369 9822

[email protected] Noosa Civic Pty Ltd                      Version 1                             November 2014
Appendix B - Construction EMP.docx                                                        Page ii

Section 93

Noosa Civic
Construction Environmental Management Plan




Table of Contents
1        Introduction                                                                                      1
2        Objectives                                                                                        2
3        Environmental Management Plan Preamble                                                            3
         3.1            Legislative Framework                                                              3
         3.2            Terminology                                                                        3
         3.3            Program and Contractual Obligations                                                4
         3.4            Non-compliance with the CEMP and Corrective Action Requirements                    4
         3.5            Emergency and Contingency Plans                                                    4
                        3.5.1     Heavy or Prolonged Rainfall                                              5
                        3.5.2     Halt in Construction Works due to Unforeseen Circumstances               5
                        3.5.3     Spill Response Measures                                                  5
                        3.5.4     Environmental Incidents and Emergencies                                  6
         3.6            Competence, Training and Awareness                                                 6
4        Environmental Management Measures                                                                 7
         4.1            Element 1: Acid Sulfate Soils                                                      7
         4.2            Element 2: Cultural Heritage                                                      10
         4.3            Element 3: Soil Erosion & Sediment Loss                                           12
         4.4            Element 4: Fauna and Flora, Weeds and Pests.                                      16
         4.5            Element 5: Storage and Handling of Hazardous Materials                            20
         4.6            Element 6: Public Amenity and Community                                           22
         4.7            Element 7: Waste Management                                                       26
         4.8            Element 8: Traffic Control Management                                             28



Tables
Table 4-1          Construction Stormwater Quality Objectives                                             13
Table 4-2          General nuisance noise level limits                                                    23




QIC Noosa Civic Pty Ltd                                  Version 1                             November 2014
Appendix B - Construction EMP.docx                                                                   Page iii

Section 94

Noosa Civic
Construction Environmental Management Plan




1                  Introduction
QIC Noosa Civic Pty Ltd (QIC) is proposing to expand Noosa Civic located at 28 Eenie Creek Road,
Noosaville, within Noosa Shire.
The site of the proposed expansion is currently in an undeveloped natural state.
Cardno (Qld) Pty Ltd (Cardno) was commissioned to provide environmental management planning services
to the applicant in relation to the design and environmental management of the construction works.
This Construction Environmental Management Plan (CEMP) has been prepared by Cardno to provide details
of the environmental management requirements for construction of the project, as well as certain operational
aspects.
This CEMP provides overarching performance criteria that are to be met in order to minimise impacts of the
works on the surrounding physical and social environment. In particular, the aims of this CEMP are to
ensure that:
     commitments and recommendations made by this CEMP and relevant technical reports for the purpose
      of protecting environmental values are implemented during the operational works;
     a high level of environmental care and responsibility is demonstrated and best practice environmental
      management is achieved during the construction phase of the project;
     compliance with relevant legislation and permit conditions are demonstrated and satisfied; and
     environmental responsibilities, monitoring, reporting and auditing procedures are established to
      demonstrate due diligence.
While this CEMP will form the basis of the contractor’s corresponding Plan, it is not intended as a
replacement for due consideration of the management of issues and impacts by the contractor.




Noosa Civic                                         Version 1                                    November 2014
Appendix B - Construction EMP.docx                                                                     Page 1

Section 95

Noosa Civic
Construction Environmental Management Plan




2                  Objectives
This CEMP provides clear performance criteria for the construction phase of the development that are to be
met in order to minimise adverse impacts to the receiving environment. In particular, this CEMP provides
mechanisms whereby the environmental performance associated with the construction works can be
measured, and provides procedures for the implementation of agreed corrective actions, if required.
To satisfy the above objectives, this CEMP addresses the following key components:
     Rationale: identification of the element to be managed and the potential for environmental impact of
      activities associated with each element;
     Objectives: identification of the environmental objectives and targets to be achieved in line with the
      rationale and in compliance with applicable legislation;
     Tasks/Actions: monitoring and management measures to be implemented in order to achieve the
      stated objectives and targets to ensure impact mitigation;
     Performance Indicators: measurable indicators and standards set to assess the efficiency of
      management measures and determine compliance with the associated operational plans;
     Monitoring: monitoring requirements to measure compliance with the performance indicators and
      frequency of monitoring;
     Reporting and Review: the requirements for reporting of monitoring results and review of management
      measures where required; and
     Corrective Actions: measures to be undertaken should monitoring indicate non-compliance with
      performance indicators.
The CEMP is a flexible living document which should be updated to reflect any changes in the project and be
updated with any self-monitoring, feedback and reviews conducted.
This CEMP shall be reviewed if the construction design undergoes substantial changes prior to
commencement of the works.
The Contractor undertaking the works shall assume responsibility for the implementation of this CEMP.




Noosa Civic                                        Version 1                                   November 2014
Appendix B - Construction EMP.docx                                                                   Page 2

Section 96

Noosa Civic
Construction Environmental Management Plan




3                  Environmental Management Plan Preamble
3.1                Legislative Framework
The Environmental Protection Act 1994 (EP Act) protects environmental values through development and
implementation of environmental protection policies and regulates environmentally relevant activities
prescribed in the Environmental Protection Regulation 2008 (EP Reg).
The EP Reg provides details for matters dealt with in the EP Act, including procedures for environmental
impact statements, environmentally relevant activities, and environmental nuisance.
The Environmental Protection (Water) Policy 2009 (EPP Water) ensures protection of environmental values
from activities that may result in the release of contaminants to watercourses or stormwater drains.
The Environmental Protection (Air) Policy 2008 (EPP Air) ensures protection of ambient air quality and
specifies indicators and air quality goals for control of the release of airborne contaminants.
The Environmental Protection (Noise) Policy 2008 (EPP Noise) specifies an acoustic quality objective for the
protection of well-being and amenity of individuals and the community in residential areas. Planning noise
levels are also specified for development of beneficial assets.
The Nature Conservation Act 1992 (NC Act) and subordinate legislation provides a framework for the
conservation of nature, by specifying management principles and intents for areas and species of
conservation significance.
The Vegetation Management Act 1999 (VM Act) and subordinate legislation regulates the clearing of native
vegetation mapped as either remnant vegetation on a regional ecosystem (RE) map or remnant map, or
regulated regrowth vegetation identified on a regrowth vegetation map, as well as native woody vegetation
on State lands.
The Sustainable Planning Act 2009 (SPA), together with the subordinate Sustainable Planning Regulation
2009 (SPR), seeks to achieve ecological sustainability by managing the process by which development
takes place, managing the effects of development on the environment, and continuing the coordination and
integration of planning at the local, regional and State levels.
The Land Protection (Pest and Stock Route Management) Act 2002 governs the management of pest plants
and animals, and the application of controls and restrictions on ‘declared pests’.
The Aboriginal Cultural Heritage Act 2003 defines the duty of care to ensure that all reasonable and practical
measures are taken to prevent damage to places and objects of Aboriginal cultural, historical or
archaeological significance.
The Work Health and Safety Act 2011 ensures protection of all personnel and the environment when storing
and handling dangerous goods.

3.2                Terminology
The term Act refers to the EP Act 1994.
The term the proponent or the operator refers to QIC Noosa Civic Pty Ltd.
The term NSC refers to the Noosa Shire Council.
The term CEMP refers to this Construction Environmental Management Plan.
The term DEHP refers to the Department of Environment and Heritage Protection.
The term Environmental Officer refers to the person nominated by the Contractor to oversee environmental
matters mentioned within this CEMP.
The terms Principal, Superintendent, Contractor and Works shall have the meaning assigned to them
under the Contract. It is understood that the Project Manager will be the Contractor’s representative onsite.



Noosa Civic                                        Version 1                                     November 2014
Appendix B - Construction EMP.docx                                                                     Page 3

Section 97

Noosa Civic
Construction Environmental Management Plan



The term waters includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water,
unconfined water, natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal
waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and
groundwater and any part thereof.

3.3                Program and Contractual Obligations
This CEMP covers the construction works phase of the proposed development. This is defined as the period
from the commencement of works, including any vegetation clearing and earthworks, to the substantial
completion of the development including road-works, building works, stormwater, sewer and drainage, water
and electrical reticulation and landscaping works.
The Contractor is generally responsible for ensuring that the provisions of the CEMP are met, unless
explicitly stated within this CEMP.
No works are to be undertaken unless all necessary permits have been obtained from the relevant
administering authorities. All works are to be undertaken in accordance with the terms and conditions of
these permits.
The Contractor shall ensure that all persons who are to be employed or sub-contracted for the works shall be
adequately trained in respect of their individual responsibilities as set out in this CEMP and as provided by
the Act, including, but not limited to, the following:
     General Environmental Duty – whereby a person in the performance of their duties shall not do so in a
      manner which will cause, or is likely to cause, environmental harm unless the person takes all
      reasonable and practical measures to prevent or minimise the harm;
     Duty to Notify Environmental Harm – whereby if a person in the performance of their duties becomes
      aware that serious or material environmental harm is caused or threatened then the person must contact
      the Contractor whereupon the Contractor must immediately notify the Principal, NSC and/or DEHP; and
     Compliance with the CEMP – whereby a person in the performance of their duties shall do so in a
      manner that ensures that the provisions of this CEMP are complied with.

3.4                Non-compliance with the CEMP and Corrective Action Requirements
The Contractor shall assume responsibility for implementation of this CEMP. Where the Contractor becomes
aware of a site or operational condition that does not comply with stated performance indicators of this
CEMP, there is a requirement for a corrective action. A Corrective Action Request (CAR) form shall be
completed and authorised where appropriate in general compliance with the example CAR form provided in
Appendix B of this CEMP or similar. The Contractor shall also maintain a register of CARs, which shall
demonstrate that appropriate actions have been completed within a suitable timeframe.
Any CAR registered in accordance with this CEMP shall be provided to the Principal and may be provided to
any Local, State or Commonwealth Government Department, any statutory authority or other person, as
required by law.
The Contractor shall also maintain a register of complaints received in accordance with the activity and
manage the response to such complaints in accordance with a complaints management system which will
track the expeditious resolution of complaints.
Complaints which cannot be resolved in an efficient manner and in accordance with the requirements of the
CEMP shall trigger environmental monitoring where relevant and (where necessary) a review of the relevant
measures of the management plan to identify required improvements in order to address the complaints.
Complaints shall be made available to an administering authority for inspection as required by law,

3.5                Emergency and Contingency Plans
The site shall be appropriately managed to avoid detrimental impact upon the receiving environment external
to the site as a result of emergency situations such as periods of heavy or prolonged rainfall. The site shall
also be managed appropriately in the case of a halt in construction works due to unforeseen circumstances
in order to prevent adverse environmental impacts.

Noosa Civic                                        Version 1                                     November 2014
Appendix B - Construction EMP.docx                                                                     Page 4

Section 98

Noosa Civic
Construction Environmental Management Plan



3.5.1              Heavy or Prolonged Rainfall
Stormwater treatment and conveyance measures shall be employed at the site during the construction phase
to adequately manage stormwater flows. During periods of heavy or prolonged rainfall, the following
precautionary measures shall be implemented:
     the Contractor shall cease construction activities until the site has been adequately drained;
     the Contractor shall inspect erosion and sediment control measures to ensure optimal performance is
      being achieved;
     the Contractor shall recommence construction works only after the site has been assessed and it has
      been determined that the risk of erosion and sedimentation has returned to pre-rainfall conditions; and
     the Contractor shall recommence construction works only after all erosion and sediment control
      measures have been assessed and it is confirmed that all structures are operating at optimal
      performance. Should failures occur, repairs and/or replacements shall be implemented prior to the re-
      commencement of construction works.

3.5.2              Halt in Construction Works due to Unforeseen Circumstances
In the event that construction works are halted due to unforeseen circumstances, the Contractor shall ensure
that all erosion and sediment control measures are intact and operational, and ensure that environmental
deterioration does not occur over the ‘stop works’ period.
Prior to vacating the site, the Contractor shall ensure that any stockpiles are adequately stabilised and the
total disturbed area is minimised to the greatest extent practicable. In addition, any site conditions that could
conceivably degrade over time and result in environmental harm shall be rectified.
The Contractor shall monitor and maintain site erosion and sediment control devices on a continual basis
until work re-commences at the site.

3.5.3              Spill Response Measures
In the event that accidental release of material occurs at the site, the following actions shall be implemented.
     Appropriately trained staff shall take steps to contain the released material, if possible, until remedial
      measures are fully implemented.
     The Contractor shall be notified to make an initial assessment of the severity of the accidental release
      and the nature of the material.
     The Contractor shall notify the Principal and any administering authorities as required by law.
     The Contractor shall take steps in consultation with the relevant administering authorities (if notified) to
      treat, remove or otherwise manage the released material.
     Appropriately qualified personnel shall make an assessment of the area to confirm the success of the
      remediation works and whether additional works are required.
     Appropriately qualified personnel shall assess the work procedures or cause of the failure and implement
      any changes required to prevent reoccurrence of a similar incident in the future.
     Following completion of remedial actions the Contractor shall provide an incident report or CAR to the
      Principal detailing the nature of the incident and the corrective actions implemented.




Noosa Civic                                          Version 1                                         November 2014
Appendix B - Construction EMP.docx                                                                           Page 5

Section 99

Noosa Civic
Construction Environmental Management Plan



3.5.4              Environmental Incidents and Emergencies
The Contractor is to develop an Environmental Incident and Emergency Response procedure including an
Environmental Incident Report form. The procedure shall clearly define response and notification
requirements including all relevant details of those to be contacted in the event of an environmental incident
or emergency. The Environmental Incident Report form shall include the details of the incident, and as a
minimum include:
     date of incident;
     details of the persons who detected or notified the incident (internal and external);
     nature of the incident; and
     details of the corrective actions undertaken.
The Principal and any administering authorities (if required by law) shall be notified of any recorded
environmental incidents or emergencies for appropriate actions as soon as practicably possible.

3.6                Competence, Training and Awareness
Site induction and training for attendance by all contractual staff and employees to inform on general
environmental responsibilities, site-specific values such as ecological values and features to be preserved
(onsite and offsite), environmental management controls, particularly in relation to water quality, are
proposed.




Noosa Civic                                           Version 1                                  November 2014
Appendix B - Construction EMP.docx                                                                     Page 6

Section 100

Noosa Civic
Construction Environmental Management Plan




4                  Environmental Management Measures
4.1                Element 1: Acid Sulfate Soils
Rationale

Given the existing ground levels within the site, and the proposed depths of excavation, it is unlikely that acid sulfate soils will be encountered
during the construction process. However, this Acid Sulfate Soils plan has been prepared to ensure that suitable processes are available if such
soils are encountered.
It is proposed that a geotechnical investigation be carried out within the site prior to the commencement of construction to confirm that acid
sulfate soils will not be disturbed during the construction process. This current plan will only come into force if acid sulfate soils are found during
this investigation.
Management measures relating to material stockpiles are addressed under Element 3: Erosion and Sediment Control.
Objective/Target

To minimise and if possible, avoid the exposure of AASS and/or PASS, and to prevent acid leachate from leaving the site and potentially
impacting on adjacent waters.
Performance Indicators

Compliance with the following guidelines and documentation.
     State Planning Policy (SPP) (Queensland Government, 2014)
     Guidelines for Sampling and Analysis of Lowland Acid Sulfate Soils in Queensland (Ahern CR et al., 1998)
     Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines (Dear et al., 2002)
     Acid Sulfate Soils Laboratory Methods and Guidelines (Ahern et al., 2004)
     Instructions for the Treatment and Management of Acid Sulfate Soil 2001 (EPA, 2001)
To ensure all water runoff and discharges from the site comply with nominated pH levels of 6.5 – 8.5.




Noosa Civic                                                             Version 1                                                         November 2014
Appendix B - Construction EMP.docx                                                                                                              Page 7

Section 101

Noosa Civic
Construction Environmental Management Plan




Management Measures

Tasks                                 Actions / Monitoring                                                                           Timing         Responsibility
Minimise the excavation and           Conduct all management measures required under the management to be specified in               Prior to and   Contractor
exposure of ASS during the works      a Site Based Acid Sulfate Soils Management Plan.                                               during
where possible and if exposure is     Where excavations occur in medium or high risk areas, any materials excavated or               excavation
necessary manage and treat            exposed should be tested and if required treated and neutralised.                              works
accordingly.
                                      Develop an ASS treatment pad to Soil Management Guidelines standards in a suitable
                                      location.
                                      Neutralisation treatment liming rates used must be in accordance with those prescribed
                                      under the Acid Sulfate Soils Management Plan recommendations.
                                      Neutralised material must be reused on-site where possible/feasible.
                                      Conduct verification testing of treated material prior to material re-use as fill or offsite
                                      removal.
                                      The construction works should be sequenced in order to minimise exposure of ASS
                                      where possible. For example no more ASS soils should be exposed than can be
                                      treated in the containment and treatment areas at any given time.
                                      Excavation works of ASS material must be staged in such a way to ensure that the
                                      excavated material is treated as soon as practicably possible and that exposed soil
                                      surfaces are refilled within, and not exposed for longer than, 24-48 hours.
                                      Appropriate management, treatment and disposal of potentially acid contaminated
                                      water runoff and leachate shall be designed and implemented.
Record keeping.                       Maintain appropriately detailed records of the following:                                      Ongoing        Contractor
                                            Results of any Acid Sulfate Soils testing as required by this Acid Sulfate
                                             Soils Management Plan, including verification testing;
                                            Location of soil during the treatment process and rates / total quantities of
                                             ameliorant added to the soil requiring neutralisation; and
                                            Results of surface and ground water monitoring as required by the Acid
                                             Sulfate Soils Management Plan.
                                      Contractor to record all onsite and offsite ASS material movements in a waste tracking
                                      form and provide to Principal at end of project.
                                      Ensure all records and reports are made available to relevant administering authorities


Noosa Civic                                                                    Version 1                                                             November 2014
Appendix B - Construction EMP.docx                                                                                                                         Page 8

Section 102

Noosa Civic
Construction Environmental Management Plan



Tasks                                 Actions / Monitoring                                                                    Timing    Responsibility
                                      upon request.
Corrective actions.                   Should there be non-compliance with the stated performance indicators the following     Ongoing   Contractor
                                      corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                      The Contractor shall implement the corrective action(s) as required within the agreed
                                      timeframe noted on the CAR.




Noosa Civic                                                                 Version 1                                                    November 2014
Appendix B - Construction EMP.docx                                                                                                             Page 9

Section 103

Noosa Civic
Construction Environmental Management Plan



4.2                Element 2: Cultural Heritage
Rationale

Clearing, grubbing and earthworks, as proposed to be undertaken in association with the project, is likely to have the potential to disturb or harm
sites and/or objects of cultural heritage value. While no sites or objects of cultural heritage value are known to occur on site, appropriate
management measures must be implemented in the case of an unexpected cultural heritage find.
Objective/Target

To avoid disturbance to or damage of sites or objects of cultural heritage significance during the works.
Performance Indicators

Compliance with the Aboriginal Cultural Heritage Act 2003 and associated duty of care guidelines and human remains guidelines.
No destruction or damage of sites or objects of cultural heritage value.
Management Measures

Tasks                                   Actions / Monitoring                                                                     Timing    Responsibility
Take all reasonable and practical       In the event of a cultural heritage find being discovered, cease all earthworks          Ongoing   Contractor
measures to ensure the works do         immediately and notify the Superintendent and the Cultural Heritage Coordination Unit
not    harm    aboriginal   cultural    of DEHP.
heritage.
Ensure any findings of sites or
objects which could potentially be
deemed a cultural heritage find are
dealt with appropriately.
Ensure any site or article              Notify the Aboriginal parties for the area and seek their advice and agreement as to     Ongoing   Principal
considered to be of indigenous          how works may best be managed to avoid or minimise harm to the Aboriginal cultural
cultural heritage value is dealt with   heritage.
appropriately, in coordination with     Where agreement cannot be reached with the Aboriginal Party for the area, the duty of
the Aboriginal parties for the area.    care obligation under section 23 of the Aboriginal Cultural Heritage Act 2003 remains,
                                        and all reasonable and practicable measures must be taken to ensure the activity does
                                        not harm Aboriginal cultural heritage including, where necessary, through the
                                        development of a Cultural Heritage Management Plan under Part 7 of the Aboriginal
                                        Cultural Heritage Act 2003.



Noosa Civic                                                                   Version 1                                                     November 2014
Appendix B - Construction EMP.docx                                                                                                               Page 10

Section 104

Noosa Civic
Construction Environmental Management Plan



Tasks                                  Actions / Monitoring                                                                         Timing    Responsibility
Ensure any findings of human           If any human bones are found, notify the Queensland Police and the Cultural Heritage         Ongoing   Contractor
bones are dealt with appropriately     Coordination Unit of DEHP as well as the Superintendent and the Principal.
in accordance with the guidelines      Ensure all bones remain in situ until identified. Do not recommence works until
for the appropriate handling of        notification has been given by the Police or DEHP that suitable arrangements have
Aboriginal and     Torres Strait       been made for removal.
Islander human remains.
Record keeping.                        Ensure all records and reports are made available to relevant administering authorities      Ongoing   Contractor
                                       upon request.
Corrective actions.                    Should there be non-compliance with the stated performance indicators the following          Ongoing   Contractor
                                       corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;

                                            implementation of appropriate mitigation measures as determined by the Principal
                                             in consultation with the Contractor and relevant experts (where required); and

                                            relevant validation monitoring to confirm that the nominated corrective actions have
                                             been effective.
                                       The Contractor shall implement the corrective action(s) as required within the agreed
                                       timeframe noted on the CAR.




Noosa Civic                                                                     Version 1                                                      November 2014
Appendix B - Construction EMP.docx                                                                                                                  Page 11

Section 105

Noosa Civic
Construction Environmental Management Plan




4.3                Element 3: Soil Erosion & Sediment Loss
Rationale

Construction activities will involve grading and infrastructure works, as well as the stockpiling of materials. These activities have the potential to
erode and release sediment into nearby receiving waters, notably the small creek which runs through OS7 and Eenie Creek downstream of the
site. Uncontrolled erosion and sedimentation can also result in direct toxicity to flora and fauna, costly site damage, and reductions in visual and
recreational amenity.
This element of the CEMP does not preclude the Contractor from preparing additional plans containing preferred erosion and sediment control
measures previously demonstrated as successful on sites with similar characteristics. In this regard, a separate Erosion and Sediment Control
Plan (ESCP) has already been prepared by Cardno. Any Contractor ESCP should be consistent with the management intent specified below.
Objective/Target

Compliance with the ESCP and the Stormwater Management Plan (SMP) appended to the Engineering Report for the development.
To minimise the impacts of soil erosion and sedimentation on the receiving environment within and in the vicinity of the construction site.
To minimise any emissions associated with the construction works which have the potential to cause adverse impacts to water quality within Lake
Weyba, Eenie Creek and tributaries.
Performance Indicators

Sediment and erosion control devices are installed and operational prior to the commencement of site establishment and construction activities.
No failure of erosion and sedimentation control devices is detected during construction works.
No erosion or changes in flows of water bodies within or in the vicinity of the site occur as a result of the works.
All stormwater runoff, with potential to contact contaminated areas within the site, is diverted through effective erosion and sediment control.
Unless alternative values are specified in the approved ESCP or SMP, any waters being discharged from the work site are to comply with the
water quality characteristics specified in Table 4-1 below.




Noosa Civic                                                              Version 1                                                       November 2014
Appendix B - Construction EMP.docx                                                                                                            Page 12

Section 106

Noosa Civic
Construction Environmental Management Plan



Table 4-1          Construction Stormwater Quality Objectives 1

         Water Quality Parameter                            Release Criteria
              Suspended Solids                                   < 50 mg/L
              Coarse Sediments                       Retain coarse sediments onsite
                     Turbidity                       < 10% above receiving waters
                         pH                                      6.5 – 8.5
       Hydrocarbons, Oil and Grease                No visible film; no detectable odour
                 Floating matter                              None visible
1
 Queensland Water Quality Guidelines (2009) Table 8.2.1: Summary of design objectives for management of stormwater quality and flow – construction phase of development in
Queensland.

Management Measures

    Tasks                                 Actions / Monitoring                                                                         Timing            Responsibility
    Develop an ESCP for each stage        Undertake an Erosion Hazard Assessment of the site prior to the commencement of              Ongoing           Environmental
    of the project.                       works and ensure the project CEMP and any ESCPs are commensurate with the                                      Management
    Erosion and sedimentation control     degree of environmental risk associated with the proposed works.                                               Officer
    measures must be designed in          Wherever practicable, give priority to the prevention or minimisation of soil erosion,
    accordance with the requirements      rather than the trapping of displaced sediment, and ensure the area of disturbance is
    of the Draft Urban Stormwater –       no greater than the minimum area necessary for the purpose, and limited to the
    Queensland        Best     Practice   shortest amount of time practicable.
    Environmental          Management     Select machinery to carry out the activities on the basis of a type and size necessary
    Guidelines (DERM, 2009) in order      and capable of safe operation to achieve minimal disturbance of the site.
    to     protect     the    receiving
    environment in the vicinity of the    Appropriate sediment and erosion control measures may include sediment fences
    site.                                 (anchored in a 0.2m deep compacted backfilled trench), stormwater diversion drains,
                                          rock check dams and progressive site restoration.
    Implement the ESCP for each
    stage of the project.                 Ensure unprotected slope lengths do not exceed 80m, or an equivalent vertical fall of
                                          3m, prior to a construction shutdown period or anticipated significant rainfall.
                                          Ensure stormwater diversions are included up-catchment of the project disturbance
                                          footprint.
                                          Ensure trenches/excavated areas are backfilled, capped with topsoil and compacted to
                                          a level at least 75mm above the adjoining ground level, and appropriately stabilised.
                                          Machine-compact, seed and mulch all temporary earth banks and flow diversion



Noosa Civic                                                                      Version 1                                                                 November 2014
Appendix B - Construction EMP.docx                                                                                                                              Page 13

Section 107

Noosa Civic
Construction Environmental Management Plan



 Tasks                                 Actions / Monitoring                                                                          Timing            Responsibility
                                       systems for temporary vegetative cover within 10 days after grading.
 Maintain erosion and sediment         Prepare an erosion and sediment control device maintenance schedule and checklist,            Prior        to   Contractor
 control devices to ensure they are    in general compliance with the example provided in the ESCP to be read in conjunction         construction
 effective.                            with this CEMP.
                                       Undertake inspection of erosion and sediment control devices as scheduled, and report         Daily,   and
                                       any failures immediately on a CAR form.                                                       after   every
                                       Remove all material from sediment and erosion control devices following rain. Return          rain    event
                                       uncontaminated material to a secure stockpile area.                                           greater than
                                                                                                                                     25mm.
 Keep stockpiles within designated     Ensure stockpiles of erodible material are:                                                   Ongoing           Contractor
 and controlled areas (kept as far
                                            formed on flat ground in heaps of no more than 2m in height;
 as    practicable   away     from
 watercourses) and prevent the              appropriately protected from wind, rain, concentrated surface flow and upslope
 spread of stockpile material into           stormwater surface flows;
 adjacent areas.                            located at least 2 metres from any retained vegetation or concentrated drainage
                                             line;
                                            located up-slope of an appropriate sediment control system; and
                                            provided with an appropriate protective cover (synthetic or organic) if the materials
                                             are likely to be stockpiled for more than four weeks.
                                       Undertake visual inspection of stockpiles and adjacent areas on a daily basis during          Daily during
                                       construction.                                                                                 construction
 Avoid unnecessary disturbance of      Minimise the removal of riparian, bank and in-stream vegetation wherever possible, in         Prior to and      Contractor
 watercourses,           including     order to reduce the risk of erosion and assist in maintaining the stability of the beds and   during
 ephemeral watercourses.               banks of waters.                                                                              construction
                                       Do not allow excavators to enter the bed of the watercourse.
                                       Mark any buffer areas in the field, and limit vehicular entry into the riparian zone and
                                       stream banks through fencing or flagging, and/or signage.
                                       Ensure all machinery used in the activities is stored, refuelled and maintained outside
                                       the high banks of the watercourses at a minimum distance of 40m.
 Stabilise exposed areas as soon       Undertake, as a minimum, the following stabilisation measures at the site.                    During            Contractor
 as practicable during and/or          Minimise soil exposure e.g. laying gravel, employing an erosion control blanket or            construction
 following construction.               matting.                                                                                      where
                                                                                                                                     practicable,
                                       Retain and/or maintain downslope vegetation/grass cover as a secondary filtration             and following
                                       device for stormwater runoff.                                                                 completion of


Noosa Civic                                                                     Version 1                                                               November 2014
Appendix B - Construction EMP.docx                                                                                                                           Page 14

Section 108

Noosa Civic
Construction Environmental Management Plan



 Tasks                                 Actions / Monitoring                                                                        Timing    Responsibility
                                       Undertake permanent or temporary vegetative stabilisation, e.g. through utilisation of,     works.
                                       where appropriate: 1. topsoil spreading (and compaction, with temporary sediment
                                       controls); 2. grass turfing; 3. surface mulching (note that surface mulching should not
                                       be applied within waters); 4. seeding; and/or 5. planting; in all disturbed areas, having
                                       regard to the future use.
 Record keeping.                       Maintain records of any monitoring results including details of corrective actions and      Ongoing   Contractor
                                       repairs/maintenance undertaken.
                                       Ensure all records and reports are made available to relevant administering authorities
                                       upon request.
 Corrective actions                    Should there be non-compliance with the stated performance indicators the following         Ongoing   Contractor
                                       corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                       The Contractor shall implement the corrective action(s) as required within the agreed
                                       timeframe noted on the CAR.




Noosa Civic                                                                   Version 1                                                       November 2014
Appendix B - Construction EMP.docx                                                                                                                 Page 15

Section 109

Noosa Civic
Construction Environmental Management Plan



4.4                Element 4: Fauna and Flora, Weeds and Pests.
Rationale

Vegetation clearance will be required at the site for earthworks and construction activities. The removal of this vegetation has the potential to
disturb fauna species and adjacent native flora. While existing vegetation within the development areas will only be removed where necessary
for the proposed works, management measures are required to ensure that retained vegetation within and adjacent to the site is protected at all
times, as well as any fauna present.
No vegetation clearance is to be undertaken until relevant permits have been obtained, and all works are to be undertaken in accordance with the
terms and conditions specified in these permits.
Vegetation clearance and management works are to be undertaken in accordance with the project-specific conditions of approval relating to
vegetation clearing.
Objective/Target

To ensure:
     areas of native flora and fauna habitat that are to be retained are appropriately protected during the construction phase;
     authorised flora and fauna habitat disturbance is carried out in accordance with best practice environmental management measures, as well
      as the terms and conditions of relevant permits authorising such disturbance; and
     existing infestations of pest flora or fauna species are controlled and no new pest species are introduced to or spread within the site.
Performance Indicators

Compliance with any project-specific conditions of approval relating to vegetation clearing.
Vegetation adjacent to the proposed development areas is retained and protected at all times during clearing of the site and ongoing works.
The clearance of native vegetation within disturbance areas subject to permits and approvals is undertaken in accordance with the terms and
conditions of those relevant permits.
No invasion/dispersal of weeds or other exotic species.




Noosa Civic                                                              Version 1                                                        November 2014
Appendix B - Construction EMP.docx                                                                                                             Page 16

Section 110

Noosa Civic
Construction Environmental Management Plan



Management Measures

 Tasks                                 Actions / Monitoring                                                                        Timing            Responsibility
 Retain and protect all vegetation     Clearly demarcate the development areas on construction plans and in the field.             Prior to the      Environmental
 adjacent to the disturbance areas.    Clearly identify trees which are to be removed from those to be retained within the         commencement      Management
 Retain and protect vegetation         vicinity of the development areas using brightly coloured marking tape at a height of       of         any    Officer
 within the project footprint as far   1.5m from ground level.                                                                     vegetation
 as practicable.                                                                                                                   clearance
                                       Ensure the Environmental Management Officer audits the marked project footprint
                                       prior to the commencement of clearance activities.
 Ensure no more than minimal           Visually monitor the condition of retained vegetation on a weekly basis for signs of        Throughout        Contractor
 disturbance occurs to the retained    stress or damage throughout the construction period.                                        construction
 trees, during site clearance          Ensure a suitably qualified arborist inspects any damaged trees, and provides any           period
 works.                                necessary advice or action to ensure that the trees are protected and maintained in a
                                       healthy state.
 Ensure any pruning/trimming of        Where removal of over storey trees is necessary for the manoeuvring of excavators           Ongoing           Contractor
 trees or their root system is         and other vehicles to/from and within the development areas, organise an arborist to
 undertaken only by a suitably-        inspect the trees in the vicinity of the development areas and undertake any required
 qualified arborist.                   pruning/trimming.
                                       Where removal of over-storey trees is necessary within the project footprint, cut trees
                                       down 250mm above ground level, if possible, in order to leave the root ball in the
                                       ground and the immediate area undisturbed.
 Conduct clearance of vegetation       Ensure any vegetation occupied by native fauna is not cleared until the fauna moves         During all site   Contractor
 in a manner which ensures that        out of the vegetation, or is relocated to a secure area of similar habitat by a qualified   clearance
 any native fauna living near or       fauna spotter-catcher.                                                                      works
 within or adjacent to the             Ensure vegetation clearance is conducted in a sequential manner in order to direct
 vegetation to be removed have         native fauna away from threatening processes or hostile environments (e.g. roads,
 time to move out of the areas of      cleared land) and towards any retained vegetation or habitat links.
 disturbance    without   human
 intervention.
 Ensure biosecurity issues are         Contractor shall prepare an Approved Risk Management Plan (ARMP) to avoid the               Prior to the      Contractor
 appropriately dealt with to avoid     spread of red imported fire ants at the site due to known historical infestations.          commencement
 the spread of pests.                  The plan will detail the measures to be adopted to prevent the spread of fire ants from     of earthworks
                                       the site and will include the following.
                                            Movement control requirements.
                                            Infested soil disposal requirements


Noosa Civic                                                                    Version 1                                                              November 2014
Appendix B - Construction EMP.docx                                                                                                                         Page 17

Section 111

Noosa Civic
Construction Environmental Management Plan



 Tasks                                 Actions / Monitoring                                                                      Timing    Responsibility
                                            Machinery clean down from the site to prevent the spread from the site
                                            Details of monitoring and inspection procedures to prevent the spread of
                                             fire ants.

 Minimise the introduction and         Ensure that all equipment, boots and vehicles used in weed-infested areas are             Ongoing   Contractor
 dispersal of weeds and other          washed down thoroughly before moving into weed-free areas of the site.
 exotic species.
 Use mulch (foliage and branches       Stockpile cleared and pruned vegetation on-site for later use in rehabilitation           Ongoing   Contractor
 of cleared native vegetation only)    initiatives.
 for stabilisation of bare ground      Do not mulch weeds and non-native vegetation where it has potential to mix with
 exposed      during   construction    native vegetation mulch.
 activities.
                                       Prior to clearing/mulching vegetation, initiate chemical spraying of all declared weeds
                                       to avoid application as part of the rehabilitation strategy.
 Undertake site preparation (i.e.      In areas where revegetation occurs amongst existing native trees, shrubs and              Ongoing   Contractor
 soil treatment) and revegetation in   groundcovers, implement the following procedure to minimise the potential damage to
 a manner which avoids the             native species.
 unnecessary removal or damage         1. Mark all native tree and shrub species (including emergent woody vegetation) in the
 to native species.                    revegetation area with flagging tape or conspicuous marker stakes.
                                       2. Carefully undertake brush-cutting around these plants in order to reduce the grass
                                       cover in preparation for soil improvement treatment.
                                       3. During soil treatment and site preparation works, avoid root disturbance to retained
                                       native woody vegetation by providing a set-back from the trunk of retained plants. The
                                       set-back will depend on the size of each specimen, but should be in the vicinity of
                                       0.5–2m.
 Record keeping.                       Ensure all records and reports are made available to relevant administering authorities   Ongoing   Contractor
                                       upon request.
 Corrective actions.                   Should there be non-compliance with the stated performance indicators the following       Ongoing   Contractor
                                       corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and



Noosa Civic                                                                   Version 1                                                     November 2014
Appendix B - Construction EMP.docx                                                                                                               Page 18

Section 112

Noosa Civic
Construction Environmental Management Plan



 Tasks                                Actions / Monitoring                                                                    Timing   Responsibility
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                      The Contractor shall implement the corrective action(s) as required within the agreed
                                      timeframe noted on the CAR.




Noosa Civic                                                                 Version 1                                                   November 2014
Appendix B - Construction EMP.docx                                                                                                           Page 19

Section 113

Noosa Civic
Construction Environmental Management Plan



4.5                Element 5: Storage and Handling of Hazardous Materials
Rationale

Works may require the use or handling of dangerous or hazardous materials such as fuels, oils and hydraulic fluids (e.g. during on-site refuelling
of machinery). While these are not expected to be stored on-site in large quantities, management of the site is required in order to avoid potential
adverse impacts to human health and the receiving environment as a result of inappropriate storage and handling of hazardous materials.
The spill response procedure to be followed for the project is described in Section 3.5.3 above.
Objective/Target

Compliance with the EP Act and AS1940-2004: The storage and handling of flammable and combustible liquids.
To effectively manage the safe storage and handling of hazardous materials within the construction site.
Performance Indicators

No adverse impacts to human health or the receiving environment associated with the storage or handling of hazardous materials on site.
Management Measures

 Tasks                                            Actions / Monitoring                                                                     Timing              Responsibility
 Maintain a register of all                       Display an appropriate MSDS with each dangerous/hazardous substance stored on-           Prior to and        Contractor
 dangerous       or     hazardous                 site, and as part of the register.                                                       during
 substances stored within the site                                                                                                         construction
 and all associated Material Safety
 Data Sheets (MSDS).
 Hazardous materials                 shall   be   Store hazardous materials in an adequately controlled containment area, with             Prior          to   Contractor
 appropriately stored.                            incompatible substances stored separately. Design containment areas to ensure:           commencement
                                                                                                                                           of construction.
                                                     entry of stormwater is prevented;
                                                     the containment of spillages is achieved in accordance with the nature of
                                                      stored materials, the MSDS, and manufacturers’ instructions; and
                                                     provision is made for disposal of any captured liquid in accordance with
                                                      the MSDS and manufacturers’ instructions.
                                                  Include inspection of storage areas in daily site monitoring/checklists to ensure that



Noosa Civic                                                                              Version 1                                                              November 2014
Appendix B - Construction EMP.docx                                                                                                                                   Page 20

Section 114

Noosa Civic
Construction Environmental Management Plan



 Tasks                                Actions / Monitoring                                                                        Timing              Responsibility
                                      spillage or seepage has not occurred and that the integrity of the containment area is
                                      not compromised.
                                      Formally audit storage area of dangerous/hazardous substances weekly and record
                                      appropriately.
 Ensure storage and handling of       Ensure site induction training includes appropriate information regarding the storage       During       site   Contractor
 dangerous         or     hazardous   and handling of hazardous substances, including instructions on emergency spill             inductions
 materials (e.g. refuelling) occurs   response procedures and the location of spill response kits.
 at the site camp or as far as
 practicable away from any woody      Storage of hazardous materials shall occur as far as practicable from local creeks and      Ongoing
 vegetation or waters to protect      other waters (including stormwater drains).
 the receiving environment in the     Refuelling shall only occur in pre-existing designated refuelling areas, located at least
 event of a spill.                    50m away from local creeks or drains, and preferably offsite.
                                      Ensure appropriate and sufficient spill cleanup materials are available at all times.
                                      Maintain a record of any accidental release or spillage of hazardous materials
                                      including details or corrective actions undertaken. Immediately report any such
                                      incident to the Principal.
                                      Notify the Principal and relevant administering authority in the event of an accidental
                                      release of hazardous materials from the site with the potential to cause environmental
                                      harm.
 Record keeping.                      Ensure all records and reports are made available to relevant administering authorities     Ongoing             Contractor
                                      upon request.
 Corrective actions.                  Should there be non-compliance with the stated performance indicators the following         Ongoing             Contractor
                                      corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                      The Contractor shall implement the corrective action(s) as required within the agreed
                                      timeframe noted on the CAR.




Noosa Civic                                                                   Version 1                                                                November 2014
Appendix B - Construction EMP.docx                                                                                                                          Page 21

Section 115

Noosa Civic
Construction Environmental Management Plan



4.6                Element 6: Public Amenity and Community
Rationale

The site is unlikely to be visible to nearby residents and passing motorists, given that existing natural vegetation between the site and adjoining
areas will be retained. However, construction works have the potential to adversely impact local public amenity in the vicinity of the site in the
short term, as a result of noise, dust emissions, visual impacts and potential changes to public access and travel arrangements.
The staging of construction works will allow for the continuity of surrounding land uses (i.e. shopping centre, and residential and industrial uses)
where appropriate. However the works may impact on the surrounding land users and the community, and vice versa. These impacts need to
be managed during the construction works in accordance with the identified management measures.
Objective/Target

To ensure persons potentially affected by the works are notified of the nature, duration and timing of the proposed works.
To minimise adverse impacts to public amenity as a result of noise, dust emissions, visual impacts and changes to public access and travel
arrangements, as far as practicable.
To minimise the disturbance of construction works on surrounding land users and vice versa.
Performance Indicators

Compliance with all relevant legislative frameworks such as the EP Act, EPP Noise, Council local laws, and relevant health and safety
requirements.
People potentially affected by the works are informed of the nature, duration and timing of the proposed works.
Any complaints are responded to within one working day.
Noise levels must comply with the noise objectives when measured at the nearest sensitive receptor shown in Table 4-2 below.




Noosa Civic                                                            Version 1                                                       November 2014
Appendix B - Construction EMP.docx                                                                                                          Page 22

Section 116

Noosa Civic
Construction Environmental Management Plan



Table 4-2          General nuisance noise level limits

     Sensitive              Time of Day       Acoustic quality objectives (measured at the          Environmental
     Receptor                                                   receptor)                               Value
                                              LAeq,adj,1hr      LA10,adj,1hr        LA1,adj,1hr
     Dwelling               Daytime and           50                55                 65             Health and
    (outdoors)                evening                                                                 wellbeing
     Dwelling               Daytime and           35                40                 45             Health and
     (indoors)                evening                                                                 wellbeing

Management Measures

 Tasks                                    Actions / Monitoring                                                                           Timing           Responsibility
 Advise residents, land owners            Erect signage at the site in a place viewable by local residents, land owners and patrons      Two weeks        Contractor
 and patrons of the current               displaying generic details of the works program with the proposed timeframe, or provide        prior       to
 facilities who may potentially be        this information in the form of a mail out/letter box drop to potentially affected residents   commencem
 affected by construction activities      and landowners.                                                                                ent         of
 of the works program.                    Ensure communications provide a point of contact for complaints, including a contact           construction,
 Notify community members of              telephone number which is manned during working hours, and a 24-hour emergency                 and ongoing
 construction site working hours,         contact number.                                                                                thereafter
 and clearly state these on               Ensure that the impacts in the interaction between construction works and the ongoing
 signage at the site.                     use of surrounding land uses is minimised as far as practicable by:
                                               engaging in ongoing weekly communications with surrounding land users so as to
                                                communicate constructions plans for the week and potential disruption to
                                                surrounding land users; and
                                               implementing the necessary management measures and controls to minimise any
                                                impacts (i.e. erecting signage, fencing, protection nets, etc).

 Minimise activities resulting in the     Operate and maintain all vehicles and equipment in accordance with the manufacturer’s          Ongoing          Contractor
 introduction of excessive dust and       specifications.
 fumes to the local atmosphere as         Do not undertake burning of waste materials at the site.
 far as practicable.
                                          Ensure all loads entering and exiting the site are securely covered to avoid dust
                                          generation.
                                          Cease any dust-generating activities during windy conditions.
                                          Deploy water trucks when dust is visible beyond site boundaries for longer than 15
                                          minutes.


Noosa Civic                                                                       Version 1                                                                November 2014
Appendix B - Construction EMP.docx                                                                                                                              Page 23

Section 117

Noosa Civic
Construction Environmental Management Plan



 Tasks                                  Actions / Monitoring                                                                           Timing           Responsibility
                                        Dust suppression measures shall be used onsite to provide dust suppression for the
                                        construction area when dust is visible and clearly leaving the worksite boundary.
                                        Onsite speed limits shall be strictly enforced.
                                        Inspect all vehicles entering and leaving the site, and remove excessive soil build up as
                                        required.
                                        Stabilisation of exposed soil areas and slopes shall be undertaken as soon as
                                        practicable following disturbance.
                                        Visual inspection of former bare earth areas shall be undertaken after stabilisation
                                        and/or revegetation to ensure measures are effective.
 Noise emissions criteria shall be      Noise emissions originating from construction activities must comply with the project DA       Ongoing          Environmental
 in accordance with the EPP Noise       noise conditions, and if not specified with the EPP Noise criteria in Table 4-2 at the                          Management
 guidelines.                            nearest noise sensitive receptor.                                                                               Officer/
                                                                                                                                                        Contractor
 Working hours at the site shall be     Unless otherwise approved in writing by a relevant administering authority or in               Ongoing          Environmental
 limited to those stated in the         response to an environmental incident or other emergency, ensure construction hours                             Management
 Contract. Wherever practicable,        are confined to within 6.30am and 6.00pm, Monday to Saturday, with no work on                                   Officer/
 noise-generating activities shall      Sundays or Public Holidays.                                                                                     Contractor
 be minimised.
 All noise and/vibration generating     In the event of the adjusted noise level for a single noise source or activity significantly   Ongoing          Environmental
 mobile and stationary plant,           exceeding the background noise level, consideration shall be given to restricting the                           Management
 equipment, and processes shall         times during which the activity can take place to a number of separate hours each day.                          Officer/
 be controlled to minimise noise        Control all noise-generating mobile and stationary plant, equipment, and processes to                           Contractor
 emission in accordance with AS         minimise noise emission in accordance with AS 2436: Guide to Noise Control on
 2436:2010 Guide to Noise               Construction, Maintenance and Demolition Sites.
 Control      on       Construction,
 Maintenance and Demolition             Ensure all equipment and vehicles are in good working order, so as to minimise
 Sites.                                 unnecessary noise.

 Provide    adequate       signage,     Develop a Safety Signage Plan for the site works prior to the commencement of works.           Prior       to   Contractor
 barricades and information to          Ensure the plan provides proper warning to persons or motorists approaching the                commencem
 maintain     a     safe      traffic   construction site.                                                                             ent         of
 environment for staff, pedestrians     Ensure the Safety Signage Plan is implemented throughout the duration of the site              construction,
 and motorists.                         works.                                                                                         and ongoing

 Ensure material delivery and           Ensure materials are delivered during standard working hours only.                             Ongoing          Contractor
 unloading activities do not            Ensure trucks and vehicles are loaded and unloaded on-site only.
 adversely impact local access



Noosa Civic                                                                     Version 1                                                                November 2014
Appendix B - Construction EMP.docx                                                                                                                            Page 24

Section 118

Noosa Civic
Construction Environmental Management Plan



 Tasks                                  Actions / Monitoring                                                                      Timing          Responsibility
 arrangements.
 Maintain construction site in an       Manage construction activities and materials to ensure the site is maintained in a neat   Ongoing         Contractor
 orderly and neat fashion.              and tidy manner.
                                        Store and respread topsoil as soon as practicable to minimise visual disturbance
                                        associated with excavation activities.
 Minimise visual impact of site         Ensure stockpiles, storage areas and site parking are restricted to designated areas      Ongoing         Contractor
 compounds.                             only.
 Clean-up site as soon as               Remove all vehicles, construction equipment, materials and refuse from the site as soon   On              Contractor
 practicable following completion       as practicable on completion of works.                                                    completion of
 of works.                                                                                                                        works
 Provide    appropriate     fencing,    The construction worksite at each construction stage shall be securely fenced off with    Ongoing as      Contractor
 signage    and      other    control   appropriate signage to prevent unauthorised entry to worksite.                            necessary
 measures          to        prevent
 unauthorised     entry    to    the
 construction sites.
 Record keeping.                        Maintain records of any monitoring results including details of corrective actions and    Ongoing         Contractor
                                        repairs/maintenance undertaken.
                                        Maintain records of any enquiries/complaints received in relation to construction works
                                        including complainant details, nature of complaint and corrective actions undertaken.
                                        Ensure all records and reports are made available to relevant administering authorities
                                        upon request.
 Corrective actions                     Should there be non-compliance with the stated performance indicators the following       Ongoing         Contractor
                                        corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                        The Contractor shall implement the corrective action(s) as required within the agreed
                                        timeframe noted on the CAR.



Noosa Civic                                                                   Version 1                                                            November 2014
Appendix B - Construction EMP.docx                                                                                                                      Page 25

Section 119

Noosa Civic
Construction Environmental Management Plan




4.7                Element 7: Waste Management
Rationale

Waste management at the site is required to determine appropriate methods to avoid, reuse, recycle and dispose of construction-related waste,
in order to minimise the unnecessary depletion of natural resources and creation of waste requiring disposal.
Objective/Target

To ensure all waste material associated with the works is appropriately managed.
Performance Indicators

No waste of any type is inappropriately disposed of onsite.
Management Measures

 Tasks                                Actions / Monitoring                                                                      Timing    Responsibility
 Ensure all construction and          Audit the site for inappropriate disposal of domestic waste.                              Daily     Environmental
 domestic waste (paper, plastic,                                                                                                          Management
 etc) is removed and appropriately                                                                                                        Officer
 disposed of offsite.
 Re-use excavated materials for       Audit the waste schedule, disposal records and storage areas for excavated materials.     Weekly    Environmental
 onsite filling where appropriate.                                                                                                        Management
                                                                                                                                          Officer
 Appropriately manage, handle,        Any handling or potential disturbance to asbestos products must only be conducted by
 remove and dispose of asbestos       an appropriately licensed asbestos removal contractor. All asbestos waste must be
 containing products.                 appropriately removed, sealed and transported offsite in accordance with relevant
                                      guidelines and codes of practice.
 Record keeping.                      Ensure all records and reports are made available to relevant administering authorities   Ongoing   Contractor
                                      upon request.
 Corrective actions.                  Should there be non-compliance with the stated performance indicators the following       Ongoing   Contractor
                                      corrective actions are to be implemented:
                                            identification of the cause of the non-compliance;
                                            implementation of appropriate mitigation measures as determined by the


Noosa Civic                                                                   Version 1                                                    November 2014
Appendix B - Construction EMP.docx                                                                                                              Page 26

Section 120

Noosa Civic
Construction Environmental Management Plan



 Tasks                                Actions / Monitoring                                                                    Timing   Responsibility
                                             Principal in consultation with the Contractor and relevant experts (where
                                             required); and
                                            relevant validation monitoring to confirm that the nominated corrective
                                             actions have been effective.
                                      The Contractor shall implement the corrective action(s) as required within the agreed
                                      timeframe noted on the CAR.




Noosa Civic                                                                 Version 1                                                   November 2014
Appendix B - Construction EMP.docx                                                                                                           Page 27

Section 121

Noosa Civic
Construction Environmental Management Plan



4.8                Element 8: Traffic Control Management
Rationale

It is not expected that the construction works will have significant potential to impact local traffic and road safety conditions. However, there will
be requirements from time to time to ensure that adequate traffic management is provided.
Objective/Target

To manage traffic control associated with construction activities to minimise the impact to local traffic, parking and road safety conditions.
Performance Indicators

Compliance with the Traffic Management Plan.
No accidents or road safety incidents due to traffic associated with construction works.
Residents and road users are informed of the nature and duration of the works.
Management Measures

 Tasks                                Actions / Monitoring                                                                    Timing             Responsibility
 Contractor to develop an             It is the responsibility of the Contractor to develop a Traffic Management Plan (TMP)   Prior         to   Contractor
 appropriate Traffic Management       for the project. The TMP must be approved by Noosa Shire Council.                       commencement
 Plan for the project.                Traffic management around construction sites must be conducted in accordance with       of construction
                                      the pre-approved TMP.                                                                   works
                                      The works shall proceed without any interruption to local traffic.
 Manage     construction    traffic   Ensure that traffic involved with the construction works of the development does not    Prior to and       Contractor
 appropriately    to     minimise     adversely impact on local traffic conditions and adjacent operations.                   during
 impacts to local traffic and the     Compliance with the TMP with regard to construction traffic safety.                     construction
 community.                                                                                                                   works
                                      Provide proper warning to persons or motorists approaching the construction site.
                                      Ensure the safety traffic signage is implemented throughout the duration of the site
                                      works.
                                      Provide adequate signage, barricades and information to ensure that traffic
                                      arrangements can be understood.
                                      Ensure materials are delivered during standard working hours only, and preferably
                                      outside traffic peak hours.
                                      Provide appropriate parking areas for staff as to not impact on on-street parking of


Noosa Civic                                                                   Version 1                                                            November 2014
Appendix B - Construction EMP.docx                                                                                                                      Page 28

Section 122

Noosa Civic
Construction Environmental Management Plan



 Tasks                               Actions / Monitoring                                                                    Timing    Responsibility
                                     local residents in the area.
                                     Ensure trucks and vehicles are loaded and unloaded on-site only.
 Worksite haulage routes.            Site access shall be in compliance with relevant conditions of approval.                Ongoing   Contractor
                                     Appropriate safety and warning measures to be implemented to ensure that
                                     construction works only cause minor disturbances to surrounding land users.
 Record keeping.                     Ensure all records and reports are made available to relevant administering             Ongoing   Contractor
                                     authorities upon request.
 Corrective actions.                 Should there be non-compliance with the stated performance indicators the following     Ongoing   Contractor
                                     corrective actions are to be implemented:
                                        identification of the cause of the non-compliance;
                                        implementation of appropriate mitigation measures as determined by the
                                         Principal in consultation with the Contractor and relevant experts (where
                                         required); and
                                        relevant validation monitoring to confirm that the nominated corrective
                                         actions have been effective.
                                     The Contractor shall implement the corrective action(s) as required within the agreed
                                     timeframe noted on the CAR.




Noosa Civic                                                                  Version 1                                                   November 2014
Appendix B - Construction EMP.docx                                                                                                            Page 29

Section 123

Noosa Civic
Engineering Report




Noosa Civic




APPENDIX



C
Erosion and Sediment Control Plan




QIC Noosa Civic Pty Ltd         Version 1   November 2014
engineering report_final.docx                      Page i

Section 124

 Insert Civic
Noosa   report title here
 Insert project
Erosion         name
         Sediment  Control Plan
  Insert job reference
J13041




  Prepared for
  QIC Noosa Civic Pty Ltd


  November 2014

Section 125

Noosa Civic
Erosion Sediment Control Plan




Contact Information                      Document Information
Cardno (QLD) Pty Ltd                     Prepared for     QIC Noosa Civic Pty Ltd
ABN 57 051 074 992                       Project Name     Noosa Civic
                                         File Reference   O:\J13041\WP\engineering
Level 11 Green Square North Tower                         report\Appendix C -
                                                          ESCP.docx
515 St Paul’s Terrace
                                         Job Reference    J13041
Fortitude Valley QLD 4006
                                         Date             November 2014
Locked Bag 4006 Fortitude Valley


Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 7 3369 9822


[email protected] Noosa Civic Pty Ltd             Version 1                             November 2014
Appendix C - ESCP.docx                                                           Page ii

Section 126

Noosa Civic
Erosion Sediment Control Plan




Table of Contents
1        Concept Earthworks                                                                        1
         1.1             Site Earthworks                                                           1
         1.2             External Catchment                                                        1
         1.3             Site Physical Characteristics Constraints and Opportunities               1
2        Erosion and Sediment Control                                                              2
         2.1             Erosion Hazard Assessment                                                 2
         2.2             Site Slope                                                                3
                         2.2.1     Duration of Disturbance                                         4
         2.3             Rehabilitation Method                                                     4
         2.4             Special Considerations                                                    4
3        Erosion and Sediment Management                                                           5
         3.1             Methodology                                                               5
         3.2             Soil and Stockpile Management                                             5
         3.3             ESC Installation sequence                                                 5
         3.4             Site Monitoring                                                           6
         3.5             Water Quality Criteria                                                    6



Tables
Table 2-1         Soil Loss Class                                                                  3
Table 3-1         Site Discharge Water Quality Criteria                                            6




QIC Noosa Civic Pty Ltd                                      Version 1                 November 2014
Appendix C - ESCP.docx                                                                       Page iii

Section 127

Noosa Civic
Erosion Sediment Control Plan




1                 Concept Earthworks
1.1               Site Earthworks
With the proposed expansion of the Noosa Civic centre it is necessary to re-profile the expansion area into
the desired shape for the construction of the required carpark and building platforms. The intent is to work
with the existing land form as much as is possible. It is necessary to excavate the area for the carpark under
the proposed new buildings and to shape the balance of the site to suit the needs of the carpark and access
connections.

1.2               External Catchment
A minor external catchment enters the proposed construction site from the east and runs overland across the
site to the existing natural gully on the immediate western boundary of the proposed site. It is proposed to
form an open channel during the initial earthworks phase to convey this external catchment around the
construction, to the north and south. As the final stormwater drainage solution is realised and becomes
operational this will ultimately convey the clean water from the external catchment and the open drainage
channel will be removed.

1.3               Site Physical Characteristics Constraints and Opportunities
The site constraints lay primarily with the proximity to the existing commercial development to the north-west
and the covenant area immediately adjacent the site on the west. Sufficient erosion and sediment controls,
along with appropriate drainage management, will mitigate any potential impact as far as practicable.
Communication with the neighbouring community will be undertaken and contact information provided in the
event of issues arising from the works.




QIC Noosa Civic Pty Ltd                            Version 1                                     November 2014
Appendix C - ESCP.docx                                                                                 Page 1

Section 128

Noosa Civic
Erosion Sediment Control Plan




2                 Erosion and Sediment Control
2.1               Erosion Hazard Assessment
The following hazard factors have been considered in preparing the Soil Erosion and Sediment Control
Plans. Whilst it is considered a very low risk, from an erosion hazard perspective, the location and the area
of disturbed ground are significant enough to warrant appropriate drainage, erosion and sediment controls to
mitigate the potential impact that the earthworks on the site may cause.
An analysis of the potential soil loss from the development site is contained within the Sediment Basin Sizing
calculations; refer below, along with a preliminary sizing of a sediment basin to cater for the entire
construction site.

                 Site area                       Sub-catchments                       Remarks
                                          S1
 Total catchment area (ha)               7.749
 Disturbed catchment area (ha)           7.749


 Soil analysis (enter sediment type if known, or laboratory particle size data)
 Sediment Type (C, F or D) if known:      D


 % sand (fraction 0.02 to 2.00 mm)
 % silt (fraction 0.002 to 0.02 mm)
 % clay (fraction finer than 0.002 mm)
 Dispersion percentage
 % of whole soil dispersible
 Soil Texture Group                       D


 Rainfall data
 Design rainfall depth (days)              5
 Design rainfall depth (percentile)       80
 x-day, y-percentile rainfall event      46.3
 Rainfall R-factor (if known)
 IFD: 2-year, 6-hour storm (if known)    15.8


 RUSLE Factors
 Rainfall erosivity (R-factor)           5660
 Soil erodibility (K-factor)             0.05
 Slope length (m)                         80
 Slope gradient (%)                        2
 Length/gradient (LS-factor)             0.41
 Erosion control practice (P-factor)      1.3
 Ground cover (C-factor)                   1




QIC Noosa Civic Pty Ltd                              Version 1                                   November 2014
Appendix C - ESCP.docx                                                                                 Page 2

Section 129

Noosa Civic
Erosion Sediment Control Plan




 Calculations
 Soil loss (t/ha/yr)                                  150                                                     RUSLE equation
 Soil Loss Class                                      1                                                 See Ch 4 Table 4.2 pge 54
 Soil loss (m3/ha/yr)                                 115
 Sediment basin storage volume, m3                    152                                              See Chapter 6 (2 months soil
                                                                                                                 loss)
           x             2 months soil loss calculated by RUSLE




 .                                                                                 Average Depth of basin =     1.8        metres

  Site         Cv         Rx-         Total      Settling   Sediment     Total                      Basin shape
                         day, y-   catchment      zone       storage     basin
                          %ile        area       volume      volume     volume
                                      (ha)        (m3)         (m3)       (m3)              L:W                 Length      Width
                                                                                            Ratio                (m)         (m)



     S1     0.30         46.3        7.749        1076        152        1228                 3                   45.2         15.1


The Soil Loss class for the site is Very Low (150 t/ha/yr). refer Table 2-1 below.
Table 2-1           Soil Loss Class

     Soil Loss Class                Calculated Soil Loss        Erosion Hazard
                                          (t/ha/yr)
               1                          0 to 150                    Very Low
               2                         151 to 225                     Low
               3                         226 to 350                 Low-Moderate
               4                         351 to 500                   Moderate
               5                         501 to 750                     High
               6                        751 to 1,500                 Very High
               7                             >1,500              Extremely High


The above table is taken directly from Table 3.1 Soil Loss Classes, Chapter 3 of the IECA Best Practice
Erosion and Sediment Control 2008.

2.2                 Site Slope
The topography of the site is very gently falling to the north and south west. With the formation of the area
into the proposed commercial development, temporary overland flow paths will be established to direct dirty
water flows to the established sediment basin/s. Grades within the works area will generally be 1.0 to 3.0%.
All slopes are to be maintained to lengths well less than 40m to minimise velocity generation by stormwater
runoff and the potential to pick up and move soil across the site.




QIC Noosa Civic Pty Ltd                                         Version 1                                             November 2014
Appendix C - ESCP.docx                                                                                                      Page 3

Section 130

Noosa Civic
Erosion Sediment Control Plan



2.2.1             Duration of Disturbance
It is proposed that the earthworks program is to take approximately 8 to 10 weeks.
Upon completion of the bulk earthworks filling, the site will be stabilised as directed herein or as part of the
approved detailed design plans and inspected by the Superintendent.
It is intended to fill the site by a cellular means, to minimise the potential for exposed soils to produce
sediment laden runoff. It is proposed to construct the outer limit of the earthworks fill platform first and to
stabilise this outer bank immediately upon completion. This newly formed bund will contain all contaminated
runoff within the site works area itself, which will then be directed to the proposed sediment basin/s for
treatment prior to discharging.

2.3               Rehabilitation Method
The finished surface of the site will be rehabilitated according to its location and intended final use. All
substantial batters are to be prepped, mulched and vegetated. All future building pad areas are to be
seeded once the surface is prepped and topsoiled.
Prior to the placement of any topsoil, the surface is to be scarified/roughened along the contour.
Topsoil is only to be moved when it is in a damp condition to ensure that the soil aggregate condition is
maintained. Topsoil is to be ripped/scarified along the contour prior to stabilisation, if smooth and
compacted.

2.4               Special Considerations
Access for construction and fill movements will only be permitted via Walter Hay Drive at the nominated
location.
A specific site issue to be considered is the proximity to the adjacent covenant area. Fences are to be
erected at the extent of the proposed earthworks areas and clearly marked as “No Go Zones” beyond.




QIC Noosa Civic Pty Ltd                             Version 1                                        November 2014
Appendix C - ESCP.docx                                                                                     Page 4

Section 131

Noosa Civic
Erosion Sediment Control Plan




3                 Erosion and Sediment Management
3.1               Methodology
The Contractor’s proposed erosion and sediment control methodology is to be implemented in four distinct
phases in accordance with construction activities being undertaken.
          Phase 1 – Prior to Construction commencement
          Phase 2 – Bulk Earthworks
          Phase 3 – Civil Construction
          Phase 4 – Post Construction
Sediment basin/s is/are to be established, as require, prior to works commencing in the basin’s catchment
area.
The site is to be filled in a cellular fashion, in that the external fill batters are to be filled and stabilised first
prior to the infilling of the fill areas. The entire earthworks area will be managed by the Contractor in a logical
and reasonable sequence.

3.2               Soil and Stockpile Management
All reasonable and practicable measures must be taken to obtain the maximum benefit from existing topsoil.
Viable topsoil is to be stockpiled in long low flat mounds to facilitate the survival of seed and micro-
organisms vital for the topsoil.
Stockpiles of erodible material that has the potential to cause environmental harm, if displaced, must be:
          Appropriately protected from wind, rain, concentrated surface flow and excessive up-slope
           stormwater surface flows.
          Located at least 2m from any hazardous area, retained vegetation, or concentrated drainage line.
          Located up-slope of an appropriate sediment control system.
          Provided with an appropriate protective cover (synthetic, mulch or vegetative) if the materials are
           likely to be stockpiled for more than 28 days.
A suitable flow diversion system must be established immediately up-slope of a stockpile of erodible material
that has the potential to cause environmental harm if displaced, if the up-slope catchment area draining to
the stockpile exceeds 1500m 2.

3.3               ESC Installation sequence
Prior to land disturbance

 Item                                                        Removed
 Mark out initial limits of disturbance / mark out No Go
 Zones
 Entry / Exit installed                                      Upon site completion
 Install sediment weir                                       After construction of Sediment Basin
 Clear sediment basin and stockpile areas
 Install sediment fence to stockpile areas                   After stockpile removal
 Install Sediment Basin and stabilised outlet                Upon site completion
 Install clear water diversion and repair as required




QIC Noosa Civic Pty Ltd                                 Version 1                                       November 2014
Appendix C - ESCP.docx                                                                                        Page 5

Section 132

Noosa Civic
Erosion Sediment Control Plan



During Earthworks operations

 Item                                                         Removed
 Install cut off drains and diversion banks for dirty water   Upon site establishment completion, cover 80%
 collection
 Clear staged works area
 Strip topsoil to stockpile and provide flow controls and
 downstream filter fence
 Carry out earthworks, profile and topsoil
 Mulch / seed / turf completed staged earthworks
 embankment areas immediately upon completion
 Stabilise allotments / earthworks area with appropriate
 measures
  Install silt fences / contour banks to manage sheet flow    Upon site establishment completion, cover 80%
 lengths



3.4               Site Monitoring
All water quality data, including dates of rainfall, dates of testing, testing results and dates of water release,
must be kept in an on-site register. The register is to be maintained up to date for the duration of the
approved works and be available on-site for inspection by request.
All environmentally relevant incidents must be recorded in a field log that must remain accessible to all
relevant regulatory authorities.

3.5               Water Quality Criteria
Water quality criteria for discharge from the site are detailed within the relevant Environmental Management
Plan.
Table 3-1         Site Discharge Water Quality Criteria

                                TSS                  NTU                     pH
 Requirement                <50mg/L               < 100NTU                6.5 to 8.5




QIC Noosa Civic Pty Ltd                                 Version 1                                       November 2014
Appendix C - ESCP.docx                                                                                        Page 6

Section 133

Noosa Civic
Engineering Report




Noosa Civic




APPENDIX



D
Stormwater Management Plan




QIC Noosa Civic Pty Ltd         Version 1   November 2014
engineering report_final.docx                      Page i

Section 134

 Insert Civic
Noosa   report title here
  Insert project
Stormwater       name
              Management Plan
  Insert job reference
J13041




  Prepared for
  QIC Noosa Civic Pty Ltd


  November 2014

Section 135

Noosa Civic
Stormwater Management Plan




Contact Information                      Document Information
Cardno (QLD) Pty Ltd                     Prepared for     QIC Noosa Civic Pty Ltd
ABN 57 051 074 992                       Project Name     Noosa Civic
                                         File Reference   O:\J13041\WP\engineering
Level 11 Green Square North Tower
                                                          report\Appendix D - SMP.docx
515 St Paul’s Terrace
Fortitude Valley QLD 4006                Job Reference    J13041
Locked Bag 4006 Fortitude Valley         Date             November 2014

Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 7 3369 9822

[email protected] Noosa Civic Pty Ltd             Version 1                               November 2014
Appendix D - SMP.docx                                                              Page ii

Section 136

Noosa Civic
Stormwater Management Plan




Table of Contents
1        Introduction                                                                          1
2        Stormwater Quantity Management                                                        2
         2.1            Regional Flood Mapping                                                 2
         2.2            Local Catchment Modelling                                              2
3        Stormwater Quality Modelling                                                          5
         3.1            Environmental Values and Water Quality Objectives                      5
         3.2            Pollutant Impact Assessment                                            5
                        3.2.1     Full Site Treatment                                          6
                        3.2.2     Water Re-use and Treatment                                   7
4        Conclusion                                                                          11


Tables
Table 2-1         Existing Catchment Properties                                                2
Table 2-2         Developed Catchment Properties                                               3
Table 2-3         Detention Basin Stage-Storage Details                                        4
Table 2-4         Total Site Discharge                                                         4
Table 3-1         Operational Phase Performance Criteria                                       5
Table 3-2         MUSIC Model Meteorological Data and Rainfall-Runoff Parameters               6
Table 3-3         Full Site Treatment Basin MUSIC Catchment Parameters                         6
Table 3-4         Full Site Treatment Basin Details                                            7
Table 3-5         Full Site Treatment Basin MUSIC Model Results                                7
Table 3-6         Total Water Demands                                                          8
Table 3-7         Water Re-use and Treatment MUSIC Catchment Parameters                        9
Table 3-8         Water Re-use and Treatment Basins Details                                    9
Table 3-9         Water Re-use and Treatment Rainwater Tank Details                            9
Table 3-10        Rainwater Tank Effectiveness                                                 9
Table 3-11        Multiple Bio-Retention Basins MUSIC Model Results                           10



Figures
Figure 1          Site Location
Figure 2          Existing WBNM Model
Figure 3          Developed WBNM Model
Figure 4          MUSIC Model Layout
Figure 5          Concept Stormwater Quantity Management
Figure 6          Concept Stormwater Quality Management



Appendices
Appendix A              Regional Flood Mapping
Appendix B              Rational Method Calculation




QIC Noosa Civic Pty Ltd                                 Version 1                  November 2014
Appendix D - SMP.docx                                                                    Page iii

Section 137

Noosa Civic
Stormwater Management Plan




1                 Introduction
Cardno (QLD) Pty Ltd has been commissioned to prepare a Stormwater Management Plan which considers
both stormwater quantity and quality for the proposed extension of the Noosa Civic development located on
28 Eenie Creek Road, Noosaville, as shown on Figure 1. The current proposal for the site is for a retail
centre, as shown on the Buchan Group drawings prepared for the project. Currently the proposed
development site is undeveloped bushland.
This report provides details of the management of stormwater following the proposed development of the
site.
The report is based on the following information provided by others:
    Aerial Laser Survey (ALS) (supplied by Department of Natural Resources & Mines, Qld)
    Ground survey (completed by Bennett and Francis Pty Ltd)
    Development layouts (completed by The Buchan Group)
    Engineering plans (completed by Cardno)
The accuracy of the report is dependent upon the accuracy of this information.




QIC Noosa Civic Pty Ltd                            Version 1                                November 2014
Appendix D - SMP.docx                                                                             Page 1

Section 138

Noosa Civic
Stormwater Management Plan




2                 Stormwater Quantity Management
2.1               Regional Flood Mapping
Appendix A contains copies of Noosa Shire Council’s River Flood Information Map and Stormtide
Information Map. This mapping indicates that the site is effectively flood free from both River and Stormtide
flooding.
There is a small inundation extent on the site mapped for River flood for extreme events, but this does not
affect any land beyond the area identified as OS7. Therefore management of the stormwater and flooding
for this site will be based on local catchment management only.

2.2               Local Catchment Modelling
Unattenuated development would produce an increase in stormwater discharge from the site. Hydrologic
modelling was therefore undertaken to determine the detention volume required to mitigate this increase.
The hydrologic analysis was undertaken using the WBNM model in accordance with the requirements of the
Noosa Shire Council Planning Scheme (NSC, 2013), the Queensland Urban Drainage Manual (DEWS,
2013) and Australian Rainfall and Runoff (IEAust, 1998).
Two scenarios were considered for the assessment:
      Existing Scenario
       In the existing scenario the site drains to the west and south-west, primarily through the existing minor
       drainage corridor contained within OS7. Flows from the existing developed area of Noosa Civic to the
       west also contribute to the overall runoff in OS7. Flow is discharged from the site at three different
       points along the southern boundary. The existing site and catchments are shown on Figure 2.
      Developed Scenario
       For this scenario, the existing model was modified to include the proposed development based on the
       layout given in the reference drawings. The catchment boundaries for this scenario are shown on
       Figure 3.
Table 2-1 and Table 2-2 list the parameters adopted for the existing and developed scenarios respectively.
Table 2-1         Existing Catchment Properties

        CATCHMENT ID              Catchment area (ha)        Percentage Impervious
                                                                      (%)
                   A                     9.09                        15.28
                   B                     3.61                        5.61
                  C                      2.57                        26.30
                  D                      4.47                        85.00
                   E                     1.53                        5.00
                Total                    21.27                       28.89




QIC Noosa Civic Pty Ltd                              Version 1                                     November 2014
Appendix D - SMP.docx                                                                                    Page 2

Section 139

Noosa Civic
Stormwater Management Plan



Table 2-2         Developed Catchment Properties

        CATCHMENT ID             Catchment area (ha)        Percentage Impervious
                                                                     (%)
                  D                     4.47                        85.00
                   E                    1.53                        5.00
                  F1                    1.92                        33.66
                  F2                    0.95                        59.57
                  F3                    2.78                        67.60
                  G1                    2.11                        25.27
                  G2                    1.82                        76.55
                  G3                    0.80                        82.17
                  G4                    1.68                        75.21
                  H                     3.21                        28.45
                Total                   21.27                       55.14



To ensure that the peak flow calculated by the model was reasonable, the existing case model was validated
against a Rational Method calculation. The calculations completed in relation to the Rational Method are
presented in Appendix B. The Rational Method was found to predict peak flows of 3.9 m3/s in Catchment A
and 1.7 m3/s in Catchment B for the 100 year event. In comparison, the WBNM model provided peak flow
estimates of 4.2 m3/s in Catchment A and 1.8 m3/s in Catchment B for the existing case. Given this close
level of agreement, it was considered acceptable to use the WBNM model to calculate peak flows for the
existing and developed cases and to determine the size of detention basins required to offset the increase in
peak runoff.
It is proposed that on-site mitigation of local flows will be provided by a standard detention basin at the
south-western corner of the site in addition to utilising flood storage within the car parks. The location and
conceptual footprint of the proposed basins is shown in Figure 5. For the purposes of the development
application assessment, the levels were based on the preliminary engineering levels.
With reference to Section 3, it is intended to install bioretention systems within the basin and the car parks.
In accordance with best practice, it was assumed that the extended detention zone of the bioretention
systems was full at the commencement of each rainfall event.
Table 2-3 lists the stage-storage relationship ultimately adopted for the detention basin. For the analysis, the
size of the basin and the outlet grate size and weir were varied until an acceptable result was obtained for
the developed case. Ultimately, the outlet consisted of a 450mm diameter low flow pipe located immediately
above the extended detention zone of the basin and an overflow weir length of 35 metres located 1.6m
above the invert of the outlet.




QIC Noosa Civic Pty Ltd                             Version 1                                     November 2014
Appendix D - SMP.docx                                                                                   Page 3

Section 140

Noosa Civic
Stormwater Management Plan



Table 2-3         Detention Basin Stage-Storage Details

        Stage/ Depth                Storage Volume
            (m)                          (m3)
               0.0                        0.0
               0.1                        1.8
               0.2                        7.9
               0.3                        16.2
               0.4                        26.7
               0.5                        39.8
               0.6                        55.9
               0.7                        75.1
               0.8                        97.8
               0.9                      124.2
               1.0                      154.7
               1.1                      189.5
               1.2                      229.0
               1.3                      273.3
               1.4                      322.9
               1.5                      377.9
               1.6                      438.7
               1.7                      505.6


Table 2-4 presents the resulting pre- and post-developed flows for the range of Average Recurrence Interval
(ARI) flood events.
Table 2-4         Total Site Discharge

       ARI              Pre-development             Post-              Post-     Mitigated         Mitigated
     (Years)               Discharge             development       development   Discharge          Impact
                             (m3/s)               Discharge           Impact       (m3/s)            (m3/s)
                                                    (m3/s)             (m3/s)
         2                    4.1                    4.3               0.2          3.8               -0.3

         5                    5.5                    5.7               0.2          5.2               -0.3

        10                    6.4                    6.5               0.1          6.2               -0.2

        20                    7.6                    7.7               0.1          7.5               -0.1

        50                    8.7                    8.7               0.0          8.6               -0.1

       100                    9.9                    9.9               0.0          9.9               0.0


The proposed basin in conjunction with storage in the car parks will provide sufficient mitigation of runoff to
ensure that there is no increase in peak flow rate discharged from the site.




QIC Noosa Civic Pty Ltd                                    Version 1                             November 2014
Appendix D - SMP.docx                                                                                  Page 4

Section 141

Noosa Civic
Stormwater Management Plan




3                 Stormwater Quality Modelling
3.1               Environmental Values and Water Quality Objectives
In order to satisfy the requirements of the State Planning Policy (DSDIP, 2014) and Noosa Shire Council, it
will be necessary to treat runoff from the site to ensure that the Environmental Values of downstream
receiving waters are protected. To achieve this, it will be necessary to treat water to meet the water quality
objectives defined in the State Planning Policy.
The relevant load based water quality objectives applicable to the site are listed in Table 3-1.
Table 3-1         Operational Phase Performance Criteria

               Pollutant            Load Based Reduction Target
      Total Suspended Solids               80% reduction
          Total Phosphorus                 60% reduction
            Total Nitrogen                 45% reduction
    Litter (sized 5mm or greater)          90% reduction


The following section details the modelling undertaken to confirm that an appropriate level of treatment can
be achieved.
For the analysis, two solutions were considered.
          Full site treatment
           For this option, it was assumed that runoff from the entire site would be treated in bio-retention
           basins located on site. As the locations of these basins within the car park are currently undefined,
           the entire system was modelled as one treatment area in the analysis.
          Water re-use and treatment
           For this option, a 300kL water tank was added that collected water from the roofed areas of the site
           for use limited to suitable non-potable water purposes. Runoff from the remainder of the site and
           any overflow from the water tank were then treated by the bio-retention system as in the full site
           treatment option.
It is intended that a decision will be made at the detailed design stage in relation to the preference of
collecting runoff for reuse purposes in a rain water tank and the appropriate locations for bio-retention
basins.

3.2               Pollutant Impact Assessment
A detailed pollutant export analysis was carried out using eWater’s Model for Urban Stormwater
Improvement Conceptualisation (MUSIC) v6.01. The analysis was carried out in accordance with the latest
guidelines and data as defined in:
          ‘Water Sensitive Urban Design Technical Design Guidelines for South East Queensland’ (Healthy
           Waterways, 2006); and
          ‘MUSIC Modelling Guidelines Version 1.0’ (Water By Design, 2010).
In accordance with the above guidelines, the meteorological data and rainfall-runoff parameters adopted for
modelling are detailed in Table 3-2 below. The catchments adopted for the MUSIC model are shown on
Figure 4.




QIC Noosa Civic Pty Ltd                              Version 1                                     November 2014
Appendix D - SMP.docx                                                                                    Page 5

Section 142

Noosa Civic
Stormwater Management Plan



Table 3-2         MUSIC Model Meteorological Data and Rainfall-Runoff Parameters

           Source Node                                                Treatment Type
 Rainfall station                 Noosa Shire Council – Cooroy Composite – Station 40059
 Time step                        6 minute
 Modelling period                 1/01/1973 - 31/12/1989
 Mean annual rainfall (mm)        1600
 Evapotranspiration               Cooroy Composite – Station 40059
                                  (Reference: Table 3.1, Water by Design, 2010)
 Rainfall runoff parameters       Urban Residential (Reference: Table 3.7 Water by Design, 2010)
 Pollutant export parameters      Urban Residential split catchments (Reference: Table 3.8 Water by Design, 2010)



3.2.1             Full Site Treatment
A split land use catchment breakdown was adopted in the model. Details of the catchment breakdown and
source nodes are provided in Table 3-3, with the model layout presented below in Schematic 1.




Schematic 1 – Full site treatment MUSIC Model Layout


Table 3-3         Full Site Treatment Basin MUSIC Catchment Parameters

         MUSIC Node                     Description                   Area             Land Use            Total
                                                                      (ha)                               Impervious
                                                                                                            (%)
     Car Park and Road          All car park areas and new            2.344            Commercial           75%
                                           roads
          Green Areas              All landscape areas                0.877                                  5%
               Roof                     All roof areas                2.739                                 100%
 Walkways and Hardstand           All walking paths and               1.026                                 80%
                                  general public areas




QIC Noosa Civic Pty Ltd                                   Version 1                                     November 2014
Appendix D - SMP.docx                                                                                         Page 6

Section 143

Noosa Civic
Stormwater Management Plan



For this scenario, stormwater quality treatment will be provided by multiple bio-retention basins located in the
surface car parks and other appropriate areas. It is considered conservative to model all bio-retention areas
as a single node in the MUSIC model due to a drop in treatment effectiveness with larger basin sizes. The
adopted bio-retention parameters and required total treatment area are listed in Table 3-4.
Table 3-4         Full Site Treatment Basin Details

 Design Parameters                                         Value
 Filter Area (m2)                                           850
 Filter Depth (m)                                           0.4
 Extended Detention Depth (m)                               0.2
 Saturated hydraulic conductivity (mm/hr)                   200
 TN content of filter media (mg/kg)                         400
 Orthophosphate content of filter media (mg/kg)             50


Table 3-5 presents the results obtained from the MUSIC model.
Table 3-5         Full Site Treatment Basin MUSIC Model Results

             Pollutant           Proposed without     Proposed with         Reduction        Target Reduction
                                    treatment           treatment           Achieved                (%)
                                      (kg/yr)             (kg/yr)              (%)
  Total Suspended Solids              14200                2710                81.0                  80
  Total Phosphorous                    31.7                 12.3               61.2                  60
  Total Nitrogen                       231                  107                53.6                  45
  Gross Pollutants                     1520                  0                 100.0                 90


With reference to Table 3-5, it can be concluded that bio-retention basins with a cumulative filter media
surface area of 850 m2 will be sufficient to satisfy the water quality objectives applicable to the site. The
proposed locations of the basins are shown on Figure 6.

3.2.2             Water Re-use and Treatment
For this option, a 300 kL rainwater tank is proposed to be installed to capture runoff from all roof surfaces for
subsequent re-use in irrigation and toilet flushing. Runoff from the remainder of the site, including overflow
from the tank, will be directed to bio-retention treatment as per the full site option.
Typical irrigation rates for landscaped areas are in the order of 2mm/m 2/day. For those days of moderate to
heavy rainfall it is not necessary to provide additional irrigation of landscaped areas.
Cooroy Composite rainfall station statistics from the Bureau of Meteorology indicate that there are 89 days
per year on average where rainfall exceeds 2mm.
It has conservatively been estimated that irrigation of the landscape area will be required for an average 276
days per year.
The resultant water usage for irrigation of landscape areas is shown in Table 3-6.
The typical water usage rates for toilet flushing purposes in retail and restaurant areas were taken from
Table A of DNRW’s Planning Guidelines for Water Supply and Sewerage (2014). The average water use
ranges and the adopted values were:
           Major Shopping Development: 300 to 800 L/day/100m2 (550 L/day/100m2 adopted)
           Restaurant: 800 to 1800 L/day/100m 2 (1300 L/day/100m 2 adopted)
Approximately 50% of the water demand was assumed to be non-potable.
The resultant water usage for retail and public buildings is shown in Table 3-6.


QIC Noosa Civic Pty Ltd                               Version 1                                    November 2014
Appendix D - SMP.docx                                                                                    Page 7

Section 144

Noosa Civic
Stormwater Management Plan



Table 3-6         Total Water Demands

               Land Use               Non-Potable
                                     Water Demand
                                        (kL/day)
 Landscape Areas                         13.28
 Major Shopping Development              71.05
 Restaurant Areas                        10.12
 Total                                   106.33


A split land use catchment breakdown was adopted in the model. Details of the catchment breakdown and
source nodes are provided in Table 3-6, with the model layout presented below in Schematic 2.




Schematic 2             Water Re-use and Treatment Basins MUSIC Model Layout




QIC Noosa Civic Pty Ltd                             Version 1                            November 2014
Appendix D - SMP.docx                                                                          Page 8

Section 145

Noosa Civic
Stormwater Management Plan



Table 3-7         Water Re-use and Treatment MUSIC Catchment Parameters

         MUSIC Node                   Description                      Area                Land Use               Total
                                                                       (ha)                                     Impervious
                                                                                                                   (%)
     Car Park and Road         All car park areas and new              2.344              Commercial               75%
                                          roads
          Green Areas              All landscape areas                 0.877                                        5%
               Roof                   All roof areas                   2.739                                       100%
 Walkways and Hardstand          All walking paths and                 1.026                                       80%
                                 general public areas


The parameters of the bio-retention system adopted and required treatment area for the analysis are listed in
Table 3-8.
Table 3-8         Water Re-use and Treatment Basins Details

 Design Parameters                                             Value
 Filter Area (m2)                                                700
 Filter Depth (m)                                                0.4
 Extended Detention Depth (m)                                    0.2
 Saturated hydraulic conductivity (mm/hr)                        200
 TN content of filter media (mg/kg)                              400
 Orthophosphate content of filter media (mg/kg)                  50


The parameters of the rainwater tank adopted for the analysis are listed in Table 3-9.
Table 3-9         Water Re-use and Treatment Rainwater Tank Details

                                                   Design Parameters
 Volume below overflow pipe (kL)                                                        300
 Depth above overflow (m)                                                               0.2
 Surface Area (m2)                                                     89.9 (based off a 10.7m diameter tank)


Table 3-10 below presents the effectiveness of using a rainwater tank on site and its reductions of pollutants
from the roof areas.
Table 3-10         Rainwater Tank Effectiveness

  Rainwater Tank Effectiveness                           Value
  Flow In (ML/year)                                      31.50
  Flow Out (ML/year)                                     19.88
  Reuse Supplied (ML/year)                               11.65
  Reuse Requested (ML/year)                              34.50
  % Reuse Demand Met                                     33.76
  % Total Suspended Solids Reduction                     39.90
  % Total Phosphorous Reduction                          37.46
  % Total Nitrogen Reduction                             37.81




QIC Noosa Civic Pty Ltd                                  Version 1                                              November 2014
Appendix D - SMP.docx                                                                                                 Page 9

Section 146

Noosa Civic
Stormwater Management Plan



Table 3-11 below presents the results obtained from the MUSIC model of the bio-retention systems.
Table 3-11 Multiple Bio-Retention Basins MUSIC Model Results

             Pollutant       Proposed without     Proposed with          Reduction        Target Reduction
                                treatment           treatment            Achieved                (%)
                                  (kg/yr)             (kg/yr)               (%)
  Total Suspended Solids          14000                 59.4                 80                  80
  Total Phosphorous                31.4                2810                 63.2                 60
  Total Nitrogen                   228                  11.6                 57                  45
  Gross Pollutants                 1520                  0                 100.0                 90


With reference to Table 3-11, a rainwater tank treatment system which captures roof runoff with bio-retention
basins provided downstream will adequately reduce pollutant load exports to meet the applicable water
quality objectives, whilst allowing sustainable water principles to be applied on site.




QIC Noosa Civic Pty Ltd                           Version 1                                     November 2014
Appendix D - SMP.docx                                                                                Page 10

Section 147

Noosa Civic
Stormwater Management Plan




4                 Conclusion
A Stormwater Management Plan has been prepared to support the proposed expansion of Noosa Civic. The
key findings of the investigation are detailed below:
          Regional Flooding
           Council’s regional flood and storm tide mapping indicates that the proposed development will be
           above all regional flood events.
          Stormwater Quantity
           A detention basin (see Figure 5) is proposed to be operated in conjunction with flood storage within
           the car park area to mitigate the potential impact on peak flow rate resulting from development of the
           catchment. Based on the analysis, mitigation of developed peak flows to existing conditions will
           result in no adverse flooding impacts external to the site.
          Stormwater Quality
           It will be necessary to treat runoff from the site to satisfy the water quality objectives defined by the
           State Planning Policy (DSDIP, 2014) and Noosa Shire Council.
           Modelling of two approaches for the treatment of runoff was completed using the industry-standard
           MUSIC software.
           o            Bio-basin Treatment
                        For this scenario, runoff from the entire site was considered to be treated by a bio-retention
                        systems as shown on Figure 6.
           o            Water Re-use Tank and Bio-Basin Treatment
                        For this scenario, a 300 kL rainwater tank capturing runoff from roof surfaces for suitable re-
                        use purposes, with the remaining water to then be treated by bio-basins to the required
                        standards, was considered.
           Both treatment scenarios were found to satisfy the applicable water quality objectives. A decision
           will be made at detailed design in relation to the solution to be ultimately adopted.


Given the results obtained with respect to stormwater quality and quantity, it is considered that the site can
be developed from a stormwater management perspective without producing unacceptable impacts.




QIC Noosa Civic Pty Ltd                                    Version 1                                     November 2014
Appendix D - SMP.docx                                                                                         Page 11

Section 148

Noosa Civic
Stormwater Management Plan




Noosa Civic




FIGURES




Figure 1          Site Location
Figure 2          Existing WBNM Model
Figure 3          Developed WBNM Model
Figure 4          MUSIC Model Layout
Figure 5          Concept Stormwater Quantity
                  Management
Figure 6          Concept Stormwater Quality
                  Management




QIC Noosa Civic Pty Ltd                         Version 1   November 2014
Appendix D - SMP.docx                                            Page 12

Section 149

Noosa Civic Shopping Centre Development
Stormwater Management Plan




 Cardno All Rights Reserved 2014.                                                                       Scale 1:3,000 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media,
to any person other than by agreement with Cardno. This document is produced by Cardno
solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno
                                                                                                           FIGURE 1
                                                                                                       Site Location
does not and shall not assume any responsibility or liability whatsoever to any third party arising
out of any use or reliance by third party on the content of this document.
Aerial imagery courtesy of Nearmap, 2014




QIC GLOBAL REAL ESTATE

Section 150

Noosa Civic Shopping Centre Development
Stormwater Management Plan




                                                                                                           D




                                                                                                       E           A



                                                                                                               B       C




 Cardno All Rights Reserved 2014.                                                                                                  Scale 1:3,000 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media,
to any person other than by agreement with Cardno. This document is produced by Cardno
solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno
                                                                                                                                      FIGURE 2
                                                                                                                           Existing WBNM Model
does not and shall not assume any responsibility or liability whatsoever to any third party arising
out of any use or reliance by third party on the content of this document.
Aerial imagery courtesy of Nearmap, 2014




QIC GLOBAL REAL ESTATE

Section 151

Noosa Civic Shopping Centre Development
Stormwater Management Plan




                                                                                                           D

                                                                                                                               F1


                                                                                                                    F2

                                                                                                       E                       G1
                                                                                                                          G2
                                                                                                           F3

                                                                                                                     G3


                                                                                                               G4          H




 Cardno All Rights Reserved 2014.                                                                                                             Scale 1:3,000 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media,
to any person other than by agreement with Cardno. This document is produced by Cardno
solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno
                                                                                                                                                 FIGURE 3
                                                                                                                                    Developed WBNM Model
does not and shall not assume any responsibility or liability whatsoever to any third party arising
out of any use or reliance by third party on the content of this document.
Aerial imagery courtesy of Nearmap, 2014




QIC GLOBAL REAL ESTATE

Section 152

Noosa Civic Shopping Centre Development
Stormwater Management Plan




 Cardno All Rights Reserved 2014.                                                                             Scale 1:3,000 (A3)
Copyright in the whole and every part of this drawing belongs to Cardno and may not be used,
sold, transferred, copied or reproduced in whole or in part in any manner or form or on any media,
to any person other than by agreement with Cardno. This document is produced by Cardno
solely for the benefit of and use by the client in accordance with the terms of the retainer. Cardno
                                                                                                                 FIGURE 4
                                                                                                       MUSIC Model Layout
does not and shall not assume any responsibility or liability whatsoever to any third party arising
out of any use or reliance by third party on the content of this document.
Aerial imagery courtesy of Nearmap, 2014




QIC GLOBAL REAL ESTATE

Section 153

Noosa Civic Shopping Centre Development
Stormwater Management Plan

-
meee Site Boundary

or oe a on w)
a : Mie hy HED stormwater Storage Areas
© Cardno All Rights Reserved 2014. Scale 1:1,250 (A3)
FIGURE 5

Copyright in the whole and every part oithis drawing belongs to Cardno and may not be> used,
sold, transferred, copied or reproduced in whole or in part in an¥ manner or form or on a any media,

to any person other than by agreement with Cardno. This document is produced by Carrdno- y
solely for the benefit of and use by the dient in accordance withthe terms of the retainer. Carcno 62
Sa a ren a a a pa ne a oa :
ify an as bw payn tects Concept Stormwater Quantity Management

Aerial imagery courtesy of Nearmap, 2014
October 2014
QIC GLOBAL REAL ESTATE

CAD FILE: C\Users\benjamin carey ‘al\temp\AcPublish_6760\Figures_Additi
XREF's: PLAN_L1_NewCentre

 

Section 154

Noosa Civic Shopping Centre Development
Stormwater Management Plan

7, TAT

|
|
|
=]
I
a
=|
S|
|
a
S|
|
&
a
|

RUNOFF RUNOFF
FLOW, ____ FLOW

T
EXTENDED DETENTION 200,mm
DEPTH

FILTER MEDIA

TRANSITION LAYER

DRAINAGE LAYER

Typical Carpark Bioretention System
N.T.S

© Cardno All Rights Reserved 2014

Copyright in the whole and every part oithis drawing belongs to Cardno and may not be: used,
sold, transferred, copied or reproduced in whole or in part in anv manner or form or on a any media,
to any person other than by agreement with Cardno. This document is produced by Carrdno
solely for the berefit of and use by the cient in accordance withthe ‘erms ofthe retainer: Carcno.
does not and shall not assume any responsbility or liability wharsoever to any third party arising
out of any use or reliance by third party an the content ofthis document.

‘Actial imagery courtesy of Nearmnap, 2014
October 2014
QIC GLOBAL REAL ESTATE

CAD FILE: \ben jamin carey \appdata\local\temp\ AcPublish_6760\Figures_Additional_Full_report_fgures_v3.dwg
XREF's: Pl NewCentre

wee Site Boundary
{7 Bioretent on Treatment Areas
Scale 1:1,250 (A3)
FIGURE 6
Concept Stormwater Quality Management

Project No.: J13041

PRINT DATE: 27 November, 2014 - 123pm

 

Section 155

Noosa Civic
Stormwater Management Plan




Noosa Civic




APPENDIX



A
Regional Flood Mapping




QIC Noosa Civic Pty Ltd      Version 1   November 2014
Appendix D - SMP.docx                          Page 1

The text continues on section 156.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.