Original source · versioned page text
MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 140, section 1. The text section number identifies this passage in the reader.
Noosa Civic
Stormwater Management Plan
Table 2-3 Detention Basin Stage-Storage Details
Stage/ Depth Storage Volume
(m) (m3)
0.0 0.0
0.1 1.8
0.2 7.9
0.3 16.2
0.4 26.7
0.5 39.8
0.6 55.9
0.7 75.1
0.8 97.8
0.9 124.2
1.0 154.7
1.1 189.5
1.2 229.0
1.3 273.3
1.4 322.9
1.5 377.9
1.6 438.7
1.7 505.6
Table 2-4 presents the resulting pre- and post-developed flows for the range of Average Recurrence Interval
(ARI) flood events.
Table 2-4 Total Site Discharge
ARI Pre-development Post- Post- Mitigated Mitigated
(Years) Discharge development development Discharge Impact
(m3/s) Discharge Impact (m3/s) (m3/s)
(m3/s) (m3/s)
2 4.1 4.3 0.2 3.8 -0.3
5 5.5 5.7 0.2 5.2 -0.3
10 6.4 6.5 0.1 6.2 -0.2
20 7.6 7.7 0.1 7.5 -0.1
50 8.7 8.7 0.0 8.6 -0.1
100 9.9 9.9 0.0 9.9 0.0
The proposed basin in conjunction with storage in the car parks will provide sufficient mitigation of runoff to
ensure that there is no increase in peak flow rate discharged from the site.
QIC Noosa Civic Pty Ltd Version 1 November 2014
Appendix D - SMP.docx Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.