Original source · versioned page text
MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 161, section 1. The text section number identifies this passage in the reader.
Cardno
Project Title: Noosa Civic
Subject: Rational Method Hydrology Calculations - Catchment C Job No.: J13041
Designer: Benjamin C Check: Date: 22/8/2014 Page: 1 1
Rain Fall Data Used:
Location: NOOSA, BOM
AR&R Vol 2 1987 Parameters Time (hrs) i2 (mm/hr) i50 (mm/hr)
Skewness 0.10 1 51.60 96.00
F2 4.40 12 10.20 24.50
F50 17.60 72 3.40 8.90
Column and Variable Definition
Variable ARI (years)
1 2 5 10 20 50 100
fy 0.80 0.85 0.95 1.00 1.05 1.15 1.20
Catchment Data for Existing Catchment Conditions
Variable Value Unit
Area 2.57 ha
fi 0.263 Fraction
C10 0.753 Fraction
Catchment Discharges for Existing Catchment Conditions
Adopted Time: 15 Minutes (or 0.25 hours)
Variable ARI (Years)
1 2 5 10 20 50 100
fy 0.80 0.85 0.95 1.00 1.05 1.15 1.20
Intensity 82.1 104.8 131.0 146.2 166.8 194.0 214.8
Discharge 0.35 0.48 0.67 0.79 0.94 1.20 1.38
Calculation Type: QUDM Type 1 (C)
Version: EX.970907
Part 1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.