Original source · versioned page text
MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 21, section 1. The text section number identifies this passage in the reader.
PAPER SIZE A3 Map has been designed to be reproduced in colour All underground cables shall be treated as being energised. Where a cable is located that is not represented on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately. 4800 For Emergency Situations Please call 13 19 62 4900 5000 5100 pee"? \ / N\ N N | \ \ \ \ \ / 8200 | ————~] 8200 2 s re) 6K 8 | 8100 50.4800m 4900 5000 5100 This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site. UNCONTROLLED COPY energex DBYD Date: 20 Aug 14 Time: 13.56.41 Requested By: DBYD SCALE 1:1000 20 ° 20m Enquiry No: 41126703 STRIP No: 7 Cable Voltage A Ground Transtormer less Than 33k Cubicle Transformer Cable Voltage 33kV or Higher t= Ring Main Unit @) Metering Unit © Direer-Lay wv Link Pillar O Conduit [Service Pillar Multi-Section Junction Pillar Duct . ”\ Trench J Pit — mi Cable Joint Cable Tray b> Cable Termination LE] Tunnel Cable Marker x} Street Light Pole li Earth Works Order Polygon [] PAPER SIZE A3 Map has been designed to be reproduced in colour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.