August 2004 -12- 04682104(AB) 7.0 ACID SULFATE SOILS The development of potential acid sulfate soils (PASS) is commonly the result of marine or estuarine deposition of sulfate and iron bearing sediments in the presence of an abundant source of readily decomposable organic matter resulting in the deposition of pyrite. This pyrite is stable within the soil so long as anoxic conditions prevail. Oxidation of this material produces acidic conditions and oxidation typically occurs as the material is exposed above the water table by excavation. Previous experience and available guidelines indicate that Potential Acid Sulfate Soils (PASS) are normally restricted in extent to recent (Holocene to Pleistocene age) soil horizons deposited in a saline environment below RL 5m AHD. The State Planning Policy SPP2/02 Planning and Managing Development Involving Acid Sulfate Soils applies to land, soil and sediment at or below 5m AHD where the natural ground level is less than 20m AHD. Within such areas the SPP applies to development involving any of the following: > Excavating or otherwise removing 100 m’ or more of soil or sediment; or > Filling of land involving 500 m’or more of material with an average depth of 0.5 m or greater. The southern part of the site is consistent with the above criteria and the proposed development in this area involves placing fill up to about 3 m deep together with excavation for stormwater ponds / basins. Where the ground surface elevation falls below RL 5 m AHD, the proposed development covers an area about 150 m in total length by 15 min width. SPP2/02 is therefore applicable to this part of the site and an assessment of potential disturbance of ASS is required. 7.1 Investigation Aims The aims of this investigation were to: > Conduct an ASS assessment in accordance with SPP 2/02 and Queensland Sampling Guidelines; > Identify the presence or absence of ASS in the proposed disturbance area; and > Provide an indication of the likely location of ASS, and treatment methodology. The results of the ASS investigation follow. It should be noted that ground water was not encountered in any of the three ASS investigation test pits. Consequently, a ground water investigation (in accordance with SPP2/02) was not conducted. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.