Original source · versioned page text
MCU14/0106 Appendix E - Engineering Report
The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 47, section 1. The text section number identifies this passage in the reader.
oo August 2004 -16- 04682104(AB) Such measures could be incorporated into an Environmental Management Plan (EMP) for the site which we understand will be required for the proposed construction works. 8.0 IMPORTANT INFORMATION Your attention is drawn to the document - “Important Information About Your Geotechnical Engineering Report”, which is included in Appendix D of this report. This document has been prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which Golder Associates is a member. The statements presented in this document are intended to advise you of what your realistic expectations of this report should be, and to present you with recommendations on how to minimise the risks associated with the groundworks for this project. The document is not intended to reduce the level of responsibility accepted by Golder Associates, but rather to ensure that all parties who may rely on this report are aware of the responsibilities each assumes in so doing. Yours faithfully GOLDER ASSOCIATES PTY LTD Ashley Davey Geoff Hurley MSc DIC C.Geol RPEQ 5716 Geotechnical Engineer Office Manager \\MARI-S-FILEO1VOBS\2004\GEOTECENICAL\04682 104\CORRESPONDENCE\AB04682104R.DOC ACD/GAH/acd ’ Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.