Skip to the record
The gold standard in government transparency.

Original source · versioned page text

MCU14/0106 Appendix E - Engineering Report

of 175

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (24.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 71, section 1. The text section number identifies this passage in the reader.

 

Gis.

REPORT O

F BOREHOLE: GA20

SHEET: 1 OF 1

 

 

 

 

 

 

GAPS_1_MDORE.GLB FULL PAGE J:\2004\GEOTECHNICALI046821041FIELDWORK_LOGS\04882104TPBH.GPJ_GAPS_1.GDT_06/08/2004_12:42:22 PM

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLIENT: Stockwell Building & Development POSITION: Refer to Site Plan DRILL RIG: Edson CP1
PROJECT: Noosa Business Centre - Stage 1 SURFACE RL: 12m DATUM: AHD71 DRILLER: Contract Drilling
LOCATION: Eenie Creek Road INCLINATION: -90° LOGGED: PGH DATE: 22/7/04
JOB NO: 04682104 HOLE DIA: 100 mm_HOLE DEPTH: 5.00 m CHECKED: DATE:
Drilling ‘Sampling Field Material Description
Ee
iow 9 s g
Eo Z w ho STRUCTURE AND
|. | 3 eater Qe SOIL/ ROCK MATERIAL DESCRPTION 5 be ADDITIONAL
bf Es 8 Be a 5 Ba OBSERVATIONS
Bs] s | BE [Pa 3] 88/8 2 Be
007550 Te ]SM] Sity SAND a
4 020 . fine to medium grained, light grey, trace of root matter =
7780 | BDS0.20-050m ML | Oayey SIT |
7 low plasticity, light grey, trace of light brown
g | 95 4
4 &
E 070 =
3 "39 Sey CAT sch .
a 7 1U50.0.80-0.90m medium to high plasticity, light grey and light brown
8 1 4.00
2] 10-4 ba =~ — — —  — — —___ _-_____— 4 4
& | 106 becoming medium plasticty, pale grey
$s 4
3
Zz 4
& 4 ve
° iJ
154 —~- 4
4 nay
7 a4
204 4
3 5. | 250 :
7 DS260270n high plasticity, pale grey and red
2.80
9.20
304 = 4
5: 3.50. 4
3s 32
40—| 4
45 DS450460m q
e9_| 500 =
8700 END OF BOREHOLE @ 500m

 

absence of soil or groundwater contamination.

 

 

 

This report of borehole must be read in conjunction with accompanying notes and abbreviations. It has been prepared for geotechnical purpases only, without
attempt to assess possible contamination. Any references tp potential contamination are for information only and do not necessarily indicate the presence or

GAP gINT FN. F0ta]
Ri2|

 

 
Log in to download the original file

MCU14_0106 Appendix E - Engineering Report.pdf · 24.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.