Skip to the record
The only place to find full transcripts.

Council archive · source document

09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published] · 142009.134

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (cont)
If no, is any part of any ERA intended to be located in a high preservation area?

 

0 Yes
if yes, is each proposed ERA one of the following?
() ERA, item 15 (sewage treatment) LJ No [1 Yes
(ii) ERA, item 16 (municipal water treatment plant) CINo (Yes
{iti) ERA, item 19 (dredging material) LNo [1] Yes
(iv) ERA, item 20 (extracting rock or other material) located outside waters and the CJNo [1 Yes

activity is a borrow pit of not more than 10,000m* for -
¢ — specified works under the Wild Rivers Act 2005; or
* residential complexes, as defined under the Environmental Protection Act 1994

. {v)_ ERA, item 22 ( screening ete. materials) and carried out outside waters and the activity O No
is for -
« — specified works under the Wild Rivers Act 2005; or
+ — for residential complexes, as defined under the Environmental Protection Act 1994

(vi) ERA, item 11 (crude oil or petroleum product storage) and the activity is - CINo (1 Yes
* alevel 2 ERA; and
« for residential complexes, as defined under the Environmental Protection Act 1994; &
* carried out outside a designated urban area, as defined under the Wild Rivers Act
2005
(vii) An exempt environmentally relevant activity, as defined under Environmental Protection .[_] No OD Yes
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005
if yes to any one of i) @ — (vii) above - Unless the application is consistent with any property development plan applying to the land, and
the application is accompanied by an allocation notice. the Assessment Manager must refuse to receive it. (Complete Form 1. Part G), This
application requires assessment by the Administering Authority for the purposes of the Environmental Protection Act 1994. If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Subject to
any limitations in the declaration for the wild river area and the Wild Rivers code, assessment is also required for the purposes of the Wild

Rivers Act 2005. In particular, ERAs 15 and 16 and an ‘exempt environmentally relevant activity’ do not require assessment for the
purposes of the Wild Rivers Act 2005 if the proposed is located in a designated urban area

 

   

If no to alll of (i) - (vii) above - An application for the ERAS will be taken to be not propedly made and the Assessmeni Manager must
refuse fo receive it,
No

Ino, is any ERA an item 20 ERA (extracting rock or other material) intended to be located outside waters?

oO No — Unless the application is consistent with any property development pian appiving te the land, and the aplication is accompanied by
an allocation notice, the Assessment! Manager must refuse to receive it (Complete Form 1, Part G). This application requires
assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
2005. if the Administering Authority is not the Assessment Manager lor the application, the agency has jurisdiction as Concurrence
Agency.

(Yes

if yes, does the ERA meet the following?
{i) the activity is located inside a flood management area and a borrow pit of not C1] No [4 Yes
more than 10,000m? for -

* — specified works under the Wild Rivers Act 2005; or
* — residential complexes, as defined under the Environmental Protection Act 1994

(i) the activity is located outside a flood management area CINo [£] Yes

If yes to either (i) or (i) above - Unless tne application is consistent with any property development plan applying to the land, and
the application Is accompanied by an allocation notice, the Assessment Manager must refuse io receive if. (Complete Form 1.
Part G). This application requires assessment by the Administering Authonily for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005. if the Adminisiering
Authority is not the Assessment Manager for the application. the agency has jurisdiction as Concurrence Agency.

If no to both (i) and (ii) above - An application for the ERA will be taken to be not properly made and the Assessment manager must
refuse to receive it.

 

 

 

 

 

Page 3

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.