Council archive · source document
09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published] · 142009.134
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
S ECTI O N 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41 ‘s any of the proposed operational work assessable under a planning scheme?
RELNo - Goto 012 C1 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below,
STATE-CONTROLLED ROAD
4.1.1 |1s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
LINo
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
Oo No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurter:ce Agency.
(Yes
If yes, is all of the proposed operational work associated with the following?
(i) A material change of use that is assessable under the planning scheme (No [Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots LJNo [J Yes
abutting the State-controlled road
\f no to either or both (i) or {ii) above - Answer (a) - (c) below
(a) Is any of the proposed operational work associated with access to a State-controlled road?
oOo No Oo Yes - This application must be referred to the Department of Main Reads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
(No (Yes
IF yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
O Yes - This application mus! be referred to DMR as Advice Agency.
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
[INo (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
O No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
oO Yes - This application must be referred to DMR as Advice Agency.
sun, se hemnds 2 baie 3 Re:
IP dsegeiaiest schedule 2 adie 5, kom 3 i
ACID SULFATE SOILS
4.1.2 | Is any of the operational work proposed in a local government area listed" in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
[No -Gotoast3 (1) Yes
It yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
["] No (] Yes
If yes, does the proposed operational work involve the following?
{i} Excavating more than 1,000m° of soil or sediment at or below 5m AHD LINo (J Yes
{ii} Filling the premises with 1,000m® or more of material with an average depth of 0.5m on Lino [1 Yes
land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NAW) as
Advice Agency
41 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.