09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published] · 142009.134
IDAS Assessment Checklist, Version 21,3, $ May 2008
AAS
WILD RIVER AREA
Is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
BINo-Gotoos16 (1) Yes
STATE-CONTROLLED ROAD
lt yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
() Agricultural activities as defined under the Wild Rivers Act 2005 (No U1 Yes
(i) Animal husbandry activities as defined under the Wild Rivers Act 2005 CI No (CJ Yes
If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
oO Yes - An application for the operational work will be taken to be nol property made and the Assessment Manager must reluse to receive it
LI No
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
| Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive ii
Cl No - Unless the appixation is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part Rit animal husbandry) Subject to the declaration for the
refevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NAW). if NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
PORT RR te Bion tan eo,
we BE Rea One
4.16
ls any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[[] No - End ofsections Yes
Hf yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
(i) A material change of use that is assessable under the planning scheme
BINo (] Yes
(ii) Reconfiguring a tot that increases the total number of lots, or increases the total number of lots = BelNo ([] Yes
abutting the State-controlled road
If no to either or both (i) or (ii) above, and answers to questions in this section of the checklist indicate the proposed
operational work is assessable under IPA, schedule @ ~ Answer (a) - (c) below.
(a) BIN of the proposed operational work associated with access to a State-controlied road?
No oO Yes - This application must be referred to the Department of Main Roads {OMR) as Concurrence Agency.
{b} fs any of the proposed operational work for filling or excavation?
BI No CJ Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
oO No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
Oo Yes - This application must be referred to the OMR as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, @
me a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
No
(Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
C) No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
) Yes - This application must be referred to the DMR as Advice Agency.
Bean y
Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0134 - Operational Works - Prescribed Tidal Works - Transport Type 5 (Jetty) [As Published]Related documentApplication case desk ↗