QC100259_Pomona Exchange_DD_Rev01-220630
Attached to the e-mail Operational Works Application OP"W22/0174 - DA Form 1 & 2 - Plans - 25 Railway Pde, Pomona.
1 2 3 4 5 6
NOTES:
PROPOSED SAN MAIN SWITCH
1. ALL LOW VOLTAGE AND ELECTRICAL INSTALLATION
A IN PROPOSED SAN DB ON A
SHALL BE IN ACCORDANCE WITH THESE SPECIFICATION,
EXTERNAL WALL OF TELSTRA
TELSTRA CIVIL DESIGN MANUAL, TELSTRA EARTHING
32A/1P EXCHANGE BUILDING - TO BE
MANUAL, ALL REFERENCED TELSTRA STANDARD
BY TELEPOWER INSTALLED BY TELEPOWER
DOCUMENTATION ALONG WITH AS/NZS3000, AS/NZS3008,
AS/NZS3015, AS/NZS3017, AS/NZS1768, AS/ACIF S006,
RELEVANT STATE/TERRITORY SPECIFIC INSTALLATION PROPOSED 2C+E 10mm² MAINS.
RULES AND ALL OTHER RELEVANT AUSTRALIAN APPROX. CABLE RUN 30m
BY SAN TEAM
STANDARDS AS APPLICABLE TO PROPOSED WORKS.
2. ALL LOW VOLTAGE AC POWER WORKS SHALL BE
COMPLETED BY LICENSED ELECTRICIAN IN ISOLATOR INSIDE DISTRIBUTION SURGE PROTECTION DEVICE SIMILAR
ACCORDANCE WITH INSTALLATION RULES AND 100A, 1PH, 240V, 12 POLE BOARD TO CLIPSAL 4AFRC225 IN AN EXTERNALLY
B RELEVANT SAFETY PRACTICES APPLICABLE TO SITE. DISTRIBUTION BOARD B
MOUNTED ENCLOSURE ON THE H-FRAME
3. ALL WORKS SHALL BE LIAISED AND COORDINATED WITH IP56 RATED. LOCKABLE. ADJACENT TO DISTRIBUTION BOARD
RELEVANT PERSONNEL, SITE REPRESENTATIVES, 100A,1PH
LANDOWNER, SITE PROVIDER AND/OR POWER ISOLATOR
AUTHORITY AS APPLICABLE.
4. ALL WORKS SHALL BE AS PER TELSTRA SPECIFICATIONS 32A
AND APPROVED MOPS INCLUDING LABELLING. SPARE MCB SURGE PROTECTION DEVICE
5. CONTRACTOR SHALL MAKE THEMSELVES AWARE OF ALL 20A 32A WITH FAIL INDICATION
RCBO RCBO SPACES
SITE CONDITIONS AND SAFETY REQUIREMENTS PRIOR
TO COMMENCING ANY WORK ON SITE.
6. CONTRACTOR TO VALIDATE ALL APPROVALS AND POWER
POWER
OUTAGES REQUIRED TO CONDUCT PROPOSED WORKS. OUTLET
OUTLET
C THIS INCLUDES BUT IS NOT LIMITED TO ANY DONOR C
SITES AND/OR FAR END SITES WHICH MAY BE IMPACTED
DUE TO PROPOSED WORKS. POWER PLUG
7. ALL CONTRACTORS WORKING ON TELSTRA FACILITIES (AUSTRALIAN STANDARD)
SHALL BE TELSTRA ACCREDITED AS PER TELSTRA MFR. AC SATELLITE DISH
PROTOCOLS. POWER CABLE ANTENNA
8. ALL LV CABLES SHALL BE INSTALLED IN CONDUITS. ANY PDU/ (XCVR, HP BUC,
EXPOSED CONDUITS SHALL BE UV PROTECTED. POWER SUPPLY LNB & FEED)
9. NO SEPARATE METERING IS REQUIRED FOR SAN MFR. AC POWER CABLE MFR. DC MFR. DC
INSTALLATION UNLESS SPECIFIED AND DIRECTED BY POWER CABLE POWER CABLE
FIBER
TELSTRA.
EQUIPMENT MFR. DC
10. NEUTRAL AND ELECTRICAL SAFETY EARTH FOR SAN
D INSTALLATION SHALL BE TAKEN FROM EXCHANGE POWER CABLE D
EXISTING M.E.N. MFR. TLM
CONDUIT W/ CABLES
FIBER
OAN CABINET
(CABLE MANAGEMENT HOOD/AC UNIT
NOT SHOWN FOR CLARITY)
FIBER INTERFACE MFR. AC DATA CABLE ELECTRONICS
E PANEL ENCLOSURE E
(AT H-FRAME)
AC POWER CONNECTION
NOT TO SCALE
FOR CONSTRUCTION
FOR SITE SPECIFIC NOTES REFER TO SHEET S0.
ORDER DRAWN CHKD AMENDMENT EXAM APPD DATE ISS
183929 JM MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
SATELLITE ACCESS NODE SITE 183929
COMPLIANCE BOX POMONA EXCHANGE
COMPLETED AS PER DESIGN
F AC POWER CONNECTION F
ALTERATIONS IN RED 25 RAILWAY PARADE, POMONA, QLD 4568
NAME (PRINT)
DWG SHT E2
SIGNATURE DATE
C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved. NO. QC100259 NO. .
1 2 3 4 5 Cad file: QC100259.dwg A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.