         1                                          2                                    3                                                   4                                                            5                                                6

    NOTES:
                                                                                                                         PROPOSED SAN MAIN SWITCH
    1. ALL LOW VOLTAGE AND ELECTRICAL INSTALLATION
A                                                                                                                        IN PROPOSED SAN DB ON                                                                                                                                   A
        SHALL BE IN ACCORDANCE WITH THESE SPECIFICATION,
                                                                                                                         EXTERNAL WALL OF TELSTRA
        TELSTRA CIVIL DESIGN MANUAL, TELSTRA EARTHING
                                                                                                          32A/1P         EXCHANGE BUILDING - TO BE
        MANUAL, ALL REFERENCED TELSTRA STANDARD
                                                            BY TELEPOWER                                                 INSTALLED BY TELEPOWER
        DOCUMENTATION ALONG WITH AS/NZS3000, AS/NZS3008,
        AS/NZS3015, AS/NZS3017, AS/NZS1768, AS/ACIF S006,
        RELEVANT STATE/TERRITORY SPECIFIC INSTALLATION                                                                   PROPOSED 2C+E 10mm² MAINS.
        RULES AND ALL OTHER RELEVANT AUSTRALIAN                                                                          APPROX. CABLE RUN 30m
                                                            BY SAN TEAM
        STANDARDS AS APPLICABLE TO PROPOSED WORKS.
    2. ALL LOW VOLTAGE AC POWER WORKS SHALL BE
        COMPLETED BY LICENSED ELECTRICIAN IN                                                                             ISOLATOR INSIDE DISTRIBUTION                                        SURGE PROTECTION DEVICE SIMILAR
        ACCORDANCE WITH INSTALLATION RULES AND                100A, 1PH, 240V, 12 POLE                                   BOARD                                                               TO CLIPSAL 4AFRC225 IN AN EXTERNALLY
B       RELEVANT SAFETY PRACTICES APPLICABLE TO SITE.         DISTRIBUTION BOARD                                                                                                                                                                                                 B
                                                                                                                                                                                             MOUNTED ENCLOSURE ON THE H-FRAME
    3. ALL WORKS SHALL BE LIAISED AND COORDINATED WITH        IP56 RATED. LOCKABLE.                                                                                                          ADJACENT TO DISTRIBUTION BOARD
        RELEVANT PERSONNEL, SITE REPRESENTATIVES,                                                         100A,1PH
        LANDOWNER, SITE PROVIDER AND/OR POWER                                                             ISOLATOR
        AUTHORITY AS APPLICABLE.
    4. ALL WORKS SHALL BE AS PER TELSTRA SPECIFICATIONS                                                       32A
        AND APPROVED MOPS INCLUDING LABELLING.                                           SPARE                MCB        SURGE PROTECTION DEVICE
    5. CONTRACTOR SHALL MAKE THEMSELVES AWARE OF ALL             20A      32A                                            WITH FAIL INDICATION
                                                                 RCBO     RCBO           SPACES
        SITE CONDITIONS AND SAFETY REQUIREMENTS PRIOR
        TO COMMENCING ANY WORK ON SITE.
    6. CONTRACTOR TO VALIDATE ALL APPROVALS AND                            POWER
                                                             POWER
        OUTAGES REQUIRED TO CONDUCT PROPOSED WORKS.                        OUTLET
                                                             OUTLET
C       THIS INCLUDES BUT IS NOT LIMITED TO ANY DONOR                                                                                                                                                                                                                            C
        SITES AND/OR FAR END SITES WHICH MAY BE IMPACTED
        DUE TO PROPOSED WORKS.                                                               POWER PLUG
    7. ALL CONTRACTORS WORKING ON TELSTRA FACILITIES                                         (AUSTRALIAN STANDARD)
        SHALL BE TELSTRA ACCREDITED AS PER TELSTRA                                                                                                                      MFR. AC                                  SATELLITE DISH
        PROTOCOLS.                                                                                                                                                      POWER CABLE                                 ANTENNA
    8. ALL LV CABLES SHALL BE INSTALLED IN CONDUITS. ANY                                                                                PDU/                                                                     (XCVR, HP BUC,
        EXPOSED CONDUITS SHALL BE UV PROTECTED.                                                                                     POWER SUPPLY                                                                   LNB & FEED)
    9. NO SEPARATE METERING IS REQUIRED FOR SAN                                              MFR. AC POWER CABLE                                                        MFR. DC                                                                                MFR. DC
        INSTALLATION UNLESS SPECIFIED AND DIRECTED BY                                                                                                                   POWER CABLE                                                                            POWER CABLE
                                                                                                                                         FIBER
        TELSTRA.
                                                                                                                                       EQUIPMENT                                                                                                               MFR. DC
    10. NEUTRAL AND ELECTRICAL SAFETY EARTH FOR SAN
D       INSTALLATION SHALL BE TAKEN FROM EXCHANGE                                                                                                                                                                                                              POWER CABLE       D
        EXISTING M.E.N.                                                                                                                                                                                       MFR. TLM
                                                                                             CONDUIT W/                                                                                                       CABLES
                                                                                             FIBER




                                                                                                                                OAN CABINET
                                                                                                                      (CABLE MANAGEMENT HOOD/AC UNIT
                                                                                                                          NOT SHOWN FOR CLARITY)

                                                                                     FIBER INTERFACE          MFR. AC DATA CABLE                                                                                  ELECTRONICS
E                                                                                         PANEL                                                                                                                    ENCLOSURE                                                     E
                                                                                       (AT H-FRAME)
                                                                                                            AC POWER CONNECTION
                                                                                                             NOT TO SCALE
                                                                                                                                                                                                                         FOR CONSTRUCTION
                                                                                                             FOR SITE SPECIFIC NOTES REFER TO SHEET S0.
                                                                                                              ORDER DRAWN      CHKD                   AMENDMENT                      EXAM APPD DATE ISS
                                                                                                             183929 JM         MF FOR CONSTRUCTION - SP30092467WO015DOWN - SATELLITE RC PG 17.06.22 0.1
                                                                                                                                                                                                                     SATELLITE ACCESS NODE SITE 183929
                                                                   COMPLIANCE BOX                                                                                                                                            POMONA EXCHANGE
                                                                 COMPLETED AS PER DESIGN
F                                                                                                                                                                                                                                  AC POWER CONNECTION                           F
                                                                 ALTERATIONS IN RED                                                                                                                                         25 RAILWAY PARADE, POMONA, QLD 4568
                                                                 NAME (PRINT)
                                                                                                                                                                                                                      DWG                                        SHT       E2
                                                                 SIGNATURE                    DATE
                                                                                                                     C Telstra Corporation Limited ABN 33 051 775 556 All rights reserved.                            NO.      QC100259                          NO.   .
         1                                          2                                    3                                                   4                                                           5                        Cad file: QC100259.dwg                        A3
Log in to download the original file

QC100259_Pomona Exchange_DD_Rev01-220630.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.