Att 1 Electrical
URD CIVIL WORKS SCHEDULE - BY ELECTRICAL CONTRACTOR
CONDUIT LENGTH (m) X-SECTION (m) SWITCHING & COMMISSIONING PLAN - LV
STATIONS P100 DRAW (subject to site conditions, amendments by switching co-ordinator and approval by
LOCATION 40 HD 100mm 125mm EXCAV TRENCH KERB MARK REMARKS
FROM - TO COMMS WIRE
/TAPE DETAIL LV outage co-ordinator)
No. m No. m No. m m
GHOSTGUM COURT 1-2 RE-USE EXISITING 80mm DIA CONDUIT
BUTLER STREET 4-5 1 20 DIRECTIONAL BORE UNDERNEATH TREE ROOTS, VACUUM LV SWITCHING - 1
EXCAVATION REQUIRED AT PROPOSED PILLAR LOCATION
STN 5 1. INSTALL NEW LV UG NETWORK IN GHOSTGUM COURT AS PER PLAN
6-7 1 34 DIRECTIONAL BORE UNDERNEATH TREE ROOTS, VACUUM
EXCAVATION REQUIRED AT PROPOSED PILLAR LOCATION
2. BREAK BRIDGES AT U70488 - GHOSTGUM COURT
STN 7
DIRECTIONAL BORE UNDER ROADWAY
3. MAKE NEW CONNECTIONS AT U70490(STN 1) - GHOSTGUM COURT
TOTAL 54m 4. REMAKE BRIDGES AT U70488- GHOSTGUM COURT
5. TEST AND COMMISSION
6. PERFORM POST COMMISSIONING CHECKS
UNDERGROUND CABLE SCHEDULE
STATIONS 415 VOLT 415 VOLT 240 VOLT 240 VOLT
LOCATION FROM - TO EX REC IN 240mm AL XLPE 16mm 4C 16mm 2C 4mm 2C REMARKS
LV SWITCHING - 2
LVA4240XPV LVC416XPV LVC216PVPV LVC24PVPV
GHOSTGUM COURT 1-2 X X -16 RECOVER EXISTING 16LV CABLE 1. INSTALL NEW LV UG NETWORK BETWEEN STN 4 - 5 AS PER PLAN
1-2 X 16 PULL CABLE THROUGH EXISTING 80mm DIA CONDUIT
2-3 X CUT & TERMINATE EXISTING 16mm² 4C CABLE AT STATION 2 2. LIVE BRIDGE NEW 16LV AT P209273 (STATION 4) - BUTLER STREET
BUTLER STREET 4-5 X 30
3. TEST AND COMISSION P307178
6-7 X 46
TOTAL 16 76 4. PERFORM POST COMISSIONING CHECKS
LV SWITCHING - 3
EQUIPMENT SCHEDULE
LOCATION STN NO SITE ID EXIST REC INSTALL SIZE AND DESCRIPTION IIN COMP ID PLANT No. MODEL ID QTY LCC REMARKS 1. INSTALL NEW LV UG NETWORK BETWEEN STN 6 - 7
GHOSTGUM COURT 1 U70490 X SERVICE PILLAR 1-WAY + SL PI1 1x240LV 1x120LV 1x16LV 2. LIVE BRIDGE NEW 16 LV AT P69186 (STATION 8) - BUTLER STREET
X PILLAR MEN EARTHING
X 240mm² AL LV LUG SET LVSPL240 1 3. TEST AND COMMISSION
P1403561 LP1403562
2 U12534917 X SERVICE PILLAR 1 -WAY PI1 LVSP2-6 1 1x240LV 1x16LV 4. PERFORM POST COMISSIONING CHECKS LINKS CLOSED LINKS CLOSED
X 16mm² CU LUG SET LVSPL016 1
X PILLAR MEN EARTHING LV4CMEN 1
BUTLER STREET 5 U12535170 X SERVICE PILLAR X ROAD P12 LVSP12-6 1 1 x 16LV
7 U12535171 X SERVICE PILLAR X ROAD P12 LVSP12-6 1 1 x 16LV
U70479
120 LV
OVERHEAD WORKS SCHEDULE
120 LV
POLES CONSTRUCTION
STN
120 LV GYMPIE
SITE ID STREET
LOCATION
No.
REMARKS U70480
(POLE No) EDT ANG EDT kN SST kN LST kN EXISTING RECOVER ERECT SINK FOOT COMP ID ALIGN LCC EXISTING RECOVER ERECT No KBS ANG LCC U70478 SP15358
-B/FS1
BUTLER STREET 4 P209273 11/8 EX LVABC/T EX
U70476
LVBR16/ABC 1 240 LV LP1284658
S/L LINKS OPEN
120 LV
LVT4C16 1 150 DO NOT EARTH CABLE GUARD
120 LV
MEN SP16143
91/DLL1
240 LV
6 P69186 14/12 EX 11P
LVP
LVT
RT
S/L
U
BANK CO
LVBR16/AOH 1
240 LV
-B/FS1
LVT4C16 1 150 DO NOT EARTH CABLE GUARD
SP15358 U1284657
STRINGY
200kVA
SP15358
T
M COUR
CONSUMER CONDUIT SCHEDULE - BY CIVIL CONTRACTOR
-B/FS1
FROM TO ELECTRICAL (m) COMMS (m)
U
LOCATION REMARKS
GHOSTG
STN LOT 40HD 50HD 63HD 80HD 20MD 50MD
SP15358
GHOSTGUM STREET 2 4 18
TOTAL 18m
STREET
-B/FS1
GROUND LEVEL U1284659
BUTTLER
SP15358
U70497
450mm
TAPE
600mm
COM
U70488
120 LV
SUMMARY SHEET COMMS
1 P302765
UNDERGROUND MATERIALS AS REQUIRED U70490
LINKS OPEN
/FS1
(Supplied by the URD Contractor) (Supplied by the URD Contractor)
E
SP3382-A
MODEL No. No. OFF MODEL No. No. OFF 2 U12534917
LVSP2-6 1 LV4CMEN 1
LVSPL240 1 LVA4240XPV 16
LVSPL016 3 LVC416XPV 76 ELECTRICAL CONDUITS
TOTAL
TRENCH LENGTH 54m
AS REQUIRED
SECTION VIEW
OVERHEAD MATERIALS EXISTING & PROPOSED LV SCHEMATIC DIAGRAM
(Supplied by the URD Contractor) SCALE NTS
MODEL No.
LVBR16/AOH
No. OFF
1
MODEL No. No. OFF
SHARED TRENCH ELECTRICAL / COMMS / WATER ALL NEW LV CABLES TO BE 240mm 4c Al XLPE UNO
LVBR16/ABC 1
LVT4C16 2 ELECTRICAL & COMMUNICATIONS SERVICE
CONDUITS (by Civil contractor )
URD CONTRACTOR SHALL NOTE THAT THIS SUMMARY SHEET MUST NOT BE USED FOR TENDER PURPOSES.
THE CONTRACTOR SHALL CHECK QUANTITIES AGAINST ACTUAL SCHEDULES ON THESE DRAWINGS.
Electrical and communication conduits to be installed in compliance with AS/NZ
3000 (SAA Wiring Rules).
· Electrical main conduit to be minimum as required orange heavy duty PVC
FOR APPROVALS
FILE: P:\221869\01 WORKING\A221869D
· Electrical service conduit to be minimum as required orange heavy duty PVC
· Communications conduit refer pit and pipe design (NOT FOR CONSTRUCTION)
· Protective cover strip to be laid above all service conduits. 08/03/2023 7:46 AM
· All conduits to be installed with draw wire.
CLIENT SITE CONTACT DETAILS ALIGNMENTS PROJECT
This document is CERTIFICATION:
the property of NAME ENERGEX OH 3.0RP
PROJECT /
SUB PROJECT NO. S2602337 APPROVED:
RPEQ No:
Ben Ryan
18090
5 LOT RESIDENTIAL SUBDIVISION
Ampflo Pty Ltd SHARON FOLEY ENERGEX UG 0-0.90 PARENT PROJECT NO. - 8/03/2023 83 BUTLER STREET, TEWANTIN
DATE:
and may only be COMPANY TELSTRA 2.1-3.0 WORK REQUEST NO. - SCHEDULES, LV SCHEMATIC
PLOT: 8/03/2023 7:46:21 AM
used for the ABN 28 111 423 842
purpose for
D 08/03/2023 REVISED TO REFLECT ARBORIST RECOMMENDATIONS REGARDING EXCAVATION SL BR BR ANDY SALMONS TOWN PLANNING ALLIANCE GAS N/A PLANNER & PHONE SUBDIVISIONS
Electrical and Telecommunications
& COMMISSIONING PLAN
which it was C 15/02/2023 FOR CONSTRUCTION ISSUE SL BR BR PHONE (07) 3361 9999 HP GAS N/A LOTS 1-5 Consultants CHECKED: U.STAROWICZ
commissioned. B 15/02/2023 FOR APPROVALS ISSUE SL BR BR MOBILE - WATER 0.9-2.1 CANCELLING LOTS LOT 1 ON RP864131 ISO 9 0 0 1
Phone : (07) 3372 9280 ISSUE
CERTIFIED DESIGNER: B.BHUJEL DRAWING: A221869
Unauthorised A 31/01/2023 PRELIMINARY ISSUE BB US EMAIL - STORMWATER N/A LOCAL AUTHORITY NOOSA SHIRE COUNCIL Email : [email protected]
use is prohibited. REV DATE DETAILS DRAWN CHECKED APPRVD SEWERAGE 0.9-2.1 PEGGED? ON REQUEST
Q U A L I T Y
MANAGEMENT
Website : ampflo.com.au ISSUE DATE: 08/03/2023 PROJECT: 221869 SHEET 2 OF 2 D