Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Development Application Part 1 of 2

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Prescribed tidal work - IDAS form 28
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for prescribed tidal work.

You MUST complete ALL questions unless the form indicates otherwise. Inco pig a forms     er sip itho_ut all
necessary information and documentation will result in your application not being a_properly made application----.......
                                                                                                     L "ent Counter
For all development applications you must:
       complete Application details - IDAS form 1
                                                                                      I
•
                                                                                                       23NOV2010
•      complete any other forms relevant to your application

•      provide any mandatory supporting information identified on the forms s being requirel®Wcrpy your
                                                                                                M

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

1. What type of approval is sought?


® development permit

q preliminary approval

2. What is the nature of the prescribed tidal works and the nature of the use? (tick applicable box/es)


                                                   Private use      Non-private use   Estimated value of completed works ($)


q jetty, pier or wharf
q      mooring pile

q     deck or boardwalk                                                               $3000.00

q      boat ramp or spillway

       pontoon

LI revetment, sea.wall or retaining wall
      other - please specify below

3. Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of
the lot are connected to the work and neighbouring lots are not at right angles to the waterway?


       No                 Yes


4. Has a registered professional engineer of Queensland (RPEQ), or an interstate equivalent, certified that the
works comply with the design and safety provisions of the IDAS code for development applications for
prescribed tidal works in the Coastal Protection and Management Regulation 2003, schedule 4A? (non-
mandatory)


q      No           ® Yes - provide details below




    Departtii lit of Infrastructure and Planning                         QPlan
                                                                                                            Queens 1an d
                                                                                                             Government
Log in to download the original file

Development Application Part 1 of 2.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.