Council archive · source document
Attachment 2 - Swept Paths - OPW20-0092 · OPW20/0092
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
Technical Design Note Date 15th September 2020 Title B99 Swept Path Analysis for OPW20/0092 Project 19918 – 38 Avocet Parade PEREGAIN BEACH Lot270 P93113 Client Harbourage Pty Ltd TTE C/‐ RG Strategic As part of OPW 20/0092 Condition 41 regarding car parking, a review of vehicle manoeuvring has been carried out. Please find attached swept path’s for Avocet Parade using a B99 vehicle. Please note that the vehicle clearance zone is very close to the mail boxes (as shown below). It is recommended that the mailboxes be moved further along the frontage to assist. Also, you may wish to consider flaring out the driveway a little between the property boundary and the kerb, just to ensure the wheel to not track on the verge. DWG file has been provided to Zest Architecture for further reviews for OPW. If you require any further information, please don’t hesitate to contact me. Yours faithfully, Dianne Hayes B. Eng (Civil) F.AITPM RPEQ 7086 Attachments – Extract from Swept Paths (1 Page) B99 Swept Path Analysis (3 pages) Hayes Traffic Engineering September 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Swept Paths - OPW20-0092.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.