Skip to the record
Accept no imitations.

Council archive · source document

plans · MCU19/0088.02

of 28

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                               NO WORKS                                    DA
                                                                                                                                                                                                                                                                                                               NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                                           GENERAL NOTES:
                                                                                                                                                                                                                                                                                           (These notes apply to all drawings)

                                                                                                                                                                                                                                                                                           - These designs, drawings and specifications
                                                                                                                                                                                                                                                                                           are copyright and the property of Cayas
                                                                                                                                                                                                                                                                                           Architects and must not be used, reproduced
                                                                                                                                                                                                                                                                                           or copied wholly or in part without the
                                                                                                                                                                                                                                                                                           permission of Cayas Architects.
                                                                                                                                                                                                                                                                                           - Do not scale - use figured dimensions in
                                                                                                                                                                                                                                                                                           preference to scaled dimensions.
                                                                                                                                                                                                                                                                                           - All dimensions must be checked on site prior
                                                                                                                                                                                                                                                                                           to the commencement of construction and/or
                                                                                                                                                                                                                                                                                           manufacture of any item.
                                                                                                                                                                                                                                                                                           - Where demolition work is included, allow to
                                                                                                                                                                                                                                                                                           makegood all affected surfaces.
                                                                                                                                                                                                                                                                                           - Ensure that all conditions of the building
                                                                                                                                                                                                                                                                                           certification are complied with.
                                                                                                                                                                                                                                                                                           Where ambiguities or discrepencies exist,
                                                                                                                                                                                                                                                                                           Cayas Architects shall be contacted for
                                                                                                                                                                                                                                                                                           clarification or it will be deemed that the more
                   A                  B                     17935
                                                                          C          D                               A90.00                      A                       B                                          C                         D                                            expensive option has been allowed.
                                                                                                                                                                                                    17935
                            4805                     6635                     6500                                                                                                                                                                                                         - All work is to comply with all relevant sections
                                                                                                                      2.
                                                                                                                                                              4805                           6635                              6500                                                        of the NCC and/or Austalian Standards.
                                                                                                                                                                                                                                                                                           - These drawings are to be read in conjunction
                                                                                                                                                                                                                                                                                           with all other documentation, schedules &
                                                                                                                                                                     G               H                                                                                                     consultant documentation.
                                                                                                                                                                A30.01              A30.01
                                                                                                                                                                                                                                                                                           The contractor is to allow for all neccessary
                                                                                                                                                                                                                                                                                           floor preperation works.
                                                                                                                                                                                                                                                                                           - Provide all warranties as per the
                                                                                                                                                                                                                                                                                           manufacturers & suppliers standard warranties.
                                                                                                                                                                                                                                                                                           - All materials, equipment, fixtures, fittings, etc.
                                                                                                                                                                                                                                                                                           shall be new first quality without exception.
1                                                                                                                             1                                                                                                                                                            Supply, delivery, storage, installation, etc. is to
                                                                                                                                                                                                                                                                                           be as per the manufacturers most recent
                                                                                                                                                                                                                                                                                           written recommendations.
                                                                                                                                                                                                                                                                                           - Supply & install fire extinguishes to comply
                                                                                                                                                                                                                                                                                           with Australian Standards to the are of the
                                                                                                                                                                                                                                                                                           proposed work.
                                                                                                                                                                                                                                                                                           - Termite Protection is to be provided to
                                                                                                                                                                                                                                                                                           comply with AS 3660.1-2000 and clarification to
            6115




                                                                                                                                          6115
                                                                                                                                                                                                                                                                                           be provided on completion.
                                                                                                                                                                                                                                                                                           - The construction and fit out of commercial
                                                                                                                                                                                                                                                                                           kitchens and bars is to comply with AS 4674-
                                                                                                                                                                                                                                                                                           2004.


                                                                                                                                                                                                                                                                                                             Keynote Legend
2                                                                                                                             2
                                                                                                                                                                                                                                                                                          Key Value Keynote Text

                                                                                                                                                                                                                                                                                          (ex)                  Existing
                                                                                                                                                                                                                                                                                          AP                    Access Panel
                                                                                                                                                                                                                                                                                          COL                   Column
            6115




                                                                                                                                          6115
                                                                                                                                                                                                            (ex.)
                                                                    COL                                                                                                                                     COL
3                                                                                                                             3
    24465




                                                                                                                                  24465
                                                                                         EXISTING MECHANICAL DUCTS                                                                                                                                EXISTING MECHANICAL DUCTS
                                                                                         OVER MEZZANINE                                                                                                                                           OVER MEZZANINE




                       LIQUOR STORE                                                                                                                      LIQUOR STORE
            6115




                                                                                                                                          6115
                           UNDER                                                                                                                             UNDER
                                                                                                                                                                                                                                                  INSTALL NEW SAFETY RAIL TO
                                                                                                                                                                                                                                                  MATCH EXISTING




                                                                                                                                                                                                                                                  EXTEND MEZZANINE
                                                                                                                                                                                                                                                  FLOOR OVER LUNCHROOM
                                                                                                                                                                                                                                                  TO MATCH EXISTING
                                                                                                                                                                                                                                                  MEZZANINE FLOOR




                                                                                                                                                                                                                                        COS
                                                                                                                                                                                                                                 2470
4                                                                                                                             4



                                                                                                                                                                                                                        4255
                                                                                                                                                                             (ex)                                       COS
                                          AP                                                                                                                                 AP
            6115




                                                                                                                                          6115
                                                                                                                                                                                      EXISTING ACCESS
                                               ACCESS HATCH AND
                                                                                                                                                                                      HATCH AND LADDER TO
                                               LADDER TO A/C                                                                                                                                                                                      DASHED LINE INDICATES
                                                                                                                                                                                      A/C PLATFORM
                                               PLATFORM                                                                                                                                                                                           FLOOR EXTENSION ABOVE
                                                                                                                                                                                                                                                  NEW TEAM ROOM




5                                                                                                                             5



                                                                                                                                                                     G               H
                                                                                                                                                                A30.01              A30.01




                        Existing Mezzanine Plan                                                                                                            Proposed Mezzanine Plan                                                                                                           4               Minor Change                      MT 08.02.21
                   1     1 : 100                                                                                                                     2      1 : 100                                                                                                                          3
                                                                                                                                                                                                                                                                                             2
                                                                                                                                                                                                                                                                                                             Amendments
                                                                                                                                                                                                                                                                                                             Amendments
                                                                                                                                                                                                                                                                                                                                               MT 08.09.20
                                                                                                                                                                                                                                                                                                                                               MT 31.07.20
                                                                                                                                                                                                                                                                                             1             Construction Issue                  MT 22.07.20
                                                                                                                                                                                                                                                                                           issue                revision                     initials date


                                                                                                                                                                                                                                                                                                        Cayas
                                                                                                                                                                                                                                                                                            Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                                                       p 07 3356 6100 e [email protected]

                                                                                                                                                                                                                                                                                           client                    ALH Group



                                                                                                                                                                                                                                                                                           project                  Villa Noosa Hotel - Dan
                                                                                                                                                                                                                                                                                                                    Murphy's


                                                                                                                                                                                                                                                                                           drawing title             Existing and Proposed
                                                                                                                                                                                                                                                                                                                     Mezzanine

                                                                                                                                                                                                                                                                                                                   drawn         MT
                                                                                                                                                                                                                                                                                                                   date          03/04/20
                                                                                                                                                                                                                                                                                                                   scale         1 : 100@A1



                                                                                                                                                                                                                                                                                           project no.             drawing number                       issue
                                                                                                                                                                                                                                                                                           1905                    A10.03                                     4

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

plans.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.