Delegated Report - Code - Planning MCU22 0171 [As Published] · MCU22/0171

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                       Car Parking
                 30.    A minimum of 5 car parking spaces must be provided and marked on the site. The works
                        must be undertaken in accordance with an Operational Works approval and must include
                        in particular dimensions, crossfalls and gradients in accordance with Australian Standard
                        AS2890: Parking Facilities.
                       Stormwater Drainage
                 31.    The site must be provided with a stormwater drainage system connecting to a lawful point
                        of discharge. The works must be undertaken in accordance with an Operational Works
                        approval and be generally in accordance with DME Project’s Stormwater Details (Revision
                        C) dated March 2023.
                 32.    A site-specific Dewatering and Acid Sulfate Management Plan must be submitted and
                        accepted by Council prior to the issue of an Operational Works permit. The site-specific
                        Dewatering and Acid Sulfate Management Plan must be prepared by a suitably qualified
                        person and demonstrate how Acid Sulfate affected water encountered during excavation
                        will be treated and disposed of.
                 33.    A clause must be included in any future Community Management Statement that states:
                       a.     the ongoing maintenance of the basement sump is wholly the responsibility of the
                              property owner(s).
                       Services
                 34.    Unless otherwise stipulated by telecommunications legislation at the time of construction,
                        the development must be provided with all necessary conduits, pits and pipes to
                        accommodate the future connection of optic fibre technology telecommunications.
                 35.    Certification must be submitted to Council from all relevant service providers (Energex,
                        NBN and Unitywater) which certifies that the development has met the requirements of this
                        Decision Notice and all applicable legislation at the time of construction.
                       Easements
                 36.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                        infrastructure located on the subject site must be placed within an easement registered
                        against the title of the property.
                 37.    All easements must be designed in accordance with the planning scheme and granted at
                        no cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                        documentation must be in accordance with the Grantee’s standard easement terms. Draft
                        easement documentation must be submitted to Council for endorsement.
                 38.    All works must be kept clear of any existing or proposed easements on the subject land,
                        unless agreed otherwise in writing by the Grantee.
                       Geotechnical Stability
                 39.    All works must be carried out in accordance with a Geotechnical Report (or part thereof)
                        prepared by a qualified person* and endorsed through an Operational Works approval.
                       *(Refer to Advisory Note)
                       Earthworks and Retaining Walls
                 40.    All fill and associated batters must be undertaken in accordance with an Operational Works
                        approval, contained entirely within the subject site unless written permission from the
                        respective landowner(s) is provided to Council and be generally in accordance with DME
                        Project’s Earthworks Sections 1 and 2 (Revision B and C, respectively) dated March 2023.
                 41.    All retaining walls must be designed and constructed in accordance with the planning
                        scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
                        walls that are publicly accessible and exceed 1.0m in height must be fitted with a
                        commercial grade safety fence.

                                                                                                      Page 20 of 22

Document Set ID: 22352422
Version: 7, Version Date: 14/04/2023

Used in these records

About this file

File size
6.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU22 0171 [As Published].pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.