Council archive · source document
Noise Report [As Published] · 132007.2398
RSL Care == Proposed RSL Retirement Village, Cooroy — Road and Rail Noise Assessment >= 4 ROAD TRAFFIC NOISE ASSESSMENT 41 NOISE PREDICTION METHODOLOGY The methodology adopted for the assessment is as required by the Queensland Department of Main Roads (2000) guideline, Road Traffic Noise Management: Code of Practice. As detailed in this procedure, predictions for a 10 year traffic horizon from the proposed completion date of the expansion project were undertaken. For the purposes of the assessment predictions were undertaken in accordance with the methodology described in the United Kingdom, Department of Transport (1988) procedure, Calculation of Road Traffic Noise (CoRTN 88). The noise predictions for the proposed development were completed using the proprietary software package Cadnaa (Computer Aided Noise Abatement Model), developed by DataKustik. The noise modelling involved prediction of potential receptor noise levels at the proposed development utilising the CoRTN method of calculation. The methodology gives consideration to various elements of the road design including traffic flows, traffic vehicle composition, road gradient, acoustic shielding by other buildings, and road surface type. The method predicts Lajo,18 nour Noise levels which are the noise levels exceeded 10 % of the time between the hours of 6 am and midnight. The road surface type utilised in the predictions was a 10 mm chip seal (3.0 dB(A) correction) for the Cooroy Connection Road. A photograph showing the road surface is presented on Plate 2 in Appendix C. 4.2 POTENTIALLY IMPACTED RECEPTORS Hypothetical receptor positions with a potential to be impacted by noise from road traffic were selected from current plans of the proposed development as shown on Figure 2. Receptors were placed at worst-case locations for the ILU lots and other proposed buildings (village centre, care facility and two-storey apartments). A total of 101 receptors have been modelled. 4.3 TRAFFIC DATA The Queensland Department of Main Roads has provided 2006 traffic data for the Cooroy Connection Road, north of Pearsons Road. The 2005-2006 growth rate for the Cooroy Connection Road is 5.35 %. This growth rate has been applied to predict 2007 and 2018 AADT counts. Table 4.1 presents a summary of the traffic data used for the assessment. TABLE 4.1: AADT DAILY PREDICTED TRAFFIC VOLUMES Year Cooroy Connection Road % Heavy Vehicles AADT 2006 10 6,180 2007 10 6,511 2018 10 11,554 AIR NOISE ENVIRONMENT PTY LTD P:\1750\REPORTING\1750FINAL.DOC Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Noise Report [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.