Change Representations - CYC 2025
Condition 96 & 97 – External Works – Kabi-Cootharaba Intersection
96. The existing intersection joining Cootharaba Road with Kabi Road must be
upgraded to include a sealed Basic Right Turn Treatment. The works must
be undertaken in accordance with an Operational Works approval, be
generally in accordance with section 7.2 of Austroads’ A Guide to Road
Design Part 4A, sections 5, 6 and 8 of BMC Traffic’s Traffic Engineering
Assessment Report (Doc ID: 22354477) dated 22 March 2023, The Noosa Plan
2020 – PSP6 Engineering Design Standards, and include, but not be limited
to:
a. a design prepared by a suitably qualified person (RPEQ);
b. so that no part of the rigid vehicles exits the traffic lane(s); and
c. widening of Kabi Road in accordance with Condition 97
97. Kabi Road must be upgraded for the full length of the road (i.e., between 59
Kabi Road and Cootharaba Road). The works must be undertaken in
accordance with an Operational Works approval, be generally in accordance
with Austroads’ A Guide to Road Design Part 3, sections 5, 6 and 8 of BMC
Traffic’s Traffic Engineering Assessment Report (Doc ID: 22354477) dated 22
March 2023, The Noosa Plan 2020 – PSP6 Engineering Design Standards,
and include, but not be limited to:
a. a design prepared by a suitably qualified person (RPEQ)
b. a combined traffic lane width of 6.2m (2 x 3.1m);
c. a shoulder width of 1.0m (with a minimum shoulder sealed
width of 0.5m);
d. a pavement design suitable to cater for heavy vehicles (i.e.,
rigid vehicles, buses, etc.);
e. all associated drainage infrastructure (i.e., table drain, culvert,
etc.);
f. the continuation of the existing stormwater box culvert to allow
for the require carriageway width;
g. considerations to the existing residential driveway crossovers;
and
h. a sealed turnaround facility sufficiently sized to accommodate
a 3-point turn manoeuvre of a heavy rigid vehicle (HRV) located
at the end of the road.
Please find attached traffic addendum seeking changes to this condition to reflect the
existing road conditions, nature and scale of the development
Condition 98 – fire trail
98. The development site must be provided with an Emergency Bushfire
Evacuation Route connecting to Council’s “Road 176”. The emergency route
is to be used for emergencies only and is not to be used for deliveries or
general access. The works must be undertaken in accordance with an
Operational Works approval and Section 5.5 of North Coast Environmental
Services’ Bushfire Hazard Assessment and Management Plan (J001061, v.4)
dated 11 September 2024, and include, but not be limited to:
a. a design prepared by a suitably qualified person (RPEQ) that is
to an acceptable standard to cater for a HRV, 14.5m rigid
vehicle (i.e., bus) and appropriate firefighting appliances;
b. a design that allows for unbroken access for a HRV, 14.5m rigid
vehicle (i.e., bus) and appropriate fire-fighting appliances
through the site (i.e., from “Road 176” to all parking and
manoeuvring areas and through to Kabi Road);
c. a design that includes passing bays and turning areas;
d. the emergency route, all internal roads and associated
manoeuvring areas must not exceed a gradient of 12.5%;
See the original