A Little Birdie - 287 Gympie Terrace - Cover Letter 190716
Attached to the e-mail MCU16/0088 Development Application- 3/287 Gympie Terrace, Noosaville.
NOTE - CONSTRUCTION:
APPLIANCE QUANTITIES PLUMBING FIXTURE QUANTITIES PLUMBING CONNECTION POINT QUANTITIES PLUMBING FABRICATION ITEM QUANTITIES
ALL CONSTRUCTION SHALL COMPLY WITH
THE BCA / NCC VOLUME 1 FOR CLASS 2-9 QTY Type Mark DESCRIPTION QTY MARK DESCRIPTION QTY DESCRIPTION QTY MARK DESCRIPTION
BUILDINGS
1 RNG 4 X BURNER GAS RANGE W/OVEN 1 CLNR CLEANER SINK W/ GRATE 2 COLD WATER POINT 1 DIP S/S DIPPER WELL - 250 X 250 X 300 DROP
ALL DETAILS TO BE READ IN CONJUNCTION 2 400W - DEEP FRYER - TWIN - FRYMASTER 1 HB HAND BASIN - PORCELAIN - WALL MOUNT 7 COLD WATER POINT - WALL 2 HB S/S SINK IN BENCH - 300 X 300 X 200 DROP
WITH SPECIFICATION, ARCHITECTURAL 1 GRD 600 GAS GRIDDLE W/FRIDGE DRAWERS 1 HB HAND BASIN - WALL MOUNTED - COVERED WASTE 1 FLOOR WASTE GULLY 3 SNK S/S SINK IN BENCH - 350 X 350 X 300 DROP
DRAWINGS, SCHEDULES & CONSULTANT 1 GRL 600 GAS GRILL W/FRIDGE DRAWERS 1 HB HIDE - WALL MOUNT HAND BASIN W/ MIXER 7 HOT WATER POINT - WALL 1 SNK S/S SINK IN BENCH - 400 X 450 X 300 DROP
DRAWINGS 2 EA08A BLENDER - VITAMIX VITA-PREP 3 1 JRNS COFFEE JUG RINSER W/ DRIP TRAY 8 TUNDISH POINT
1 TST BUN TOASTER - WALL MOUNT 4 MXR FLICK MIXER - LEVER TYPE - HAND BASIN 2 WASTE POINT - FLOOR
BUILDER TO CONFIRM THE SET OUT AND
ALL LEVELS AND DIMENSIONS ON SITE 2 GRND COFFEE GRINDER W/ HOPPER 3 MXR FLICK MIXER - LEVER TYPE - SINK 5 WASTE POINT - WALL
PRIOR TO THE COMMENCEMENT OF THE 1 ESP COFFEE MACHINE - 3 GROUP - LA MARZOCCO GB5 1 P-WC TOILET PAN - PWD
BUILDING WORKS 1 COMBI OVEN W/RACK STAND - HOUNO CPES1.10 1 SPRY PRE-RINSE SPRAY ARM
1 D/W DISHWASHER - PASS THROUGH - WASHTEC XP - IN-LINE
ALL SIZES TO BE CONFIRMED ON SITE
1 GLASSWASHER - U/B - WASHTEC GM
PRIOR TO THE FABRICATION OF ANY ITEM
BUILT 'OFF SITE' 3 LMP HEAT LAMP - PULL DOWN
1 DIP ICE CREAM DIPPING CABINET - 1500W
THE SIZES AND SPECIFICATIONS OF ALL 1 M/W MICROWAVE - MENUMASTER RCS511TS HYDRAULICS / GAS LEGEND:
EQUIPMENT TO BE CONFIRMED BY 1 SWCH FRG PREP FRIDGE - GREENLINE - GLSA3D18 - 3 DOOR
ELECTRICIAN, PLUMBER, JOINER AND FLOOR WASTE GULLY
2 H/PNY ROTISSERIE OVEN - HENNY PENNY - SCR6 FWG
BUILDER
1 UB FRZ U/B FREEZER - HOSHIZAKI FTE-170SDA-GN - 3 SOLID DOOR - L/H COND
W WASTE POINT - FLOOR
2 18 UB FRG U/B FRIDGE - 3 GLAZED DOOR - 1800W X 650D X 850H
1 12 U/B FRG U/B FRIDGE - HOSHIZAKI RTE-120SDA-GN - 2 SOLID DOOR - L/H COND W TN TUNDISH WASTE
NOTE - SLAB CHASING / TRENCHING:
CONTRACTOR TO LIASE WITH CENTRE 2 ICE U/B ICE MACHINE - HOSHIZAKI KM-50A
OPERATIONS MANAGER FOR APPROVAL 1 FRZ UPRIGHT FREEZER - GREENLINE GLKF1S-574 - 1 SOLID DOOR
T TRADE WASTE POINT - FLOOR
OF CHASING OR TRENCHING TO SLAB 1 WRMR WARMING OVEN - HENNY PENNY R WASTE RISER
W WASTE CONNECTION - WALL
NOTE - SUBSTITUTION:
SUBSTITUTION OF CONSTRUCTION T
TRADE WASTE CONNECTION - WALL
METHODS, PRODUCTS, MATERIALS
AND/OR FINISHES WILL BE CONSIDERED H HOT WATER OUTLET
ONLY IF DOCUMENTATION EXPLAINING REV DESCRIPTION DATE ISSUED
THE SPECIFICATIONS OF THE PROPOSED H
C C COLD WATER OUTLET
SUBSTITUTION ARE SUBMITTED TO THE W CLIENT:
DESIGNER FOR APPROVAL, REGARDLESS MXR H HOT WATER OUTLET - WALL MATTHEW GEORGE - TWX PTY LTD
OF WHETHER THE DETAIL SPECIFIED BY BACKFLOW PREVENTION DIP
THE DESIGNER IS UNACHIEVABLE TN W HB C
C COLD WATER OUTLET - WALL PROJECT:
DEVICE REQUIRED FOR JRNS
W
C H A LITTLE BIRDIE
JUG RINSER
FAILURE TO GAIN APPROVAL BEFORE TN W MXR C
G GAS OUTLET - FLOOR ADDRESS:
SUBSTITUTION COULD RESULT IN THE C ESP
'OFFSHORE' COMPLEX
RECTIFICATION OF THE SUPPLIED G
GAS OUTLET - WALL T3 / 287 GYMPIE TERRACE
PRODUCT OR WORKS AT THE BUILDER'S NOOSAVILLE, QLD 4566
EXPENSE EXISTING TUNDISH TO BE NOTE:
W RELOCATED TO ALLOW REFER TO EQUIPMENT SCHEDULE FOR DRAWING TITLE:
EXTENSION OF EXISTING HYDRAULICS / GAS LAYOUT
C
WATER / GAS CONNECTION DETAILS
H
DISHWASHER / COLDROOM
SNK
NOTE - EQUIPMENT DETAILS: GLASSWASHER CHEMICALS DRAWING NO: JOB NO:
WATER, WASTE, GAS AND ELECTRICAL TO BE DIRECT CONNECTED H SPRY
W ? WD.24 Q1609
REQUIREMENTS OF ALL ITEMS OF TO APPLIANCES D/W
EQUIPMENT TO BE CONFIRMED WITH THE SCALE AT A3: DRAWN:
EQUIPMENT SUPPLIER(S) PRIOR TO NEW FLOOR WASTE TO W FWG
INSTALLATION OF GAS, PLUMBING AND CONNECT TO EXISTING LINE H As indicated KBC
ELECTRICAL SERVICES
ISSUED FOR: ISSUE DATE:
W TN TENDER 22/06/16
NOTE - PLUMBING CONNECTIONS: REVISION: REVISED DATE:
FWG FWG
ALL WATER, WASTE AND GAS
CONNECTIONS TO BE CHECKED AGAINST
EQUIPMENT / FIXTURE MANUF. DETAILS
FWG NOTES
PRIOR TO SLAB TRENCHING, CORE HOLE
ABE
MC MAINS
DRILLING AND/OR PLUMBING WORK CHECK ALL DIMENSIONS AND LEVELS ON SITE
COMMENCEMENT HB P-WC BEFORE CONSTRUCTION.
GRD
TN W GRL HB DO NOT SCALE OFF DRAWINGS. NOMINATED
MXR DIMENSIONS TAKE PRECEDENCE OVER SCALE.
W
C
H
NOTE - PLUMBING FIXTURES: SNK RNG ALL CONSTRUCTION AND MATERIALS IN STRICT
ALL PLUMBING FIXTURES MUST BE HB ACCORDANCE WITH THE BCA / NCC, LOCAL
MXR
TN W
IO/SL
CLNR AUTHORITIES AND ALL RELATIVE REGULATIONS AND
'WATERMARK' CERTIFIED TO COMPLY FWG
TN W STANDARDS.
WITH NCC VOLUME 3 APPROXIMATE
TN W
ICE W
TN W FWG
LOCATION OF ICE © 2016 CAB ROTO. ALL RIGHTS RESERVED. NO PART
GIT OF THIS DOCUMENT MAY BE REPRODUCED IN ANY
W
H
C
C
H
C
H
C W
FORM OR BY ANY MEANS WITHOUT THE WRITTEN
PERMISSION OF CAB ROTO.
COMBI STEAM OVEN TBC MULTI CHEMICAL DISPENSER CONNECTED QBCC LICENCE
SNK MXR TO CLEANER SINK HOT AND COLD TAPS - 1284073
GAS APPLIANCES TBC PLUMBER TO LIAISE WITH CHEMICAL
SUPPLIER PRIOR TO SUPPLYING FIXTURES
RETAIN FITTING FOR FUTURE WASHING
MACHINE CONNECTION
HYDRAULICS / GAS LAYOUT
1 1 : 100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.