Skip to the record
Beware of cheap imitations.

Original source · versioned page text

A Little Birdie - 287 Gympie Terrace - Cover Letter 190716

Attached to the e-mail MCU16/0088 Development Application- 3/287 Gympie Terrace, Noosaville.

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

NOTE - CONSTRUCTION:
                                                                           APPLIANCE QUANTITIES                                                                                PLUMBING FIXTURE QUANTITIES                         PLUMBING CONNECTION POINT QUANTITIES                                      PLUMBING FABRICATION ITEM QUANTITIES
ALL CONSTRUCTION SHALL COMPLY WITH
THE BCA / NCC VOLUME 1 FOR CLASS 2-9        QTY     Type Mark                             DESCRIPTION                                                     QTY        MARK                        DESCRIPTION                QTY                      DESCRIPTION                                    QTY    MARK                     DESCRIPTION
BUILDINGS
                                             1         RNG     4 X BURNER GAS RANGE W/OVEN                                                                 1         CLNR      CLEANER SINK W/ GRATE                         2      COLD WATER POINT                                                 1      DIP   S/S DIPPER WELL - 250 X 250 X 300 DROP
ALL DETAILS TO BE READ IN CONJUNCTION        2                 400W - DEEP FRYER - TWIN - FRYMASTER                                                        1          HB       HAND BASIN - PORCELAIN - WALL MOUNT           7      COLD WATER POINT - WALL                                          2       HB   S/S SINK IN BENCH - 300 X 300 X 200 DROP
WITH SPECIFICATION, ARCHITECTURAL            1         GRD     600 GAS GRIDDLE W/FRIDGE DRAWERS                                                            1          HB       HAND BASIN - WALL MOUNTED - COVERED WASTE     1      FLOOR WASTE GULLY                                                3      SNK   S/S SINK IN BENCH - 350 X 350 X 300 DROP
DRAWINGS, SCHEDULES & CONSULTANT             1         GRL     600 GAS GRILL W/FRIDGE DRAWERS                                                              1          HB       HIDE - WALL MOUNT HAND BASIN W/ MIXER         7      HOT WATER POINT - WALL                                           1      SNK   S/S SINK IN BENCH - 400 X 450 X 300 DROP
DRAWINGS                                     2        EA08A    BLENDER - VITAMIX VITA-PREP 3                                                               1         JRNS      COFFEE JUG RINSER W/ DRIP TRAY                8      TUNDISH POINT
                                             1          TST    BUN TOASTER - WALL MOUNT                                                                    4         MXR       FLICK MIXER - LEVER TYPE - HAND BASIN         2      WASTE POINT - FLOOR
BUILDER TO CONFIRM THE SET OUT AND
ALL LEVELS AND DIMENSIONS ON SITE            2        GRND     COFFEE GRINDER W/ HOPPER                                                                    3         MXR       FLICK MIXER - LEVER TYPE - SINK               5      WASTE POINT - WALL
PRIOR TO THE COMMENCEMENT OF THE             1         ESP     COFFEE MACHINE - 3 GROUP - LA MARZOCCO GB5                                                  1         P-WC      TOILET PAN - PWD
BUILDING WORKS                               1                 COMBI OVEN W/RACK STAND - HOUNO CPES1.10                                                    1         SPRY      PRE-RINSE SPRAY ARM
                                             1          D/W    DISHWASHER - PASS THROUGH - WASHTEC XP - IN-LINE
ALL SIZES TO BE CONFIRMED ON SITE
                                             1                 GLASSWASHER - U/B - WASHTEC GM
PRIOR TO THE FABRICATION OF ANY ITEM
BUILT 'OFF SITE'                             3         LMP     HEAT LAMP - PULL DOWN
                                             1          DIP    ICE CREAM DIPPING CABINET - 1500W
THE SIZES AND SPECIFICATIONS OF ALL          1         M/W     MICROWAVE - MENUMASTER RCS511TS                                                                                                                                                HYDRAULICS / GAS LEGEND:
EQUIPMENT TO BE CONFIRMED BY                 1      SWCH FRG PREP FRIDGE - GREENLINE - GLSA3D18 - 3 DOOR
ELECTRICIAN, PLUMBER, JOINER AND                                                                                                                                                                                                                             FLOOR WASTE GULLY
                                             2        H/PNY    ROTISSERIE OVEN - HENNY PENNY - SCR6                                                                                                                                                    FWG
BUILDER
                                             1        UB FRZ U/B FREEZER - HOSHIZAKI FTE-170SDA-GN - 3 SOLID DOOR - L/H COND
                                                                                                                                                                                                                                              W              WASTE POINT - FLOOR
                                             2      18 UB FRG U/B FRIDGE - 3 GLAZED DOOR - 1800W X 650D X 850H
                                             1      12 U/B FRG U/B FRIDGE - HOSHIZAKI RTE-120SDA-GN - 2 SOLID DOOR - L/H COND                                                                                                                 W TN           TUNDISH WASTE
NOTE - SLAB CHASING / TRENCHING:
CONTRACTOR TO LIASE WITH CENTRE              2          ICE    U/B ICE MACHINE - HOSHIZAKI KM-50A
OPERATIONS MANAGER FOR APPROVAL              1          FRZ    UPRIGHT FREEZER - GREENLINE GLKF1S-574 - 1 SOLID DOOR
                                                                                                                                                                                                                                              T              TRADE WASTE POINT - FLOOR
OF CHASING OR TRENCHING TO SLAB              1        WRMR     WARMING OVEN - HENNY PENNY                                                                                                                                                     R              WASTE RISER

                                                                                                                                                                                                                                                  W          WASTE CONNECTION - WALL
NOTE - SUBSTITUTION:
SUBSTITUTION OF CONSTRUCTION                                                                                                                                                                                                                       T
                                                                                                                                                                                                                                                             TRADE WASTE CONNECTION - WALL
METHODS, PRODUCTS, MATERIALS
AND/OR FINISHES WILL BE CONSIDERED                                                                                                                                                                                                                H          HOT WATER OUTLET
ONLY IF DOCUMENTATION EXPLAINING                                                                                                                                                                                                                                                                                             REV DESCRIPTION                DATE       ISSUED
THE SPECIFICATIONS OF THE PROPOSED                                                                                    H
                                                                                                                       C                                                                                                                          C          COLD WATER OUTLET
SUBSTITUTION ARE SUBMITTED TO THE                                                                                 W                                                                                                                                                                                                          CLIENT:
DESIGNER FOR APPROVAL, REGARDLESS                                                            MXR                                                                                                                                                  H          HOT WATER OUTLET - WALL                                         MATTHEW GEORGE - TWX PTY LTD
OF WHETHER THE DETAIL SPECIFIED BY                BACKFLOW PREVENTION                        DIP
THE DESIGNER IS UNACHIEVABLE                                                       TN W      HB               C
                                                                                                                                                                                                                                                  C          COLD WATER OUTLET - WALL                                        PROJECT:
                                                  DEVICE REQUIRED FOR                         JRNS
                                                                                                          W
                                                                                      C               H                                                                                                                                                                                                                      A LITTLE BIRDIE
                                                  JUG RINSER
FAILURE TO GAIN APPROVAL BEFORE                                                    TN W      MXR     C
                                                                                                                                                                                                                                                  G          GAS OUTLET - FLOOR                                              ADDRESS:
SUBSTITUTION COULD RESULT IN THE                                                      C       ESP
                                                                                                                                                                                                                                                                                                                             'OFFSHORE' COMPLEX
RECTIFICATION OF THE SUPPLIED                                                                                                                                                                                                                     G
                                                                                                                                                                                                                                                             GAS OUTLET - WALL                                               T3 / 287 GYMPIE TERRACE
PRODUCT OR WORKS AT THE BUILDER'S                                                                                                                                                                                                                                                                                            NOOSAVILLE, QLD 4566
EXPENSE                                                                                                                                                                                            EXISTING TUNDISH TO BE                     NOTE:
                                                                                                                            W                                                                      RELOCATED TO ALLOW                         REFER TO EQUIPMENT SCHEDULE FOR                                                DRAWING TITLE:
                                                                                                                                                                                                   EXTENSION OF EXISTING                                                                                                     HYDRAULICS / GAS LAYOUT
                                                                                                                             C


                                                                                                                                                                                                                                              WATER / GAS CONNECTION DETAILS
                                                                                                                              H




                                                  DISHWASHER /                                                                                                                                     COLDROOM
                                                                                                                                                       SNK
NOTE - EQUIPMENT DETAILS:                         GLASSWASHER CHEMICALS                                                                                                                                                                                                                                                      DRAWING NO:                  JOB NO:
WATER, WASTE, GAS AND ELECTRICAL                  TO BE DIRECT CONNECTED                                                             H                 SPRY
                                                                                                                                 W                      ?                                                                                                                                                                    WD.24                        Q1609
REQUIREMENTS OF ALL ITEMS OF                      TO APPLIANCES                                                                                        D/W
EQUIPMENT TO BE CONFIRMED WITH THE                                                                                                                                                                                                                                                                                           SCALE AT A3:                 DRAWN:
EQUIPMENT SUPPLIER(S) PRIOR TO                    NEW FLOOR WASTE TO                                                                     W               FWG
INSTALLATION OF GAS, PLUMBING AND                 CONNECT TO EXISTING LINE                                                                    H                                                                                                                                                                              As indicated                 KBC
ELECTRICAL SERVICES
                                                                                                                                                                                                                                                                                                                             ISSUED FOR:                  ISSUE DATE:
                                                                                                                                                                        W TN                                                                                                                                                 TENDER                       22/06/16

NOTE - PLUMBING CONNECTIONS:                                                                                                                                                                                                                                                                                                 REVISION:                    REVISED DATE:
                                                                                                                                                                                                                                             FWG              FWG
ALL WATER, WASTE AND GAS
CONNECTIONS TO BE CHECKED AGAINST
EQUIPMENT / FIXTURE MANUF. DETAILS
                                                                                                                                                                                                                                                              FWG                                                            NOTES
PRIOR TO SLAB TRENCHING, CORE HOLE
                                                                                                                                             ABE




                                                                                                                                                                                                                                  MC MAINS
DRILLING AND/OR PLUMBING WORK                                                                                                                                                                                                                                                                                                CHECK ALL DIMENSIONS AND LEVELS ON SITE
COMMENCEMENT                                                                                                                                            HB                                                                                                   P-WC                                                            BEFORE CONSTRUCTION.
                                                                                                                                                                      GRD
                                                                                                  TN W                                                                GRL                                                                                    HB                                                              DO NOT SCALE OFF DRAWINGS. NOMINATED
                                                                                                                  MXR                                                                                                                                                                                                        DIMENSIONS TAKE PRECEDENCE OVER SCALE.




                                                                                                                                                                                                                                                                     W

                                                                                                                                                                                                                                                                         C
                                                                                                                                                                                                                                                                         H
NOTE - PLUMBING FIXTURES:                                                                                         SNK                                                   RNG                                                                                                                                                  ALL CONSTRUCTION AND MATERIALS IN STRICT
ALL PLUMBING FIXTURES MUST BE                                                                                     HB                                                                                                                                                                                                         ACCORDANCE WITH THE BCA / NCC, LOCAL
                                                                                                                  MXR
                                                                                                                                 TN W
                                                                                                                                                                       IO/SL
                                                                                                                                                                                                                                     CLNR                                                                                    AUTHORITIES AND ALL RELATIVE REGULATIONS AND
'WATERMARK' CERTIFIED TO COMPLY                                                                                                                                FWG
                                                                                                                                  TN W                                                                                                                                                                                       STANDARDS.
WITH NCC VOLUME 3                                                        APPROXIMATE
                                                                                                     TN W
                                                                                                                           ICE                     W
                                                                                                                                                                                             TN W                                                  FWG
                                                                         LOCATION OF                                       ICE                                                                                                                                                                                               © 2016 CAB ROTO. ALL RIGHTS RESERVED. NO PART
                                                                             GIT                                                                                                                                                                                                                                             OF THIS DOCUMENT MAY BE REPRODUCED IN ANY
                                                                                                                                                                     W
                                                                                                                                                                     H
                                                                                                                                                                     C




                                                                                                                                                                                                                                             C
                                                                                                                                                                                                                                             H
                                                                                                                                                                                                                                                       C
                                                                                                                                                                                                                                                       H
                                                                                                                                                                                               C                                         W
                                                                                                                                                                                                                                                                                                                             FORM OR BY ANY MEANS WITHOUT THE WRITTEN
                                                                                                                                                                                                                                                                                                                             PERMISSION OF CAB ROTO.

                                                                                                                                                                                                   COMBI STEAM OVEN TBC                                             MULTI CHEMICAL DISPENSER CONNECTED                                                      QBCC LICENCE
                                                                                                                                                                SNK    MXR                                                                                          TO CLEANER SINK HOT AND COLD TAPS -                                                           1284073
                                                                                                                                                                                                   GAS APPLIANCES TBC                                               PLUMBER TO LIAISE WITH CHEMICAL
                                                                                                                                                                                                                                                                    SUPPLIER PRIOR TO SUPPLYING FIXTURES

                                                                                                                                                                                                                                                                    RETAIN FITTING FOR FUTURE WASHING
                                                                                                                                                                                                                                                                    MACHINE CONNECTION

                                                  HYDRAULICS / GAS LAYOUT
                                        1         1 : 100
Log in to download the original file

A Little Birdie - 287 Gympie Terrace - Cover Letter 190716.pdf · 5.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.