20210041 Bottlebrush Ave Op Works
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
OP WORKS
ISSUE
RESIDENTIAL UNIT DEVELOPMENT
NOOSA HEADS
27 BOTTLEBRUSH AVENUE, NOOSA HEADS, QLD 4567
Lot 138 RP 88934
CIVIL WORKS
NOTE: VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS,
THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A WORKS CAN COMMENCE.
MINIMUM OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE 12. CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS
CONTRACTOR FAIL TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS OTHERWISE
ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
RESPONSIBLE FOR ALL COSTS TO ALLOW FOR THE WORKS TO BE INSPECTED TO THE
13. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS.
SATISFACTION OF RECOR. ANY INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH
14. CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
ALL REINSPECTION COSTS TO BE PAID BY THE CONTRACTOR. OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION.
a. PRESTART 15. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS
b. EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION COMMENCING ON SITE.
CONTROL MEASURES UNSUITABLE GROUND 16. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND
c. SIDE AND CUT OFF DRAINS SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
d. STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL 17. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
e. STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT
18. CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE
f. STORMWATER STRUCTURE BASE SLABS APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS
g. SEWER RETICULATION AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE
TE
h. WATER RETICULATION OR REMOVE FROM SITE AS DIRECTED. SI
C T
i. PAVEMENT SUBGRADE 19. DRAWINGS TO BE READ IN CONJUNCTION WITH THE FOLLOWING
BJE
j. PAVEMENT REINFORCING CONSULTANTS/CONTRACTORS DRAWINGS: SU
SURVEYOR: SKYLINE SURVEYORS SITE BOUNDARY
k. PAVEMENT PRIOR TO SEALING (PRESEAL)
l. RETAINING WALL FOOTING REINFORCING ARCHITECT: ZEST BUILDING GROUP
m. RETAINING WALL BLOCKWORK PRIOR TO CORE FILL HYDRAULICS: TBC
n. STEEL REINFORCEMENT OF CONCRETE STRUCTURES STRUCTURAL: RECOR
o. PRACTICAL COMPLETION LANDSCAPE: ZEST BUILDING DESIGN
p. ON MAINTENANCE 20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD
OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL
q. OFF MAINTENANCE ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH
r. ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT IMPLEMENTATION OF THE TMP.
APPROVAL) 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY APPROVALS
s. ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE RELEVANT TO THEIR RECEIVED FOR THE PROJECT AND IN ACCORDANCE WITH OPW APPROVALS BY COUNCIL.
CERTIFICATION SCHEME 22. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY WITHOUT
FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT 25/02/2022
LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.
GENERAL NOTES EA ID: 2557785
23. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND RPEQ: 26443
1. ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN. APPROVALS ON SITE AT ALL TIMES.
2. ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR DO NOT SCALE, IF IN DOUBT ASK!
24. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE
TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS. WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013).
3. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND
WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA
SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES, LOCALITY PLAN
ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
NOT TO SCALE
4. SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE
TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY
B 22/02/22 UPDATE FOR RFI BRP NW
ADDITIONAL COSTS INCURRED BY RECOR.
A 01/12/21 ISSUED FOR OPW BRP MVP
5. EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR Rev Date Description By Chk
ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE
PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND
LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY
DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO
LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.
6. THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL
CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS [email protected]
INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF 37 MARY ST NOOSAVILLE, QLD
CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR
07 5211 1003
AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.
Client
7. ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE NOVATO GROUP
RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS, Project Name
GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS. 27 BOTTLEBRUSH AVE
8. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO NOOSA HEADS
AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE
CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE
OWNER/MANAGER / AUTHORITY/COUNCIL. Title
COVER SHEET
9. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE
HEALTH AND SAFETY REQUIREMENTS.
10. WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY TO
NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY
OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW Project No. Discipline Status
20210041 CIVIL OPW
Designed By Drawn By Scale
(at
BRP BRP NTS A1)
Drawing No. Revision
C00 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 4 (of 10)
Section 2
OP WORKS
W
S
ISSUE
T
S
W
S
T
S
W
S
T
S
EXISTING SEWER AND WATER
SERVICES TO BE DISCONNECTED AND
CP
BUP13648
W
S
CAPPED OFF DURING CONSTRUCTION
T
EXISTING DRIVEWAY AND CARPORT TO BE
DEMOLISHED AND REMOVED FROM SITE
W
S
S
EXISTING TREES TO BE REMOVED,
MULCHED AND DISPOSED OF OFF-SITE
*Sewer line plotted from records*
T
S S S S S S S S S S S S S
S
S
31.29
W
SEWER MANHOLE
N
S
30.26
SEWER MANHOLE
T
30.68 31.75
S
//
S
33.67
Block Wall Timber Fence
//
W
//
WMPP
// // // // // // // // //
// // // // //
// // // // // // // // // // // // // // // // // // // // //
//
// // // // //
34.38
//
TELE PIT
//
35.00
Grade Change
S
Concrete Driveway
//
32.63
S
bottlebrush avenue
//
T
34.5
W
Carport
33.5
35
32.5
34
30.5
31.5
29.5
33
29.5
32
30
31
//
//
Timber Sleeper Retaining Wall
35.02
//
S *Sewer line plotted from
//
S
T
//
35.11
W
Rock Retaining Wall
//
Block Retaining Wall
30.75 35.31
//
Paving Timber Sleeper Retaining Wall
Timber Sleeper Re
Concrete
138
Floor Level
//
S
//
Concrete
S
T
Rock Retaining Wall
//
W
*
//
Line Single Storey Building 127
Timber Sleeper Retaining Wall
RP88934
l
//
31.70
rica
//
t RP88934
S
lec
//
S
30.93
T
E
Shed
d IL 2
//
W
ea 3
8.29 SW 00∅ RC
SI
33.69
records*
h
//
r
GN
e ta
*Ov P
//
ining Wall
//
SW
Electrical Line*
S
*Overhead 35.13
//
T
S
34.37 35.11
PP
//
Timber Fence
W
35.08
//
32.05 33.46
//
29.68 30.99
//
SW GRATE Concrete
//
S
30.5
33 33.93
T
3
31.5
*Pit IL 28.70*
30
S31
34.41
32.5
32.59 3
//
31
32
.5
34
34
35
W
//
36.
34.99
36
.5
//
5
//
// // Section 3
//
// // // // // // // // // // // // // // // // // // // // // // // // //
// // // // // //
//
// // // // // // // // // // // // // //
//
Timber Fence
// // // // //
//
// // // // // // // // // // // // // // // //
30.98 35.85
Kerb and Channel
S
*Telstra/NBN line plotted from records*
*Water Main line plotted from records*
W
REMOVE AND DISPOSE OF
*Sewer line plotted from records*
25/02/2022
S
T
RETAINING WALLS AND REINSTATE REMOVE AND DISPOSE OF
RETAINING WALLS
SURFACE TO MATCH NATURAL EXISTING WALLS, BUILDING, 1
EA ID: 2557785
RPEQ: 26443
S
EXISTING ELECTRICAL CONNECTION CARPORT, SHED AND PAVED GTP2033
W
TO BE REMOVED. REMOVAL AND AREAS TO BE DEMOLISHED AND DO NOT SCALE, IF IN DOUBT ASK!
T
S
REPLACEMENT TO BE ARRANGED REMOVED FROM SITE
CP BY SITE SUPERINTENDANT
GTP2033
S
W
T
S
S
W
T
B 22/02/22 UPDATE FOR RFI BRP NW
A 01/12/21 ISSUED FOR OPW BRP MVP
S
Rev Date Description By Chk
S T
W
S
S T
[email protected]
S
37 MARY ST NOOSAVILLE, QLD
07 5211 1003
Client
NOVATO GROUP
S
NOTE: Project Name
NOTE: 6. ALL VEGETATION WITHIN THE LIMIT OF WORKS TO BE CLEARED, MULCHED AND REMOVED 27 BOTTLEBRUSH AVE
FROM SITE IN ACCORDANCE WITH APPROVED VEGETATION CLEARING PLAN (BY OTHERS) OR EXCEPT WHERE NOTED ON PLAN AND ASSOCIATED DESIGN DRAWINGS, ALL
1. FOR GENERAL NOTES REFER DWG No. C00, WHICH IS TO BE REQUESTED AND VIEWED PRIOR IF SCHEDULED STOCKPILE FOR USE BY LANDSCAPER. IN-GROUND SERVICES WITHIN THE PROPERTY BOUNDARY INCLUDING BUT NOT NOOSA HEADS
S
TO COMMENCEMENT OF CONSTRUCTION IF NOT SUPPLIED.
S
LIMITED TO: STORMWATER DRAINAGE, SEWERAGE, WATER, GAS, ELECTRICAL
7. CONTRACTOR TO LOCATE ALL EXISTING UTILITIES ON SITE AND MAKE SUITABLE AND COMMUNICATIONS TO BE SAFELY BE DISCONNECTED, REMOVED FROM
2. THE CONTRACTOR WILL MAKE HIMSELF FULLY AWARE OF THE EXISTING FEATURES OF THIS ARRANGEMENTS TO HAVE DISCONNECTED PRIOR TO DEMOLITION WORKS BEGINNING. SITE AND CAPPED OFF AT SITE BOUNDARY. CONTRACTOR TO ARRANGE ALL Title
SITE AND ENSURE ANY ADDITIONAL WORKS NOT SHOWN ON THIS PLAN ARE INCLUDED IN THE NECESSARY APPLICATIONS AND PERMITS WITH THE RELEVANT AUTHORITIES. EXISTING SITE LAYOUT
CONTRACT. 8. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE SERVICES TO BE CAPPED IN ACCORDANCE WITH RELEVANT SERVICE
CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT WORKS PROVIDER SPECIFICATIONS AND STANDARD DETAILS
S
S
3. LOCATION AND DEPTH OF EXISTING SERVICES BASED ON SURVEY, DBYD AND COUNCIL CAN COMMENCE.
RECORDS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM ACTUAL LOCATION AND
DEPTH PRIOR TO CARRYING OUT ANY EXCAVATION OR TRENCHING WORKS. 9. CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.
4. CONTRACTOR TO LOCATE AND PROTECT ALL EXISTING SERVICES ON SITE PRIOR TO Project No. Discipline Status
10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND SERVICES 20210041 CIVIL OPW
S
COMMENCEMENT OF WORKS.
WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O. Designed By Drawn By Scale
5. CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR TO ANY DEMOLITION WORKS 1:100 (at
11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS TO CARRY BRP BRP A1)
COMMENCING ON SITE.
OUT SERVICES RELOCATION OR ALTERATIONS. Drawing No. Revision
C01 B
S
Section 4
OP WORKS
ISSUE
CP
BUP13648
TURF STRIP
PROVIDE 600MM WIDE GRASS FILTER
STRIP BEHIND KERB DOWNSTREAM OF
DISTURBED EARTH IN VERGE PROVIDE CONSTRUCTION
SHAKEDOWN ENTRY AS PER SEDIMENT FENCE
PROVIDE CATCH DRAIN TO UPSTREAM //
N
NSC STD DWG ESC-01
PROPERTY BOUNDARY FOR FLOW
31.75 DIVERSION
30.68
KERB INLET FILTER
//
33.67
//
//
// // // // // // //
// // // // // // // // // // // // // // // // // // // // // // // // //
// // // // // // // // // // //
34.38
//
CONSTRUCTION ENTRY
//
35.00
//
bottlebrush avenue 32.63
//
34.5
33.5
35
32.5
34
30.5
31.5
29.5
33
29.5
32
30
31
//
//
35.02 CATCH DRAIN
//
//
//
35.11
//
30.75
//
138
//
//
//
//
127
RP88934
//
31.70
//
RP88934
//
30.93
//
//
33.69
//
//
//
35.13
//
35.11
//
35.08
//
32.05 33.46
//
29.68 30.99
//
SW GRATE
//
30.5
31.5 33 33 33.93
30
34.41
31
32.5
//
31
32
32.59 .5
34
34
35
//
36.
34.99
36
.5
//
// //
5
//
// // //
// // // // // // // // // // // // // // // // // // // // // // // // //
// // // // // //
//
// // // // // // // // // // // // // // // // // // // // // // // // // // //
// //
//
// // // // // // //
30.98 35.85
PROVIDE SEDIMENT FENCE TO PROVIDE FABRIC WRAP INLET STORMWATER DRAINAGE TO BE
PROVIDE KERB INLET FILTER AS
DOWNSTREAM BOUNDARY AS PER PROTECTION TO PITS DURING INSTALLED FOR FLOW DIVERSION.
PER NSC STD DWG ESC-03 1
NSC STD DWG ESC-04 & ESC-05 CONSTRUCTION WORKS AS PER REFER ROADS AND DRAINAGE
NSC STD DWG ESC-02 LAYOUT FOR DETAIL GTP2033
CP
GTP2033
25/02/2022
EA ID: 2557785
RPEQ: 26443
DO NOT SCALE, IF IN DOUBT ASK!
SEDIMENT RELEASE GUIDELINES ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. (IECA) BEST PRACTICES STANDARD DRAWING ESC-03 KERB INLET
1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN SUCH AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF SEDIMENT TRAPS
1. ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS ACCORDANCE WITH INTERNATIONAL EROSION CONTROL DEEMED NECESSARY AND RELEVANT.
OTHERWISE NOTED IN THIS STANDARD, MUST NOT EXCEED THE ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE REVEGETATION B 22/02/22 UPDATE FOR RFI BRP NW
FOLLOWING LIMITS: SPECIFICATIONS. 9. OVERALL 13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO A 01/12/21 ISSUED FOR OPW BRP MVP
1.1. 50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM 2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA Rev Date Description By Chk
CONCENTRATION; REQUIREMENTS. IT IS THE CONTRACTORS RESPONSIBILITY TO AROUND THE WORK SITE WHERE POSSIBLE. (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION REPORTING
1.2. TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND; INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED NECESSARY b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE GENERAL. 18. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC
1.3. pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, THROUGHOUT CONSTRUCTION. INSTALLED AND BE OPERATIONAL BEFORE COMMENCING MAINTENANCE AND CONTROL OF ALL STAGES OF WORK FOR
AND TO THE EXTENT THAT, THE NATURAL RECEIVING WATERS 3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT UP-SLOPE EARTHWORKS. FIELD INLET APPROVAL BY THE SUPERINTENDENT.
LIE OUTSIDE THIS RANGE. CONTROL DEVICES IN A FUNCTIONAL ORDER AND REPLACE ALL c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, 14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO
2. THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF EXPOSED SURFACES TO BE EITHER MULCHED, COVERED WITH INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA MAINTENANCE SCHEDULE
EXCEED 50mg/L WHERE IT CAN BE DEMONSTRATED AND SUPPORTED MAINTENANCE OF WORKS. EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE (IECA) BEST PRACTICES STANDARD DRAWING ESC-02 GRATED TIMEFRAME FOR COMPLETION
THROUGH DOCUMENTATION THAT: 4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS. STORMWATER (FIELD) INLET SEDIMENT TRAP.
ESC MEASURES MAINTENANCE TRIGGER
OF MAINTENANCE [email protected]
2.1. FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR SATISFACTION OF THE SUPERINTENDENT. SHALL BE COMPLETED AND SEDIMENT BASISIN WHEN SETTLED SEDIMENT EXCEEDS THE WITHIN 7 DAYS OF THE
BEFORE THE TSS CONCENTRATION IS LIKELY TO BE REDUCED EFFECTIVE PRIOR TO: SEDIMENT FENCE VOLUME OF THE SEDIMENT STORAGE INSPECTION 37 MARY ST NOOSAVILLE, QLD
OPERATION AND MAINTENANCE ZONE (SEE COUNCIL'S SEDIMENT BASIN
TO 50mg/L; a. STRIPPING OF TOPSOIL AND GRASS. 10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER 15. IN ACCORDANCE WITH NC ESC GUIDELINES, ALL ESC MEASURES DESIGN GUIDELINES 07 5211 1003
2.2. RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED b. BULK EARTHWORKS TO THE SITE. TO INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA SHALL BE INSPECTED: Client
SOLIDS WILL RESULT IN A BETTER ENVIRONMENTAL OUTCOME c. SERVICES INSTALLATION. (IECA) BEST PRACTICES STANDARD DRAWINGS SF-01 AND SF-02 · AT LEAST DAILY (WHEN WORK IS OCCURRING ON SITE) OR
OTHER ESC MEASURES THE CAPACITY OF ESC MEASURES IS
EXCEEDED
BY THE END OF THE DAY
NOVATO GROUP
BY PROVIDING STORAGE FOR THE CAPTURE AND TREATMENT d. PAVEMENT CONSTRUCTION SEDIMENT FENCE. WEEKLY (WHEN WORK IS NOT OCCURRING ON SITE) Project Name
OF RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF. 5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE · WITHIN 24 HOURS OF EXPECTED RAIN; AND 27 BOTTLEBRUSH AVE
2.3. ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN UNTIL INSTRUCTION IS RECEIVED IN WRITING FROM THE TEMPORARY CONSTRUCTION ENTRY/EXIT · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E. AN EVENT OF
TO TREAT THE WATER WITHIN BEST-PRACTICE TIME FRAMES; SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL 11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND
NOOSA HEADS
SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON
2.4. FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE APPLICATIONS. SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL SITE).
CONCENTRATION OF TSS IN THE CAPTURED WATER HAS 6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD 17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC
SHALL BE READ IN CONJUNCTION WITH THE APPROVED DRAWINGS. SEDIMENT AND EROSION CONTROL: Title
ALREADY SIGNIFICANTLY DECREASED. DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING CONTRACTOR TO ALLOW FOR PROVISION OF ALL REQUIRED EROSION AND SEDIMENT CONTROL PLAN
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES 7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING TABLE: SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE
FROM THE SITE, THE RELEASE LIMIT PRESCRIBED IN (1a) ABOVE MUST OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION WITH IECA AND NOOSA SHIRE COUNCIL POLICIES AND
NOT BE EXCEEDED UNLESS THE DEVELOPMENT IS IN FULL SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE GRID. GUIDELINES
COMPLIANCE WITH THIS STANDARD. MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO KERB INLET
BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE 12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO Project No. Discipline Status
SEDIMENT CONTROL UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS' INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA 20210041 CIVIL OPW